Loading...
HomeMy WebLinkAbout2015 CON New Century Construction - "D" Ave and E 12th St Roundabout SP 15-02 - Change Order #5+►�.CALIFORNIA NATIONALcfry � ate` INCORPORATtoD D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. CHANGE ORDER NO. 5 October 28, 2015 Reason/Purpose for this Change Order: The original war memorial design did not account for refurbishing existing flag poles and large offsets and fabricating new small offsets. With redoing the entire memorial wall the City did not want to place old products onto a new wall. The limits of the tile were also extended to the walls adjacent to the war memorial. The Contractor shall proceed with refurbishing (3) flag poles and (3) large offsets, fabricate (12) small offsets and extend the limits of the tile to the wall adjacent of the war memorial. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the above mentioned work. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 18,107.34 1,513,996.34 20,448.75 Percent change in Contract to date 2.58% 1,534,445.09 Submitted by: /; •Proect Ma 10/emirs er Date Approved by: ity Engin er 112 a City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Not Century Construction, Inc.: ZF Name: f Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 CALIFORNIA NATIONAL C.137 �ye o t/ INC,ORpORATE]) D AVENUE AND E 12TH STREET ROUND -A -BOUT CHANGE ORDER NO. 5 Specification #15-02 DATE: August 7, 2015 WORK PERFORMED BY: Restoration Artechs DESCRIPTION OF WORK: Refurbish large offsets and flag poles, fabricate small offsets extend limits of tile to adjacent walls ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LUMP SUM Unit Qty Rate Total 1) 2) 3) 4) Refurbish (3) large offsets Refurbish (3) Flag Poles Fabricate (12) small offsets Extend limits of tile to walls adjacent to war memorial LS LS LS LS 1.00 1.00 1.00 1.00 1,500.00 5,775.00 7,620.00 4,580.00 1,500.00 5,775.00 7,620.00 4,580.00 $ 19,475.00 Sub -Total: Prime Contractor Markup (5%): GRAND TOTAL: $ 973.75 $ 20,448.75 PROJECT PROFESSIONALS CORPORATION TRANSMITTAL COVER To: City of National City Project Name: D Avenue and E 12' Street Roundabout Improvements Spec No 15-02 ITEMS DELIVERED: Change Order #5. Delivered by:941-1Project Professionals Corporation Received by: Date: 1vMdc CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk NEW CENTURY CONSTRUCTION Change Order #5 "D" Avenue & East 12th Street Roundabout Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Order to New Century Construction