Loading...
HomeMy WebLinkAbout2014 CON PAL General Engineering - 8th Street Smart Growth Revitalization - Change Order #7+►» CALIFORNIA NATIONAL CITy 3 L- nrooai:owerso 8TH STREET SMART GROWTH REVITALIZATION Specification #12-13 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 7 March 5, 2014 Reason/Purpose for this Change Order: The street light standards and fixtures, decorative poles and project lights are not part of the original contract. This change order provides for the procurement of all the street light standards, LED fixtures, decorative poles and projection lights for under the 1-5 overpass that are required for the completion of the, street lighting and art elements of the project. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall procure and provide all the street light standards and LED fixtures, decorative poles and projection lights to be installed under bid items 58, 59, 60, 61, 64, 65 and 66 in accodance with the amended lighting plan in the quantities shown on Attachment "A". The lump sum price for all of the street light standard, LED fixtures, decorative poles and projection lights detailed on attachment "A" is $707,769.09. All materials shall be in compliance with the approved submittals. This amount does not include the adjustment for bond costs. The amount for bonds will be adjusted at the end of the project when the final total project costs are determined. The Contractor will order all the materials listed herein for beginning delivery on June 16, 2012. Original Contract Amount $ 3,709,079.35 (213.22) 3,708,866.13 Amount of this change order 707,769.09 New contract amount Working days added: 0 Submitted by: Net change by previously authorized Change Orders Subtotal )ect Man Approved by: Cingin'eer Working days subtracted: 0 '/i/1Y Date Date 6c� $ 4,416,635.22 Percent change in Contract to date 19.08% Resident Engineer Date MAYOR r,required for Change Orders >$24,999 e By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.: ame: Y/ i/2 0 /' Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA.-- NATIONAL CITY rdiCUAlOA1I1'� 8TH STREET SMART GROWTH REVITALIZATION Specification #12-13 CHANGE ORDER NO. 7, Attachment "A" DATE: March 5, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Purchase of Light Fixtures and Poles for Sth Street Smart Growth MATERIALS Unit Qty Rate Total 1 Bid Item 'A' - LT1 Vehicle & Combo Ped Light 1 22.00 6,419.60 141,231.20 2 Bid Item '8' - LT1-2 Twin Vehicle Light 1 5.00 7,448.90 37,244.50 3 Bid Item 'C' - LT1 w/ LED Projection Light 1 8.00 7,427.00 59,416.00 4 Bid Item'D' - Single Acorn - LT3-12' Pole 1 49.00 3,016.17 147,792.33 5 Bid Item 'E'- Twin Acorn- LT3-16'Pole 1 17.00 5,647.17 96,001.89 6 Bid Item 'F' - 23' Pole only w/ Deco Base 1 8.00 3,078.16 24,625.28 7 Projector Lights 1 8.00 1,614.16 12,913.28 8 Bid Item #64 - LED Lights only for Poles 1 8.00 2,937.70 23,501.60 Sub -Total Materials: Tax Total: Subcontractor Materials Markup (150/0): Prime Contractor Materials Markup (5%): TOTAL COST: $ 542,726.08 $ 43,418.09 $ 87,921.63 $ 33,703.29 $ 707,769.09 RESOLUTION NO. 2014 — 30 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 7 TO THE 8TH STREET SMART GROWTH REVITALIZATION CONTRACT WITH PAL GENERAL ENGINEERING, INC., FOR THE LUMP SUM AMOUNT OF $707,769.09 TO PROCURE ALL STREET LIGHT STANDARDS AND LED FIXTURES, DECORATIVE POLES, AND PROJECTION LIGHTS CONSISTENT WITH THE AMENDED LIGHTING PLAN AND PROJECT SPECIFICATIONS WHEREAS, on June 18, 2013, City Council adopted Resolution No. 2013-97, awarding a contract in the amount of $3,709,079.35 to PAL General Engineering, Inc., for the 8th Street Smart Growth Revitalization Project (the "Project"); and WHEREAS, a lighting plan and lighting specifications were included as part of the bid documents, however, contractors were only asked to provide unit pricing for installation of associated line items of work, as staff had originally planned on going through a separate procurement process for the street light standards, LED fixtures, decorative poles and projection lights; and WHEREAS, after contract award, unforeseen challenges arose that preclude the City from procuring and safely storing the street lights and associated materials during construction; and WHEREAS, Change Order No. 7 is necessary for PAL General Engineering, Inc., to procure the lights and accept liability for ensuring the lights are shipped, stored, and delivered to the job site undamaged, and there is no competitive