Loading...
HomeMy WebLinkAbout2014 CON PAL General Engineering - Community Corridor Improvement Project SP #12-05 - Change Orders #13 #14 #15 #16 #17 #18 #19 #20 #21-0+CALIFORNIA NATIONAL CITI, l�Cd� bRPoRA'rio Y COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 13 July 3, 2014 Reason/Purpose for this Change Order: April 10, 2014 the Contractor departed site with hazardous and unsafe conditions within the pedestrian public right of way. Under the direction of the City Engineer City Crews were deployed to restore public right of way for pedestrian safety and create hazard free conditions. These unsafe conditions were throughout the 1400 block of Coolidge Avenue and consisted of demolished sidewalk, concrete debris, open excavations, and no safe pedestrian routes. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall reimburse the City for the labor, equipment and materials used to restore public right of way for pedestrian safety. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 4,212,486.25 53,547.56 Net change by previously authorized Change Orders Subtotal 4,266,033.81 Amount of this change order (5,670.71) New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 1.14% Submitted by: Approved by: n• ineer 10//iq Date /,/6/iy Date 4,260,363.10 Resident Engineer Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.: Un\l4: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 «-. CALIFORNIA - NATIONAL CITm IIDa„ INCORPORATUD COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 13, Attachment "A" DATE: April 10, 2014 WORK PERFORMED BY: City Maintenance Personnel DESCRIPTION OF WORK: Restoration of Public ROW and Restore Pedestrian Safety and create hazard free conditions ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Senior Equipment Operator Hour 6.00 38.33 229.98 2) (4) Equipment Operators Hour 24.00 34.35 824.40 3) Maintenance Worker Hour 6.00 28.37 170.22 4) Mechaninc Hour 2.00 39.40 78.80 5) NC Sr Civil Engineer Hour 1.50 135.00 202.50 6) NC Sr PW Inspector OT Hour 8.00 156.00 1,248.00 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ 2,753.90 $ 550.78 $ 3,304.68 MATERIALS Unit Qty Rate Total 1) 2) Decomposed Granite Asphalt Cold Mix Yards Tons 4.00 1.00 7.50 90.56 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 30.00 90.56 S 120.56 $ 18.08 $ 138.64 EQUIPMENT Unit Qty Rate Total 1) 580 Backhoe Hour 6.00 35.54 $ 213.24 2) 510 Case frontend loader Hour 6.00 51.47 $ 308.82 3) Ten Wheeler Hour 3.00 70.60 $ 211.80 4) Dump Truck Hour 6.00 55.37 $ 332.22 5) Bomag 120 Roller Hour 6.00 54.59 $ 327.54 6) 1 Ton Truck Hour 6.00 48.94 $ 293.64 7) 3/4 Ton Truck Hour 6.00 26.60 $ 159.60 8) Light Tower Hour 6.00 15.00 $ 90.00 Sub -Total Equipment: Equipment Markup (150/0): TOTAL EQUIPMENT: $ 1,936.86 $ 290.53 $ 2,227.39 Total Labor: Total Materials: Total Equipment: Total: 3,304.68 138.64 2,227.39 5,670.71 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 14 July 10, 2014 Reason/Purpose for this Change Order: Delete hydroseed from parkways between 18th Street and Civic Center Drive along Coolidge Avenue. Procure and install mulch for parkways located along Coolidge Avenue Improvements. Excludes areas in front of school along 18th Street. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall procure and install mulch inside the parkways along Coolidge Avenue improvements. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders Subtotal 47, 876.85 4,260,363.10 6,968.83 Amount of this change order New contract amount $ 4,267,331.94 Working days added: 0 Working days subtracted:Percent change in Contract to date 1.30% Submitted by: 1 1°12r6 IIN 10 t.( 14.m.1ZZ Resi ent Engineer � Da e Pi/ect Man r ate Approved by: , .. I1..