HomeMy WebLinkAbout2014 CON Cisco Fire Protection - Sprinkler Flapper Valve Removal - 922 West 23rd Street - Change Order #3CALIFORNIA *� NATIONAL CITY atatt L. IAannenv •TgO-/ FIRE SPRINKLER SYSTEM AND FLAPPER VALVE REMOVAL AT 922 W. 23RD ST CHANGE ORDER NO.3 Specification No. N/A (Emergency Work) Contractor: Cosco Fire Protection, Inc. January 31, 2014 Reason/Purpose for this Change Order: Change Order #1 was for anticipated overtime work and for anticipated fire watch hours. After completion of the project the final actual use of overtime hours and fire watch hours are confirmed and the actual costs are lower than what was anticipated. This change order deducts unused funds from Change Order #1. Additionally, the enitire fire sprinkler system was inspected at the end of the job and deficiencies were found. The required repairs shall be fixed by Cosco for a lump sum of $1564.00 as per attached report. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall conduct necessary repairs as per attached report dated 12/27/2013 for a lump sum price of $1564.00 and there shall be no additional costs. Further, the Contractor and the City agree that the total amount of $841.56 shall be deducted from Change Order #1 for overtime hours and fire watch hours anticipated but not actually utilized plus adding the cost of $1564.00 for the repairs. (See Attachment "A" for breakdown of costs). Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 23, 089.00 8,580.80 31,669.80 (841.56) Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 33.52% 30,828.24 Submitted by: Project Manager I 0-LI - 1_ 1 Date N/A City Project Manager Date Approved by: 2 .. ...... City ngineer Z Z /2 6 // Y Date N/A City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to Cosco Fire Protection, Inc.: Name: f -I 7- Date Note to Cohtractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA + NA,TI°NA CH7 FIRE SPRINKLER SYSTEM AND FLAPPER VALVE REMOVAL CHANGE ORDER NO. 3, Attachment "A" Specification #N/A (Emergency Work) DATE: January 31, 2014 WORK PERFORMED BY: Cosco Fire Protection, Inc. LABOR - ADJUSTED OVERTIME HOURS Qty Rate Total 64 hours overtime maximum at $49/h per Change Order #1 64.00 49.00 3,136.00 Actual overtime taken was 10 hours at $49/h 10.00 49.00 490.00 Difference (2,646.00) FIRE WATCH - ADJUSTED HOURS Qty Rate Total 24 hours maximum at $35/h per change order #1 24.00 35.00 840.00 Actual hours used 14.25. Actual hourly rate $72.21 + 5% mark up = 75.82/h 14.25 75.82 1,080.44 Difference 240.44 REPAIR COST AS PER INSPECTION (new item) Qty Rate Total Repair of all deficiencies as per attached inspection report dated 12/27/2013 1.00 1,564.00 1,564.00 1564.00 TOTAL PER THIS CHANGE ORDER (841.56) ***Please note, this is a deductive change order*** CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk COSCO FIRE PROTECTION Change Order #3 Fire Sprinkler Systems & Flapper Valve Removal at 922 West 23rd Street in National City Judy Hernandez (Engineering) Forwarded Copy of Change Order to Cosco Fire Protection