HomeMy WebLinkAbout2014 CON EC Constructors - National City Aquatic Center Sp 13-04 - Change Order #1+- CALIFORNIA —� NATIONAL CI fl ,I yj NATIONAL CITY AQUATIC CENTER CHANGE ORDER NO. 1 Specification # 13-04. January 16, 2014 Contractor: EC CONSTRUCTORS Reason/Purpose for this Change Order: There is currently no utility easement servicing the Aquatic Center site. An easement needs to be established for electrical, gas and communications. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor's surveyor will provide all the services described in Exhibit "A" and provide a meets and boundslega description of the easement to the satisfaction of the Port of San Diego and San Diego Gas & Electric for the lump sum price of $5,087. Original Contract Amount $ 3,524,896.00 Net change by previously authorized Change Orders Subtotal 3,524,896.00 Amount of this change order 5,087.00 New contract amount $ 3,529,983.00 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 0.14% Submitted by: City Engineer Resident Engineer Date z-zl-/y Date City Manager, required for Change Orders >$24 999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by EC CONSTRUCTORS, Inc. Z f zo (i. Name: I\ \ Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 c CONSTR1LT4CT`ORSS Inc. L2CtMffiSE aTO. ss64177 9834 River Street Lakeside, CA 92040 Ph. (619) 440-7181 Fax (619) 440-7180 Project: National City Aquatics Job No.: 209 - CP05 Date: 2/4/2014 CONTRACTOR'S CHANGE ORDER ESTIMATE Scope of Change: Add'I Survey for SDG&E Easement a) Material Cost (See Breakdown) b) Labor Cost (See Breakdown) c)Equipment Cost (See Breakdown) d) Labor Burden (Gen. Liability, Builders Risk, Work Comp., Soc. Security, Unemployment) e) Subtotal GC Work f) GC Markup on Self Performed labor f) GC Markup on Self Performed Material & Equipment g) Subtotal h) Subcontractor Costs i) Subcontractor O/H & P Included On Subs Quote Attached i) Gen. Contractor's O/H & Profit on subcontractors j) Subtotal k) Bond Premium crab at Project Completion) I) TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,845.00 $0.00 $242.00 $5,087.00 $0.00 $5,087.00 In addition to the cost indicated above, the Contractor also requires 0 additional days added to the contract completion date for implementation of this change order. (See attached forjustificaton of time extension if required) Kenny Kubia 209 - CP 005 Survey for SDG&E Easement 3441 Vista De La Cresta Escondido CA 92029 Voice: (760) 738-9636 Fax: (760) 738-8649 HOPWOOD LAND SURVEYING SURVEYING PROPOSAL NATIONAL CITY AQUATIC CENTER Date: 1/28/14 SCOPE OR WORK 1. Research and calculations prior to and in preparation for field survey. 2. Establish survey control using Record of Surveys 17520, 16668 and 17055. 3. Locate SDG & E structures and lines from the intersection of West 32nd Street and Goesno Place to the proposed National City Aquatic Center. Location of the lines will be determined by utility mark out. Only those structures visible and above ground will be included. 4. Tie the SDG & E structures and lines into NAD 83 first order control as shown on Record of Surveys 16668 and 17055. 5. Attend 2 meeting to determine extent of the easement prior to the easement being written. 6. Provide the body of the legal description for those structures and lines. FEE: $ 4,845 c)I NI, (I CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk EC CONSTRUCTORS Change Order #1 National City Aquatic Center Judy Hernandez (Engineering) Forwarded Copy of Change Order to EC Constructors