advantage to exploring further options for procurement. NOW, THEREFORE, BE IT RESOLVED that the City Council hereby authorizes the Mayor to execute Change Order No. 7 to the 8th Street Smart Growth Revitalization contract with PAL General Engineering, Inc., for the lump sum amount of $707,769.09 to procure the lights and accept liability for ensuring the lights are shipped, stored, and delivered to the job site undamaged. Said Change Order No. 7 is on file in the office of the City Clerk. PASSED and ADOPTED this 18th day of March, 2$ on Morrison, Mayor ATTEST: Mik Dalla City Fk A aii Lin, • , .ia liii City Att. Cle D AS TO FORM: acitua Silva y Passed and adopted by the Council of the City of National City, California, on March 18, 2014 by the following vote, to -wit: Ayes: Councilmembers Cano, Morrison, Natividad, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California K/I/ld- City C erk of the City National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2014-30 of the City of National City, California, passed and adopted by the Council of said City on March 18, 2014. City Clerk of the City of National City, California By: Deputy CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT } • ETING DATE: March 18, 2014 AGENDA ITEM NO. 8 ITEM TITLE: Resolution of the City Council of the City of National City authorizing the Mayor to execute Change Order No. 7 to the 8th Street Smart Growth Revitalization contract (Specification No. 12-13) with PAL General Engineering, Inc. for the lump sum amount of $707,769.09 to procure all street light standards and LED fixtures, decorative poles and projection lights consistent with the amended lighting plan and project specifications (funded by SANDAG SGIP Grant). PREPARED BY: Stephen Manganiello PHONE: 336-4382 EXPLANATION: See attached. FINANCIAL STATEMENT: ACCOUNT NO. DEPARTMENT: Engineering & Public Works APPROVED BY: APPROVED: • W Finance APPROVED: MIS Funds are available in account #321-409-500-598-3918 (SANDAG TransNet SGIP Grant — 8th St Smart Growth Revitalization) ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: STAFF RECOMMENDATION: Adopt the Resolution. BOARD ! COMMISSION RECOMMENDATION: N/A 'TACHMENTS: 1. Explanation 2. Change Order No. 7 3. Resolution c t '-+ - ?... 0 EXPLANATON On June 18, 2013, City Council adopted Resolution No. 2013-97 awarding a contract in the amount of $3,709,079.35 to PAL General Engineering, Inc. for the 8th Street Smart Growth Revitalization Project (Specification No. 12-13.) A lighting plan and lighting specifications were included as part of the bid documents. However, contractors were only asked to provide unit pricing for installation of associated line items of work, as staff had originally planned on going through a separate procurement process for the street light standards, LED fixtures, decorative poles and projection lights. After contract award, unforeseen challenges arose that preclude the City from procuring and safely storing the street lights and associated materials during construction. Therefore, staff has requested a quote from the contractor to procure the lights and accept liability for ensuring the lights are shipped, stored and delivered to the job site undamaged. Staff's estimate for procuring the street lights and associated materials, which was prepared prior to contract award, was $700,000. The contractor's lump sum change order request is for $707,769.09, which only exceeds staff's estimate by approximately 1%. Therefore, staff recommends executing the change order with PAL General Engineering, as the amount is fair and reasonable, the contractor accepts liability for the materials, and there is no competitive advantage to exploring further options for procurement. 'e- "CA LiF0,1tNIA ku ,cfry u6cos;r4er 8TH STREET SMART GROWTH REVITALIZATION Specification #12-13 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 7 March 5, 2014 Reason/Purpose for this Change Order: The street light standards and fixtures, decorative poles and project lights are not part of the original contract. This change order provides for the procurement of all the street light standards, LED fixtures, decorative poles and projection lights for under the 1-5 overpass that are required for the completion of the, street lighting and art elements of the project. