HomeMy WebLinkAbout2014 CON Ramona Paving and Construction - 8th Street Safety Enhancement Project - Change Order #1 #2 #3 #4 #58TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
Contractor: Ramona Paving and Construction Corp.
!Reason/Purpose for this Change Order:
!Due to the soundness of the existing street sections the City Engineer directed to change line item no. 13, 6"
Type B-1 Median Curb per SDRSD No. G-6, to 6" Type B-3 Median Curb per SDRSD No. G-6. The 6" Type B-3
:Median Curb shall include dowelling to the existing pavement and rebar as a no change in cost from the original
lineal foot price. There is a 6" thick concrete section that is below the existing payment that is an unforseen
!condition. By allowing the existing pavement to remain under the B-3 curb the saving for not removing and
':disposing of that street section is offset by the additional excavation and disposal of the concrete in the planter
and trench areas.
L.
! The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agrees to change line item no. 13 from, 6" Type B-1 Median Curb per SDRSD No.
1G-6, to, 6" Type B-3 Median Curb per SDRSD No. G-6. The orginal bid price of $27 per linear foot shall be the
:same for the Type B-3 Median Curb and shall include dowelling into the pavement and rebar. The bid item no.7
for Unclassified Excavation shall remain the same because of offsetting excavation quantities and there shall be
no additional costs to the Ctiy.
CHANGE ORDER NO. 1
February 13, 2014
Original Contract Amount $ 1,199,139.75
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
1,199,139.75
New contract amount $
Working days added: 0 Working days subtracted: 0
Submitted by:
LCi �En Ineer
ty gm...nmmm�. K
.?/2)41,
Date City Manager, required for Chan a Orders 424999 Date
Percent change in Contract to date 0.00%
1,199,139.75
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etcand that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
'Accepted and agreed to Ramona P ing and Construction Corp
i Name:
Note to Co If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you ay proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
--» CALIFORNIA .K.
NoIONAL airy
=NCORPORAT�D
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
Contractor: Ramona Paving and Construction Corp.
CHANGE ORDER NO. 2
March 12, 2014
Reason/Purpose for this Change Order:
On December 10, 2013 extra work was conducted by Select Electric during conduit installation when an old
telephone vault was discovered on the south side of 8th Street across from M Avenue and had to be taken out to
proceed. The work proceeded by time and materials under the direction of the Engineer.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agree that the Contractor shall remove and dispose of the old telephone vault that is
in conflict with the conduit installation. The total time, equipment and materials including all associated costs for
this work is the amount as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
1,199,139.75
1,199,139.75
533.57
New contract amount $
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 0.04%
Submitted by:
Pr
Approved by:
Date
CitfEngineer / Date
Resident Engineer
1,199,673.32
City Manager required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Ramona Paving and Construction Corp.:
Name: Da
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA —�
NATIONAL CITY
any
INCORPORATED
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
CHANGE ORDER NO. 2, Attachment "A"
DATE: December 10, 2013
WORK PERFORMED BY: Select Electric, Inc.
DESCRIPTION OF WORK: Worked Delayed by Old Telephone Vault
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
Laborer
Hour
2.00
51.66
103.32
2)
Electrician
Hour
2.00
34.89
69.78
3)
Operator
Hour
2.00
62.92
125.84
4)
Laborer
Hour
2.00
49.03
98.06
Sub -Total Labor:
Labor Burden (120/0):
Labor Markup (200/0):
TOTAL LABOR:
$ 397.00
$ 47.64
$ 88.93
$ 533.57
Total Labor: $
Markup (5%): $
533.57
26.68
TOTAL: $ 533.57
0— CALIFORNIA —w
NATIONAL cITV
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
Contractor: Ramona Paving and Construction Corp.
Reason/Purpose for this Change Order:
On January 10, 2014 extra work was conducted by Select Electric to remove concrete and rebar that was in
conflict with a street light foundation on the south side of 8th street at Station 16+32. The work proceeded by
time and materials under the direction of the Engineer.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agree that the Contractor shall remove the concrete and rebar in conflict with the
street light foundation. The total time, equipment and materials including all associated costs for this work is the
amount as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,199,139.75
Net change by previously authorized Change Orders...
CHANGE ORDER NO. 3
March 12, 2014
533.57
1,199,673.32
Amount of this change order 725.74
New contract amount
Subtotal
Working days added: 0 Working days subtracted: 0
Submitted by:
iJJU'
t Manager/ Date
Approved by:
ngineer
1,200,399.06
Percent change in Contract to date 0.11 %
Resident Engineer
Date City Manager,required for Chanqe Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor wit provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance. profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
[Accepted and agreed to by Ramona Paving and Construction Corp'
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA -►
NATIONAL CI
acme
INCORPORATED
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
CHANGE ORDER NO. 3, Attachment "A"
DATE: January 10, 2013
WORK PERFORMED BY: Select Electric, Inc.