%1./L...... 42%," ineer Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.: 1._. lame: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 14, Attachment "A" DATE: June 30, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Furnish and Install Decomposed Granite in Parkways ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer Hour 16.00 48.87 781.92 2) Laborer Hour 16.00 48.87 781.92 3) Laborer Hour 16.00 48.87 781.92 4) Operator Hour 16.00 65.78 1,052.48 Sub -Total Labor: $ 3,398.24 Labor Burden (12%): $ 407.79 Labor Markup (20%): $ 761.21 TOTAL LABOR: $ 4,567.23 MATERIALS Unit Qty Rate Total 1) 2) Mulch Hydro Seed Credit CY CY 35.00 1.00 32.00 (800.00) Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 1,120.00 (800.00) 320.00 $ 168.00 $ 488.00 EQUIPMENT Unit Qty Rate Total 1) Bobcat Hour 16.00 35.00 $ 560.00 2) Truck Hour 8.00 105.00 $ 840.00 3) Utility Truck Hour 8.00 33.00 $ 264.00 Sub -Total Equipment: $ 1,664.00 Equipment Markup (15Wo): $ 249.60 TOTAL EQUIPMENT: $ 1,913.60 Total Labor: $ 4,567.23 Total Material: $ 488.00 Total Equipment: $ 1,913.60 TOTAL: $ 6,968.83 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 15 July 21, 2014 Reason/Purpose for this Change Order: To make the new improvements match the existing improvements with ADA compliance an extra driveway had to be removed at 1410 Coolidge Avenue to correct an uneven surface. Under the direction of the Engineer the extra driveway was removed and disposed. The extra driveway placed was billed under line item 71, "concrete driveway (all types)." The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall remove the extra driveway at 1410 Coolidge Avenue to bring into ADA compliance. The agreed upon price for all costs associated with this work is a lump sum price of $552.00 as stated on this Change Order. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 54,845.69 4,267,331.94 552.00 $ 4,267,883.94 Percent change in Contract to date 1.32% Submitted by: Pro ct Manager 7 �� Re�sident Engineer [r� r to etL,�..�- . Approved by: ............ . City ngi eer . . 1..l.i..bY Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 16 July 21, 2014 Reason/Purpose for this Change Order: During the demolition of the Street section at Coolidge Avenue and Civic Center Drive petromat was found in the existing asphalt section. The dump fees for the ashpalt with petromat is more expensive than just the ashpalt alone. The ashpalt dump tickets are approximately $100, and the asphalt dump tickets with petromat are $285. Creating a difference of $185 per dump. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall dispose of the asphalt and petromat for a cost difference of $185 per dump. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 4,212,486.25 55,397.69 4,267,883.94 1,554.00 New contract amount $ Working days added: 0 Working days subtracted: ') Percent change in Contract to date 1.35% 4,269,437.94 Submitted by: WI Pr,, ect Mana 10 I ti(-/i----/ Date . 1 a esident Engineer ate Approved by: City t,. ..� .l(�4 Date City Manager, requlredfor Change Orders >s24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.. Name: ld��r7.! /r,%.. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 16, Attachment "A" DATE: lune 24, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Additional fees for Petromat dump ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Rate Total 1) Dump Fee EA 8.00 185.00 Sub -Total: Markup (5%): TOTAL: 1,480.00 $ 1,480.00 $ 74.00 $ 1,554.00 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 17 July 24, 2014 Reason/Purpose for this Change Order: Due to design changes of full section removal to grind and overlay on 5/21/14 the trench crossings on the East and West Side of Coolidge Avenue across Civic Center Drive had to be sawcut. The approximate section is 4" AC over 4" PCC for a total of 120 linear feet. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall sawcut trench crossings on the East and West side of Coolidge Avenue across Civic Center Drive. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 4,270,178.19 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 1.37% 56,951.69 4,269,437.94 740.25 Submitted by: 4)l / F, -rs r•'ct Manager, 1 ate .17_,T ---N Resi en Engineer 02-b 14- Date Approved by: Cit ngineer Date City Manager, required for Change orders >524,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.: /,/z Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 17, Attachment "A" DATE: May 8, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Install new striping and marking on 18th Street LABOR, MATERIALS AND EQUIPMENT Unit Qty Rate Total Sawcut trench crossing along East and West Side of Coolidge Ave across Civic Center Drive Intersection. LS 1.00 705.00 705.00 Ma kup (5%): $ 35.25 TOTAL COST: $ 740.25 Date: To: Attn: RE: M. Baker Concrete Cutting, Inc. BAKER'S CONCRETE CUTTING P.O. BOX 848 - SAN MARCOS, CA 92079 PHONE (760) 744-1679 FAX (760) 744-4389 STATE OF CALIFORNIA CONTRACTORS LICENSE # 636696 www.bakersconcretecutting.com S.W.B.E. CalTrans Certified Woman Business Enterprise #29943 Exp 3/2015 5/21/2014 PAL David Phone: 858.652.0328 dnuno@palsd.com PRICE FOR CHANGE ORDER NATIONAL CITY COOLIDGE X CIVIC CENTER Following is quote for work on above referenced (prevailing wage) project. I. FLAT SAW A. Approximately 120 If x 4" A/C over 4" C/C (8" total) thick Priced at hourly rate $145.00 per hour 580.00 (4 hour minimum) Move on $75.00 Removal of Slurry $50.00 TOTAL PRICE FOR ABOVE $705.00 Please note: Due to unforeseen job conditions, Baker's reserves the right to bill at an hourly rate. WATER/SLURRY CONTROL A. Baker's truck mounted vac -system with laborer supplied by General Contractor $ 0. B. Baker's truck mounted vac -system with laborer supplied by Baker's $ 110. C. Baker's truck mounted vac -system with laborer supplied by Baker's Prev. Wage $ 145. D. Travel to our disposal site within 25 mile radius $ 0. E. Travel to our disposal site outside 25 mile radius $ 75. F. Disposal of water/slurry 240 gal tank 1 to 4 hours on site = $ 50.00—over 4 to 8 G. Disposal @ your site (within 5 mile radius) $ 0 Mobilization Charge Flat Saw/Core Drill Rates Flat Saw Minimum Per Move On (for first 1 %: hours) Flat Saw Hourly Rate Flat Saw Premium Time Hourly Rate (Saturdays & Nights) 00 NO CHARGE 00 per hour 00 per hour 00 NO CHARGE 00 per hour hours on site = $100.00 .00 NO CHARGE $ 75.00 each Non -Prevailing Prevailing Wage Project Wage Project $ 180.00 $ 232.50 $ 120.00 $ 155.00 $ 180.00 $ 232.50 + Mobilization per hr per man per hour per man Mary/President laydeboss@aol.com Chuck/Estimating cgandy.bakers@yahoo.com Leslie/office bakers.leslie@gmail.com 5-21 Pal Coolidge Ch Order 5/21/20144:15 PM 1 Flat Saw Premium Time Hourly Rate (Sundays & Holidays) $ 240.00 Core Drill Minimum Per Move On (for first 1'''A hours) Core Drill Hourly Rate Core Drill Premium Time Hourly Rate (Saturdays & Nights) Core Drill Premium Time Hourly Rate (Sundays & Holidays) $ 217.50 $ 145.00 $ 217.50 $ 290.00 $310.00 per hour per man $ 270.00 $ 180.00 $ 270.00 $ 360.00 + Mobilization per hour per man per hour per man per hour per man Stand By Time will be charged at hourly rate (regular or prevailing wage depending on project) • If bonding is required add 3%. ❖ This quote is good for 30 days. • Insurance Certificates: Special wording endorsements upon our Insurance Company approval (Waiver of Subrogation, Primary Non -Contributory, Etc...) $300.00 or 5% of payroll whichever is greater. ❖ If Baker's is required to request State of CA DIR