Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2015 CON LB Civil Construction - "A" Avenue Green Street Improvements SP 14-05 - Change Orders #21
CALIFORNIA -» NivritoNAL 1 1 INCORPORATED A Avenue Green Street Improvements CIP No. 14-05 Contractor: L.B. Civil Construction CHANGE ORDER NO. 21 September 29, 2015 Reason/Purpose for this Change Order: Slurry the portion of paving between 14th/National City Blvd. to 12th on A Ave. for preventative maintenance. The City of National City and Contractor agree to the following change to the original Contract: The city has directed the contractor to provide a Type li slurry seal to approximately 33,000 sf of roadway on A Ave. between National City Blvd./14th to 12th St. This work will include all necessary "No Parking" posting, cleaning and preparation and coordination. All striping by the contractor will remain per plans, existing striping will be removed on a T&M basis and striping not shown on the plans will be replaced by city forces. The slurry shall be applied by October 9, 2015 and includes one mobilzation. Original Contract Amount $ 2,841,105.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 10 Working days subtracted: 0 225,958.88 3,067,063.88 14,686.82 $ 3,081,750.70 Percent change in Contract to date 8.47% Sub ittd by: Proje Manager Date City Project Manager Date Aipro ed by: ,l . Ci ngineer ..1 d .(.7:.(../.,.f Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (Contractor's name): (5 5. ! ............. Name: Date Note to eontractorrr yin /TO not agree wim mis i nange urger you may be alrecteato"proceea wltn mis wont under me -terms of me - contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager goikv 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 PURCHASE ORDER: WORK PERFORMED BY DESCRIPTION OF WORK CITY OF NATIONAL CITY COST PROPOSAL - A AVENUE GREEN STREET IMPROVEMENTS DATE PERFORMED TBD DATE OF REPORT 28-Sep-15 PCO NO G Scott Asphalt 53 REPORT NO Slurry seal A Ave from National City Blvd to 12th Street, associated traffic control. EQUIP NO EQUIPMENT HOURS HOURLY RATES EXTENDED AMOUNTS 236 Skidsteer 0 $ 28.83 $ Water Truck 0 $ 56.80 $ - F250 Truck 16 $ 27.33 $ 437.28 303 Excavator 0 $ 27.15 $ - CB224 Roller 0 $ 39.06 $ - 938 Loader 0 $ 47.14 $ - $ 437.28 APPROVED WORK DONE BY SPECIALISTS DESCRIPTION NO. UNIT UNIT COST G Scott Asphalt 1 $10,998.00 $ 10,998.00 TOTAL COST OF EQUIPMENT, MATERIALS AND WORK $ 10,998.00' CONTRACTOR'S REPRESENTATIVE RESIDENT ENGINEER LABOR HOURS HOURLY RATES EXTENDED AMOUNTS Carpenter Laborer OT 67.82 $ REG OT 0 48.87 55.82 $ REG 16 47.16 $ 754.56 Operator Carpenter Foreman OT 0 $ 79.49 $ REG OT 0 $ 65.78 $ 69.52 REG 0 $ 50.00 Operator Apprentice Operator Foreman Laborer Apprentice OT 53.89 REG OT 0 53.12 80.99 $ REG OT 16 66.78 32.24 $ 1,068.48 REG 0 21.59 1823.04 Payroll Burden 13.85% $252.49 *HOURLY RATES - PER SECTION 3-3.2.2 TOTAL LABOR A $2,075.53 • B $ 10,998.00 TOTAL EQUIPMENT & MATERIALS C $ 437.28 20 % MARKUP ON LABOR COST 15 % MARKUP ON EQUIPMENT, MATERIAL AND WORK COST 5 % MARKUP ON SUBCONTRACTED WORK 1 % BOND AND LIABLILITY INSURANCE (A) (B) (C) SUBTOTAL (D) TOTAL $ 65.59 $ 549.90 $ 14,541 41 $ 145.41 $ 14,686.82 G. SCOTT ASPHALT, INC. QUOTATION TOL B Civil Construction C'O Geoff Boline 11585 Sorrento Valley Rd Ste 10410 San Diego CA 92121 358 TROUSDALE DRIVE CHULA VISTA, CA 91910-1045 (619) 420-1854 FAX (619)420-1859 Lic.# 751836 C12 CERTIFIED SMALL BUSINESS & DVBE Ph ilil,5X-481-5222 FAN r2858-181-50Iii 23898 908001 DATE — — We propose to furnish all labor material and egoipment necessary to perform the following items of work, subject to terms and conditions stated This quotation expires 30 days from the date above P 0 NO REP LOCATION like Ik \ enue. DESCRIPTION COST PREVAILING WAGE APPLIES I. Clean and lay on one coat of Type II RPMS on approx 32.924 SF. Roll with rubber tire roller upon completion. ONE MOVE (The seal will not adhere to gas or oil. also power steering turns will tear the seal) **TWO MOVES- SI3548.00** EXCLUDES: Traffic Control. Crack Fill, Weed Kill, Striping, Testing, Removal of Pavement Markings. AC Repairs. Temporary Tabs. Night:Weekend:I loliday Work. Bonding and everything else not specified on bid *NOTE: THIS IS QUOTED WITH CURRENT ASPHALT PRICES.