DESCRIPTION OF WORK: Break concrete and rebar in conflict of foundation
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
Laborer
Hour
4.00
51.66
206.64
2)
Electrician
Hour
4.00
34.89
139.56
Sub -Total Labor:
$ 346.20
Labor Burden (12%):
$ 41.54
Labor Markup (20%):
$ 77.55
TOTAL LABOR:
$ 465.29
EQUIPMENT
Unit
QtY
Rate
Total
1)
2)
Truck T&TT
Hour
4.00
35.39
141.56
AIRCP Port
Hour
4.00
21.23
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
Total Labor:
Total Equipment:
Markup (5%):
TOTAL:
$
84.92
226.48
$ 33.97
$ 260.45
465.29
260.45
36.29
725.74
CALIFORNIA-
NATIONTmA�]L CITy
INCORPORATED .J
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
Contractor: Ramona Paving and Construction Corp.
CHANGE ORDER NO. 4
March 12, 2014
Reason/Purpose for this Change Order:
On January 16, 2014 extra work was conducted by Select Electric to chase the unknown cable in conflict with
the street light foundation on the south side of 8th street at Station 16+95. The work proceeded by time and
materials under the direction of the Engineer.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agree that the Contractor shall proceed with the investigation of the unknown cable
in conflict with the street light foundation. The total time, equipment and materials including all associated costs
for this work is the amount as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount
$ 1,199,139.75
Net change by previously authorized Change Orders 1,259.31
Subtotal
Amount of this change order
New contract amount $ 1,201,552.14
Working days added: 0
Submitted by:
1,200,399.06
1,153.08
ct Manage
Approved by:
En
Working days subtracted: 0 Percent change in Contract to date 0.20%
/74
Date
l sident Engineer
313fl..
Date
City Manager required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Ramona Paving and Construction Corp.:
Name:
Note to Contra or: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
+— CALIFORNIA
NATIONAL CIS
- INaoapoRATED -
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
CHANGE ORDER NO. 4, Attachment "A"
DATE: January 16, 2014
WORK PERFORMED BY: Select Electric, Inc.
DESCRIPTION OF WORK: Chasing the unknown cable in conflict
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
Laborer
Hour
8.00
51.66
413.28
2)
Electrician
Hour
6.00
34.89
209.34
Sub -Total Labor:
$ 622.62
Labor Burden (12%):
$ 74.71
Labor Markup (20%):
$ 139.47
TOTAL LABOR:
$ 836.80
EQUIPMENT
Unit
Qty
Rate
Total
1)
2)
Truck T&TT
Truck T&TT
Hour
Hour
4.00
4.00
21.43
35.39
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$
85.72
141.56
227.28
34.09
$ 261.37
Total Labor: $ 836.80
Total Equipment: $ 261.37
Markup (5%): $ 54.91
TOTAL: $ 1,153.08
0-, CALIFORNIA r+.
NATIONAL CITY
�aaaL) txcoseossTSD
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
Contractor: Ramona Paving and Construction Corp.
CHANGE ORDER NO. 5
March 28, 2014
Reason/Purpose for this Change Order:
An unforeseen sewer lateral was discovered during the excavation of the wall on the south side of 8th Street.
Extra work was conducted to excavate around the lateral and replace with new material. The work proceeded by
time and materials under the direction of the Engineer.
The City of National City and Contractor agree to the following change to the original Contract:
The Contractor and the City agree that the Contractor shall proceed with the installation of the sewer lateral
behind the masonry wall. The total time, equipment and materials including all associated costs for this work is
the amount as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount. $ 1,199,139.75
Net change by previously authorized Change Orders 2,412.39
Subtotal
Amount of this change order
New contract amount $
Working days added: 0 Working days subtracted: 0
Submitted by:
Approved by:
1,201,552.14
5,097.10
Percent change in Contract to date 0.63%
1,206,649.24
Date City_Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Acce.ted and a reed to by Ramona Paving and Construction Corp.:
Name:
Note to Cractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
«— CALIFORNIA ^«
NATIONAL Cjlr
�`'°�)
INCORPORATED
8TH STREET SAFETY ENHANCEMENTS PROJECT
Specification #12-15
CHANGE ORDER NO. 5, Attachment "A"
DATE: March 13, 2014
WORK PERFORMED BY: Ramona Paving
DESCRIPTION OF WORK: Extra Work for Unknown Sewer Lateral
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
Equip. Operator
Flour
17.00
72.84
1,238.28
2)
Laborer
Hour
17.00
55.60
945.20
3)
Foreman
Hour
2.00
72.84
145.68
Sub -Total Labor:
$ 2,329.16
Labor Burden (120/0):
$ 279.50
Labor Markup (200/0):
$ 521.73
TOTAL LABOR:
$ 3,130.39
MATERIALS
Unit
Qty
Rate
Total
1)
Pipe Materials
LS
1.00
$ 607.35
$ 607.35
Sub -Total Materials:
Materials Markup (15%):
TOTAL MATERIALS:
$ 607.35
$
91.10
$ 698.45
EQUIPMENT
Unit
Qty
Rate
Total
1)
Excavator
Hour
4.00
78.98
315.92
2)
Backhoe
Hour
7.00
47.65
333.55
3)
Skiploader
Hour
6.00
42.36
254.16
4)
Mini -Excavator
Hour
5.00
39.84
199.20
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 1,102.83
$ 165.42
$ 1,268.25
Total Labor: $ 3,130.39
Total Equipment: $ 1,268.25
Total Materials: $ 698.45
TOTAL: $ 5,097.10