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall procure and provide all the street light standards and LED fixtures, decorative poles and projection lights to be installed under bid items 58, 59, 60, 61, 64, 65 and 66 in accodance with the amended lighting plan in the quantities shown on Attachment "A". The lump sum price for all of the street light standard, LED fixtures, decorative poles and projection lights detailed on attachment "A" is $707,769.09. All materials shall be in compliance with the approved submittals. This amount does not include the adjustment for bond costs. The amount for bonds will be adjusted at the end of the project when the final total project costs are determined. The Contractor will order all the materials listed herein for beginning delivery on June 16, 2012. Original Contract Amount $ 3,709,079.35 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 (213.22) 3,708,866.13 707,769.09 Percent change in Contract to date 19.08% 4,416,635.22 Submitted by: Date Approved by: City/�ngireer % Date r,required for Change Orders >$24,999 Date Resident Engineer Date //Y By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above et that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, inc.: hornt,fi k ame: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 -1- Telephone (619) 336-4380 `CAL,FO,RIOA --v - NATO 8TH STREET SMART GROWTH REVITALIZATION Specification #12-13 ` - `^rEOarOKeT80 CHANGE ORDER NO. 7, Attachment "A" DATE: March 5, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Purchase of Light Fixtures and Poles for 8th Street Smart Growth MATERIALS Unit Qty Rate Total 1 Bid Item 'A' - LT1 Vehicle & Combo Ped Light 1 22.00 6,419.60 141,231.20 2 Bid Item'B' - LT1-2 Twin Vehicle Light 1 5.00 7,448.90 37,244.50 3 Bid Item'C' - LT1 w/ LED Projection Light 1 8.00 7,427.00 59,416.00 4 Bid Item 'D' - Single Acorn - LT3-12' Pole 1 49.00 3,016.17 147,792.33 5 Bid Item 'E' - Twin Acorn- LT3-16' Pole 1 17.00 5,647.17 96,001.89 6 Bid Item'F' - 23' Pole only w/ Deco Base 1 8.00 3,078.16 24,625.28 7 Projector Lights 1 8.00 1,614.16 12,913.28 8 Bid Item #64 - LED Lights only for Poles 1 8.00 2,937.70 23,501.60 Sub -Total Materials: Tax Total: Subcontractor Materials Markup (15%): Prime Contractor Materials Markup (5%): TOTAL COST: $ 542,726.08 $ 43,418.09 $ 87,921.63 $ 33,703.29 $ 707,769.09 RESOLUTION NO. 2014 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 7 TO THE 8TH STREET SMART GROWTH REVITALIZATION CONTRACT WITH PAL GENERAL ENGINEERING, INC., FOR THE LUMP SUM AMOUNT OF $707,769.09 TO PROCURE ALL STREET LIGHT STANDARDS AND LED FIXTURES, DECORATIVE POLES, AND PROJECTION LIGHTS CONSISTENT WITH THE AMENDED LIGHTING PLAN AND PROJECT SPECIFICATIONS WHEREAS, on June 18, 2013, City Council adopted Resolution No. 2013-97, awarding a contract in the amount of $3,709,079.35 to PAL General Engineering, Inc., for the 8th Street Smart Growth Revitalization Project (the "Project"); and WHEREAS, a lighting plan and lighting specifications were included as part of the bid documents, however, contractors were only asked to provide unit pricing for installation of associated line items of work, as staff had originally planned on going through a separate procurement process for the street light standards, LED fixtures, decorative poles and projection lights; and WHEREAS, after contract award, unforeseen challenges arose that preclude the City from procuring and safely storing the street lights and associated materials during construction; and WHEREAS, Change Order No. 7 is necessary for PAL General Engineering, Inc., to procure the lights and accept liability for ensuring the lights are shipped, stored, and delivered to the job site undamaged, and there is no competitive advantage to exploring further options for procurement. NOW, THEREFORE, BE IT RESOLVED that the City Council hereby authorizes the Mayor to execute Change Order No. 7 to the 8th Street Smart Growth Revitalization contract with PAL General Engineering, Inc., for the lump sum amount of $707,769.09 to procure the lights and accept liability for ensuring the lights are shipped, stored, and delivered to the job site undamaged. Said Change Order No. 7 is on file in the office of the City Clerk. PASSED and ADOPTED this 18th day of March, 2014. Ron Morrison, Mayor ATTEST: Mike Dalla, City Clerk APPROVED AS TO FORM: Claudia Gacitua Silva City Attorney CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk PAL GENERAL ENGINEERING Change Order #7 8th Street Smart Growth Revitalization Lynn Cole (Engineering / Public Works) Forwarded Copy of Change Order to PAL General Engineering