HomeMy WebLinkAbout2014 CON EC Constructors - 1726 Wilson Ave Tenant Site Improvements Sp 13-06 - Change Order #12e— CAUFORNIA .a
NATioNA Laozv
fl r
TNCBllf'OIIATICD
1726 WILSON AVENUE TENANT AND SITE IMPROVEMENTS
Specification No. 13-06
Contractor: EC Constructors, Inc.
CHANGE ORDER NO.12
April 7, 2014
Reason/Purpose for this Change Order:
An additional connection and check valve is required to be installed in the outlet side of the Backflow Preventer
as shown Sheet C-03 of the Plans.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall provide and install additional Fire Department
Connection and Check Valve for the outlet side of the Backflow preventer per Fire Department standards and
regulation. The agreed aupon lump sum price for all the costs of this work is $635.86.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal...
Amount of this change order
831,515.00
83,634.76
915,149.76
635.86
New contract amount $
Working(ayiarhided: 0
Working days subtracted: 0
Percent change in Contract to date 10.13%
915, 785.62
Submitt-d b
.•-r
vc—y
i-7�
IPro'e�
Da
Approved by:
City ngineer Date
City Mana9er, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to b/y� EC Constructors, Inc.:
C\isr( /"
Name: �; Date
Note to Contractor: If yo o not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
4/701,
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
+}-• CALIFORNIA !*
NATIONAL CITy
INCORPORATED
1726 WILSON AVENUE IMPROVEMENTS
Specification #13-06
DATE: April 7, 2014
CHANGE ORDER NO. 12
WORK PERFORMED BY: EC Constructors, Inc.
DESCRIPTION OF WORK: Installation of the FDC and Check Valve for Backflow Preventer per
Fire Department
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Rate
Total
1)
FDC and Check Valve installation
Total
1.00
605.58
605.58
Sub -Total:
Prime Markup for Sub (5%):
TOTAL:
$ 30.28
$
.86
GRAND TOTAL:
$ 635.86
$ 605.58
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
EC CONSTRUCTORS
Change Order #12
1726 Wilson Avenue Tenant & Site Improvements
Spec. No. 13-06
Judy Hernandez (Engineering) Forwarded Copy of
Change Order to EC Constructors