Loading...
HomeMy WebLinkAbout2015 CON Fordyce Construction - Morgan Tower and City Hall Remodel Project - Change Order #3+0— CALIFORNIA TIONAL Cil'Ii /l�_ 1NCORPORATSD ���..//1 MORGAN TOWER REPAIRS AND CITY HALL REMODEL CIP No. 14-04 Contractor: FORDYCE Construction Inc. CHANGE ORDER NO.3 February 23, 2015 Reason/Purpose for this Change Order: During the initial site visit for the installation of the HVAC unit at Morgan Towers, Kyle Crandall of Fordyce Construction discovered that there are C-Channels located at the site of installation which were not included and shown in the plans. These C-Channels will need to be removed in order for the HVAC units to be installed per engineer's design and direction. Additionally, the HVAC unit will need to be modified to a down shot return in order for the roof to be properly sealed. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall remove the existing C-Channels located at the site of HVAC installation, convert the HVAC unit to a downshot configuration, modify the ducting to fit the curb design, and patch the roof per the design engineer's direction (noted per RFI 07 response). Attachement "A" provides a breakdown of all costs included in this work. Due to the nature of resolving this issue, an additional 5 days will be added to the orginal contract days. The agreed upon price for all costs associated with this work is $5,349.60. Original Contract Amount $ 128,200.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 5 Working days subtracted: 0 5,776.37 133,976.37 5,349.60 Percent change in Contract to date 8.68% 139,325.97 Sub .tted : • �--� I 2.24. 2D15' Date ProjMana ,r er v Approved by: _.............. Cit Engineer ZI27/IS Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted - ' d agreed to Construction, Inc.: ote to Contractor: If you d not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed un r protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, ontractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 CALIFORNIA .-‹- NATIONALi CI 'v INCORPORATED MORGAN TOWER REPAIRS AND CITY HALL REMODEL CIP No. 14-04 Contractor: FORDYCE Construction Inc. CHANGE ORDER NO.3 February 23, 2015 Attachment "A" dditional Costs for Changes Unit Quantity Rate Extension 1 Set-up dust control HR 2 48.13 96.26 2 Removal of t-bar HR 0.5 48.13 24.07 3 Removal of monokote HR 2 48.13 96.26 4 Cutting of C-Channel HR 1 48.13 48.13 5 Repair of t-bar HR 1 48.13 48.13 Removal of the existing 6 HVAC platform HR 2 48.13 96.26 7 Disposal HR 2 48.13 96.26 8 Additional Roof Patching HR 1 48.13 48.13 9 Monokote application HR 4 48.13 192.52 Demo/install new 10 plenum/rerouting of ducts HR 24 42.15 1,011.60 Subtotal 1,757.62 Labor Burden 603.21 20% Mark -Up 472.17 TOTAL 2,833.00 MATERIALS 1 Monokote Fire Protection LS 1 150.00 150.00 2 Roofing Material LS 1 50.00 50.00 3 Taxes LS 200.00 0.0875 17.50 4 Return Supply Sheet Metal LS 1 760.00 760.00 5 Insulation LS 1 220.00 220.00 6 Spiral Duct LS 1 467.00 467.00 7 Taxes LS 1,447 0.0800 115.76 Subtotal 1,780.26 15% Mark-up 267.04 TOTAL 2,047.30 CALIFORNIA NA r $)NAL CIr INCORPORATED • EQUIPMENT 1 Genie Lift LS 1 125.00 125.00 2 Cutting Torch LS 1 50.00 50.00 3 Taxes LS 175.00 0.0875 15.31 Subtotal 190.31 15% Mark-up 28.55 TOTAL 218.86 SUMMARY OF ALL COSTS 1 LABOR + MATERIALS + EQUIPMENT LS 1 5,099.15 5,099.15 2 Subcontractor Mark-up (5%) LS 1 171.39 171.39 3 Bonding LS 1 79.06 79.06 GRAND TOTAL 5,349.60 CONSTRUCTION CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 COST ESTIMATE SUMMARY SHEET for EXTRA WORK Project: Morgan Tower Repairs and City Hall Remodeling Description of Work: 07 Revise HVAC Installation per RFI 06. Contractor: Fordyce Construction COR #: Spec No: 14-04 Date: 2/19/2015 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $1,671.44 2 Sub -Contractor (Includes Prime Contractor Mark Up) $3,599.10 Subtotal: $5,270.54 1.5% BOND: $79.06 GRAND TOTAL : $5,349.60 ORDYCE CONSTRUCTION Date: January 28, 2015 RFI #: 06 9932 Prospect Ave. #138, Santee, CA 92071, Phone (619) 449-4272, Fax (619) 449-1930, License # 608529 From: Amy Crandall Proj. # 14-04 To: Vinnie Aguelo Project: Morgan Tower Disciplines Impacted: ['Structural ['Mechanical DElectrical ®Architectural ['Civil ❑Landscape ❑Kitchen ['Other Reference: Drawing(s) Spec Section(s) Other Please clarify or provide the following information: The plans indicate a side shot HVAC unit, the existing HVAC unit is a down shot. During our investigation we noticed there are structural C channels in the area of the new work. Please provide a design that meets the existing conditions. Possible Cost Impact Possible Time Impact ® Increase ® Increase ❑ Decrease D Decrease ❑ No Change ❑ No Change ❑ Unknown ❑ Unknown This information is required as soon as possible, but no later than January 30, 2015 ® PRIORITY ATTENTION REQUIRED Contractors Representative: Copies to: Architects Response: Date: —'The existing C channel supports should be removed. Existing supports were designed for the weight of the existing HVAC. Install supports as specified, as it is designed for the weight and seismic support for the new HVAC unit. Modify/repair/patch roof as required to install new HVAC roof curb. HVAC unit can be installed for down shot air distribution. Provide air filter rack as required per manufacturer's instruction. RG 2-12-15 Copies to: Owner Representative CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk FORDYCE CONSTRUCTION Change Order #3 Morgan Tower Repairs & City Hall Remodel Judy Hernandez (Engineering) Forwarded Copy of Change Order to Fordyce Construction