apprentices for any prevailing or non -prevailing wage project, Baker's will bill the General Contractor the hourly rates stated above if / when an apprentice is on site. EXCLUSIONS - All exclusions listed apply unless outlined or defined in above quote. LAY -OUT — RETENTION - REMOVAL OF VEGETATION - EXCAVATION/DIGGING OF DIRT — SURVEYING - SOILS COMPACTION — BACKFILL — SHORING — SCAFFOLDING - CORE DISPOSAL - MAN LIFTS - LOCATING OF STEEL INSTALLATION OF ANY FRENCH DRAINS - BOBCAT SKID MARKS - UNDERGROUND UTILITIES - REPAIRING FOR ANY UNFORESEEN UTILITIES — WATER - WATER METER - WATER AND SLURRY CONTROL - SLURRY CLEAN-UPDUST CONTROL - TRAFFIC CONTROL — BARRICADES - VENTILATION OF CONFINED WORK SPACE - HAZ-MAT - ENGINEERING - RAILROAD INSURANCE - PERMITS AND FEES - DAMAGE TO EXISTING CONCRETE - SPECIAL PERMITS OR EMPLOYEE BADGES FOR ACCESS ON TO ANY GOVERNMENT AREAS/BASES THERE WILL BE AN EXTRA CHARGE IF CUTTING/SPLITTING OF UNFORESEEN STEEL IS ENCOUNTERED DURING THE COURSE OF OUR WORK. THERE WILL BE AN EXTRA CHARGE FOR REMOVAL OF ASPHALT WITH PETROMAT FABRIC/PAPER. If I can be of any further assistance please call me at: (760) 744-1679. Thank you, BAKER'S CONCRETE��CUTTING Marc Reiner Mary Baker President Quote accepted, signed, and dated: X Print Name: Date: Thank you for allowing us to supply you with a quote for this work. Mary/President laydeboss@aol.com Chuck/Estimating cgandy.bakers@yahoo.com Leslie/Office hakers.leslie@gmail.com 5-21 Pal Coolidge Ch Order 5/21/20144:15 PM 2 "'CALIFORNIA -+ NATIONAL OTT L aVol! rcoaPOa&?sD COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. Reason/Purpose for this Change Order: Procure and install additional 3" gate valves for the irrigation system at Coolidge Ave per revised irrigation plans from Kimley-Horn dated 4.3.14. CHANGE ORDER NO. 18 July 24, 2014 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall procure and install additional gate valves for the irrigation system at Coolidge Ave per revised irrigation plans from Kimley-horn dated 4.3.14. The agreed upon price for all costs associated with this work is as stated on this Change Order. The work was conducted on three seperate days, 4/15/14, 4/16/14 and 6/25/14. See Attachment "A-C" for cost breakdowns. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders 57,691.94 Subtotal Amount of this change order New contract amount Working days added: 0 Submitted by: Approved by: gineer Working days subtracted: 0 4,270,178.19 8,779.73 $ 4,278,957.92 Percent change in Contract to date 1.58% Resident Engineer Date Date City Manager, required for Change Orders>S24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by PAL General Engineering, Inc.: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 + CALIFORNIA - NATIONAL CITE �[O l +ticonronsaB>• COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 18, Attachment "A" DATE: April 15, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Installation of gate valves ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 8.00 45.01 360.08 2) Laborer Hour 8.00 45.01 360.08 Sub -Total Labor: $ 720.16 Labor Burden (12%): $ 86.42 Labor Markup (20%): $ 161.32 TOTAL LABOR: $ 967.90 MATERIALS Unit Qty Rate Total 1) 3" Nibco T-113 Cross Handle Gate Valve EA 4.00 422.85 1,691.40 2) 10"round Carson Valve Box EA 4.00 15.22 60.88 3) Commone Bricks (Valve Box Support) EA 8.00 0.50 4.00 4) 3/4" Crushed Gravel Bags EA 4.00 4.04 16.16 5) 3"x12" SCH 80 pipe nipple EA 4.00 6.13 24.52 6) 3" sch 40 90 degree elbows EA 8.00 5.61 44.88 Sub -Total Materials: $ 1,841.84 Materials Markup (15%): $ 276.28 TOTAL MATERIALS: $ 2,118.12 EQUIPMENT Unit Qty Rate Total 1) B.3 Truck Hour 4.00 27.03 $ 108.12 2) 0.3 Hour 2.00 65.50 $ 131.