* SUPPLIER MAY CHANGE ASPHALT PRICES WITHOUT NOTICE.- - NOTE: PLEASE REVIEW ENCLOSED LIABILITY INSURANCE LIMITS.** -*ADDITIONAL CHARGES MAY APPLY.** CONDITIONS: Does not include permits, bond, or any form of engineering .stai.Ifig lesting, inspection etc i unless oterwise specified 2 Not responsible for subgrade compaction done by anyone but ourselves n trenches, holes and fill areas Recommendations for repair, overlays. sealing etc. are based on past experience and visual observation Our opinions in no way should be considered as a formal engineenng evaivatton 4 i'v,} unusual conthbons or subsotl oroblams, buned slabs underground piping. trash deposits high moisture content, etc deemed cause for additional charges I 0.9980 5 area .•.e ;.roper Lase and repave to o,;' specifications w,,. DE gUara7lee::! ' except where atrorrnal abuse is the cause for faiiure as a nror,cen Nale! ,irE Our guara,Izee to The patch itself and excludes the area around the pato", ASPHALT OVERLAYS, though often substantial cannot be gJaranteed as underlying conditions of the original instailamn are '7' 'etely locrwr 6 Monthly progres, • '7$ upon competron Accounts are deiinqueni after 30 days and they are s. o the maximum finance charge allowed by law (Any attorney tees attenoar uollecticri to be paid in fui y acceptor! 7 The undersigned personaily guarantees the obtgatar relating to this proposal 8 Required California Preliminary Lien ;nforrna:ion to De provided Acceptance: Please sign and return yellow copy - this quotation constitutes the sole and only agreement. Any prior agreements, negotiations etc. not set forth herein are of no force or effect Firrh By Date Date 91/2/?' S 7f 1 d S I J SURVEYOR: SAMPO 5 A y� O 4,6 Qad �`g Y� 4607, 1 z a 5 RICE FRS ALZA O W w < CO WI R/W O A AVENUE BASEBALL FIELD LIBRARY PAY IP, NATIONAL CITY BOULEVARD KIMBALL PAR LINE A A AVENUE CONSTRUCTION 1 ------a W to �.�JW U 2 J 4] b EAST 9TH STRE v�\ PAVING NOTES FAST E INSTALL TYPICAL PAVEMENT SECTION - 4' AC OVER l' O CUSS Y BAY OVER R536O MAIM EEOTEXRL£ FABRIC SPECFICAn�ONSECUAL OVER PPEPAPEO SUBCRME PER A AVENUE - NATIONAL CITY BOULEVARD TO EAST 81H STREET INSTALL TYPICAL PAVEMENT SECS. - 5 AC 0,ER B' O OCLAP APFROEDSS II BASE OVEN R536Oi MAIM QOTCXRLE FABRIC EWAL OVER PMd`AAED SUBORADE PER SPECIFICATIONS. FAR PI ATA BOULEVARD INIFRSECTION INSTALL TYPICAL PAVEMENT SECT. - 5. AC OVER 11' O CLASS 11 BASE OVER R5380i NNW N£O1EXRLE FABRIC OR APPROVED EGUAL OVER PREPARED SIJOGRA0E PER SPECIFICATKNS O 15' ASPHALT GRIND AND OVERLAY PENNE., PAWN' ® PERMEABLE PAVEAR R PER PERMEABLE PAVER DET. A CN SHEET 08. ANOFWNK PAMNC O 4' CONCPEIE TYRE A PER OETAX F W SHEET 68 O 4' COLORED CONCRETE TYPE B PER DETAIL F ON SHEET 88 © 4' COLORED CONCRETE TYPE C PER DETAIL F ON SHEET 68 OD SHEET COLORED CONCRETE TYPE D PER DETAIL F ON b OE 4' CONCRETE TtPE E PER DETAIL F ON SHEET 68 © ' CONCRETE TYPE F PER DETAIL F ON SHEET 68 Q 7.5. CONCRETE TYPE A PER DETAIL F ON SHEET b NoIF. 1. CONCRETE TYPES AS SPECIFIED ON UNBAR DESIGN SHEET 68 AND PER SPECIFICATIONS. 2. SIDEWALKS NAT ARE ADJACENT TO CURB SHALL BE DOWELED INTO ADJACENT CURB AND RONFORCEO VAIN /3 RERAN SPACED AT 24" ON CENTER. BORING LOCATIONS BOBHG NO ENSRNc 4.5' ASPHALT CONCRETE OVER l.5' AGGREGATE BASE 2.5' ASPHALT CONCRETE OVER S. CONCRETE MENSAL ON CONCRETE GRAPHIC SCALE IN FEET IGmky*Horn ABA 500. San 4I11NAI092101 Plow. 010.2...11 mAEx.rnon.wm NATIONAL CENT J 7+1I A AABBE 05 iffT PAVNCN RAN A AVENUE CITY OF NATIONAL 0)7 RCE FlaIIHNE OE MIK WOWS Ora PAON.T M. 0%81100 SPIZEI.MONKN B¢T=NPR 11175 D • lOtyl, (11,,, CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk L. B. CIVIL CONSTRUCTION Change Order #21 "A" Avenue Green Street Improvements Tirza Gonzales (Engineering) Forwarded Copy of Change Order to L. B. Civil Construction