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 239.12 $ 35.87 $ 274.99 Total Labor: $ 967.90 Total Material: $ 2,118.12 Total Equipment: $ 274.99 TOTAL: $ 3,361.00 CALIFORNIA.-+ NATIONaavAL cry li COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 18, Attachment "B" DATE: April 16, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Installation of gate valves ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 8.00 45.01 360.08 2) Laborer Hour 8.00 45.01 360.08 Sub -Total Labor: $ 720.16 Labor Burden (12%): $ 86.42 Labor Markup (20%): $ 161.32 TOTAL LABOR: $ 967.90 MATERIALS Unit Qty Rate Total 1) 3" Nibco T-113 Cross Handle Gate Valve EA 3.00 422.85 1,268.55 2) 10" round Carson Valve Box EA 4.00 15.22 60.88 3) Commone Bricks (Valve Box Support) EA 8.00 0.50 4.00 4) 3/4" Crushed Gravel Bags EA 4.00 4.04 16.16 5) 3"x12" SCH 80 pipe nipple EA 3.00 6.13 18.39 6) 3" sch 40 90 degree elbows EA 6.00 5.61 33.66 7) 2" Nibco T-113 Cross Handle Gate Valve EA 1.00 97.98 97.98 8) 2" x 12" Sch 80 Pipe Nipple EA 1.00 2.29 2.29 9) 2" SCH 40 90 Degree Elbow EA 2.00 4.50 9.00 10) 2 SCH 80 Couplings EA 2.00 4.50 9.00 Sub -Total Materials: $ 1,519.91 Materials Markup (15°/0): $ 227.99 TOTAL MATERIALS: $ 1,747.90 EQUIPMENT Unit QtY Rate Total 1) B.3 Truck Hour 4.00 27.03 $ 108.12 2) 0.3 Hour 2.00 65.50 $ 131.00 Sub -Total Equipment: Equipment Markup (15./0): TOTAL EQUIPMENT: Total Labor: Total Material: Total Equipment: TOTAL: $ 239.12 $ 35.87 $ 274.99 967.90 1,747.90 274.99 2,990.78 +►. CALIFORNIA.-+ NATIONAL Clint `-`RCORIOAA'r89-� COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 18, Attachment "C" DATE: June 25, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Installation of gate valves ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 4.00 45.01 180.04 2) Laborer Hour 4.00 45.01 180.04 3) Laborer Hour 4.00 45.01 180.04 Sub -Total Labor: $ 540.12 Labor Burden (12%): $ 64.81 Labor Markup (200/o): $ 120.99 TOTAL LABOR: $ 725.92 MATERIALS Unit Qty Rate Total 1) 3" Nibco T-113 Cross Handle Gate Valve EA 2.00 422.85 845.70 2) 10" round Carson Valve Box EA 2.00 15.22 30.44 3) Commone Bricks (Valve Box Support) EA 4.00 0.50 2.00 4) 3/4" Crushed Gravel Bags EA 2.00 4.04 8.08 5) 3"x12" SCH 80 pipe nipple EA 2.00 6.13 12.26 6) 3" sch 40 90 degree elbows EA 8.00 5.61 44.88 7) Glue/Teflon Charge for previous tickets EA 1.00 65.00 65.00 Sub -Total Materials: $ 1,008.36 Materials Markup (15%): $ 151.25 TOTAL MATERIALS: $ 1,159.61 EQUIPMENT 1) 18.3 Truck Unit Hour Qty 4.00 Rate 27.03 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Total $ 108.12 108.12 16.22 $ 124.34 Total Labor: $ 725.92 Total Material: $ 1,159.61 Total Equipment: $ 124.34 TOTAL: $ 2,009.87 CALIFonnIA - - W. ITIONAL airy +xcoaeoswssv J COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. CHANGE ORDER NO. 19 July 29, 2014 Reason/Purpose for this Change Order: The service meter pedestal at the Southwest corner of Coolidge Ave and Plaza boulevard had to be relocated out of the Caltrans right of way. This was discovered after the service meter pedestal was already installed. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall relocate the sevice meter pedestal out of the Caltrans right of way to the new location. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: Approved by: Date Cit Manager, required for Change Orders>$24,999 Date 66,471.67 4,278,957.92 3,794.10 Percent change in Contract to date 1.67% 4,282,752.02 Resident Engineer Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide at of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. AcA e fed and agreed to by PAL General Engineering, Inc.: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 *^. CALIFORNIA ^+ NATIONAL Myr , a;i i COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 IRCORPORATSP CHANGE ORDER NO. 19, Attachment "A" DATE: July 29, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Relocation of Service Pedestal at Plaza and Coolidge ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Tech 1 Hour 16.00 37.29 596.64 2) Tech 2 Hour 16.00 27.93 446.88 3) Operator Hour 4.00 63.78 255.12 Sub -Total Labor: $ 1,298.64 Labor Burden (12%): $ 155.84 Labor Markup (20%): $ 290.90 TOTAL LABOR: $ 1,745.37 EQUIPMENT Unit Qty Rate Total 1) Chevy Silverado Hour 16.00 35.00 $ 560.00 1) Chevy PU Hour 16.00 30.70 $ 491.20 2) Bobcat with Backhoe ATT Hour 4.00 57.98 $ 231.92 3) 185 CFM Compressor Hour 16.00 21.33 $ 341.28 Sub -Total Equipment: $ 1,624.40 Equipment Markup (15%): $ 243.66 TOTAL EQUIPMENT: $ 1,868.06 Total Labor: $ 1,745.37 Total Equipment: $ 1,868.06 TOTAL: $ 3,613.43 -4- CALIFORNIA —� NATIONAL CUT fla34 ACORPORATTD J COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. Reason/Purpose for this Change Order: The City Engineer directed the installation of loading zone signs infront of Kimball Elementary and replacing a post for a Flashing Speed Limit Sign along 18th Street between Harding and Coolidge Avenue. CHANGE ORDER NO. 20 September 15, 2014 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall install loading zone signs infront of Kimball Elementary and replacing a post for a Flashing Speed Limit Sign along 18th Street between Harding and Coolidge Avenue. The agreed upon lump sum price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders 70,265.77 Subtotal Amount of this change order New contract amount $ 4,282,752.02 866.25 Working days added: 0 Working days subtracted 0) Percent change in Contract to date 1.69% Resident Ertg neeY 0..)1 4,283,618.27 Date Date CityManager, required for Change Orders ,$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to py PAL General Engineering, Inc.: ame: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 — CALIFORNIA -« NATIONAL CITY aatv COMMUNITY CORRIDORS IMPROVEMENTS PROJECT CHANGE ORDER NO. 20, Attachment "A" Specification #12-05 DATE: September 15, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Install new loading zone signs and replace post of Flashing Speed Limit Sign LABOR, MATERIALS AND EQUIPMENT Unit Qty Rate Total Install new loading zone signs and replace flashing speed limit sign post. LS 1.00 825.00 Markup (5%): TOTAL COST: 825.00 $ 41.25 $ 866.25 Statewide Stripes, Inc. P.O. Box 600710 San Diego, CA 92160-0710 858.560.6887 858.560.0158 fax Tax ID #33-0915254 SLBE #10SS0008 DBE #32232 MB/SB #40421 PAL General Engineering, Inc. 5374 Eastgate Mall San Diego, rA 92121 858.638.7100 F-638.7102 SWS NO. 1455 P.O. NO. CA nc. #788286 Since 1990 TERMS Net30 INVOICE DATE I. 6/25/2014 INVOICE No. L11687 JOB ADDRESS PAI 10135.3 Community Corridor Improvement Project DUE DATE 7/25/2014 PROJECT Additional Temp Wo... QTY RATE AMOUNT DESCRIPTION 3 i Loading Zone signs at Kimball School 3/14/2014 Replace Post for Flashing Speed limit sign 3/14/2014 225.0o 150.00 675.0o 150.00 2 3 8' "YIELD" Stencil Temporary in Paint 3/3/2014 169th and Coolidge Continental Crosswalks Fourth and Drexel area on 5/5/2014 SUBTOTAL: RETENTION 5% WITHHELD: We Appreciate Your Business Amounts 30 days past due will accrue interest at 10% per annum. 175.00 250.00 -5.00% 350.00 750.00 1,925.00 -96.25 TOTAL $1,828.75 Payments / Credits $0.00 $1,828.75 CALIFORNIA -« NATI0NAL CITY •KCORPOHArD COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 Contractor: PAL General Engineering, Inc. Reason/Purpose for this Change Order: The City Engineer directed that the following intersections along Coolidge Avenue be changed from yield signs to stop signs: 11th Street, 12th Street, 14th Street, 15th Street, 16th Street and 17th Street. The work consisted of removing the old yield signs and legends and replacing with new stop signs, stop bars and stop legends. CHANGE ORDER NO. 21 September 25, 2014 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall remove the old yield signs and legends and replace with new stop signs, stop bars and stop legends at the above locations. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 4,212,486.25 Net change by previously authorized Change Orders Subtotal Amount of this change order 71,132.02 4,283,618.27 6,762.00 New contract amount $ Working days added: 0 Working days subtracted: Percent change in Contract to date 1.85% Submitted by: 1vfl' Date Approved by: City/` ngineer Date 4,290,380.27 Resident Engineer 'bate CitManager,required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor wit provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. At of the terms and conditions of the original contract documents are incorporated herein. Acce.ted and a. reed to by PAL General Engineering. Inc.: Name: /69/Z 7-// Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 — CALIFORNIA r« NATIONAL CITit ,a 3- W WCOgPOAATffi= COMMUNITY CORRIDORS IMPROVEMENTS PROJECT Specification #12-05 CHANGE ORDER NO. 21, Attachment "A" DATE: September 25, 2014 WORK PERFORMED BY: PAL General Engineering, Inc. DESCRIPTION OF WORK: Replace old yield signs and legends with new stop signs, stop bars and stop legends. LABOR, MATERIALS AND EQUIPMENT Unit Qty Rate Total Remove Yield Legends EA 10.00 125.00 1,250.00 Install Thermoplastic Stop Legends EA 6.00 175.00 1,050.00 Thermoplastic Limit Line LF 240.00 3.50 840.00 Stop Sign on New Post EA 2.00 300.00 600.00 Stop Sign on Existing Post EA 12.00 225.00 2,700.00 Sub -Total: $ 6,440.00 Markup (5%): $ 322.00 TOTAL COST: $ 6,762.00 Statewide Stripes, Inc. P.O. Box 600710 San Diego, CA 92160-0710 ««« « « «« «««0 «««K (0)»» )> )) )>»» ))»»»» » »» 858.560.6887 858.560.0158 fax Tax ID #33-0915254 Class: C32 MB/SB# 40421 DBE# 32232 ESTIMATE DATE NO. 7/21/2014 13328 FFO / AA FMPLOYFR CA uc. *78828e Sep: 12/31 Since 1990 /2014 Customer Info - PAL General Engineering, Inc. 5374 Eastgate Mall San Diego, CA 92121 858.638.7100 F-638.7102 PROJECT REP SWS NO. Coolidge Stop signs 7/21/14 BB QTY DESCRIPTION COST TOTAL 10 6 240 2 12 Remove Yield Thermoplastic "STOP" Stencil Ln. Ft. 12" Thermoplastic Crosswalk/ Limit Line Stop Sign Supplied and Installed on new post Stop Sign Supplied and Installed on Existing Post Includes: Items listed per RFC, Prevailing Wages and one move Excludes: Preformed Thermoplastic 125.00 175.00 3.50 300.00 225.00 1,250.00 1,050.00 840.00 600.00 2,700.00 TOTAL $6,440.00 EXCLUDES: Waiver of Subrogation on Worker's Comp per party/policy @ $ 1 5 0 . 0 0 ea., Additional Insured Endorsements on Auto Liability @ $75.00 ea., mast ann signs, electrical or FLASHING BEACON SIGNS, bonds, notary, night work, prevailing wages (unless included above). Not responsible for A.D.A. compliance. Items not specifically included are excluded and require an additional bid. STATEWIDE STRIPES INC. REQUIRES TWO WEEKS WRITTEN NOTICE PRIOR TO SCHEDULING. Acceptance of Estimate and Agreement The undersigned hereby contracts for the services noted above and agrees to pay for the services upon completion and receipt of an invoice. The undersigned agrees to pay reasonable attorneys' fees and costs if incurred in the enforcement of this contract. Co. Name: Date: By: Signature: (Print Name and Title) nn4i(�wim�igVA���, CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk PAL GENERAL ENGINEERING Change Order #13, #14, #15, #16, #17, #18, #19, #20 and #21 Community Corridors Improvements Project Judy Hernandez (Engineering / Public Works) Forwarded Copy of Change Orders to PAL General Engineering