HomeMy WebLinkAbout2016 CON Western Rim Constructors - Parks Improvements Project - Change Orders #1 through #6CALIFORNIA
NATIONAL CITY
ire n/
INCORPORATED
Kimball, El Toyon and Kimball Skate Park Improvements
CIP No: 15-04
Contractor: Westem Rim Constructors, Inc.
Reason/Purpose for this Change Order.
The city has directed the contractor to remove a Tight fixture at Las Palmas Park pool damaged during high
winds and replace it to match the existing Skate Park Lighting.
CHANGE ORDER NO. 1R
February 15, 2016
The City of National City and Contractor agree to the following change to the original Contract:
The contractor shall remove the existing Tight foundation as necessary to place a locking pull box directly over
the existing footing and wires, place a new foundation and new conduit outside the existing fence adjacent to
the original foundation, and place new light fixture the same as those located in the Kimball Skate park to
provide a complete light at the Las Palmas location. This work shall include all labor, materials and equipment
necessary to complete the work described above for a lump sum price agreed. In an effort to expedite this
repair a fixture was used from the Kimball Skate Park project and a replacement fixture has been ordered.
'This may create a delay in completion of the lighting at the skate park.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders
Subtotal 3,452,342.98
Amount of this change order 11,334.75
New contract amount $ 3,463,677.73
Working days added: 0
Submjttad by:
rojecManage
Approved by:
Working.,days subtracted: 0 Percent change in Contract to date 0.33%
0349
City Project Manage._.) Date
Date City Manager, required for Change Orders >$24.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract dr,uments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted h j
to by (Contractor's name):
ski
Name:
Datei.i).(0
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
WESTERN RIM CONSTRUCTORS, INC.
912 S. Andreasen Drive, Suite 108, Escondido, CA. 92029
Phone: 760-489-4328 Fax: 760-489-4304
REQUEST FOR CONTRACT CHANGE ORDER
DATE: 1/7/2016
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
CIP NO: 15-04
WRC PCO NO: 009
WRC JOB NO:
202
Description of Change Order Request:
Replace Tight fixture at Las Palmas Park swimming pool as directed by National City.
Item
1 Ace Electric
2
3
4
Description
Sub Total
Mark Up
Total this Request
Quantity Unit Unit Price Total Price
1 LS $ 10,795.00 $ 10,795.00
$
$ 10,795.00
$ 539.75
$ 11,334.75
By:
Title:
Date:
Western Rim Costructors, Inc. City of National City
Mike Domanski
Project Superintendent
1/7/2016
By:
Title:
Date:
CALIFORNIA -
NATIONAL CITY
r 1 Jf1 .
INCORPORATED
Kimball, El Toyon and Kimball Skate Park Improvements CHANGE ORDER NO. 2
CIP No: 15-04 February 15, 2016
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
The city has directed the contractor to manufacture and core drill 15 Medallions for the A Ave. project.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor shall design and manufacture per art work supplied by the city 15 each 9" cast bronze
medallions with mounting stud and provide 12 each 10" concrete core drills at locations to be determined and
marked by the city. Cores shall be left in place for future removal. This work shall include all labor, materials
and equipment necessary to complete the work described above for a lump sum price agreed.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders 11,334.75
Subtotal 3,463,677.73
Amount of this change order 7,565.25
New contract amount... $ 3,471,242.98
Working days added: 0 Work ng days subtracted: 0 Percent change in Contract to date 0.55%
Submitted by:
e ft Manager Date ' C Project Manager Date
proved by:
City'Engineer Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
s, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
uments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
to by (Contractor's name):
supervision, overhead
of the or in, I contract
Name:
c5.65-11C0
Date I
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
WESTERN RIM CONSTRUCTORS, INC.
912 S. Andreasen Drive, Suite 108, Escondido, CA. 92029
Phone: 760-489-4328 Fax: 760-489-4304
REQUEST FOR CONTRACT CHANGE ORDER
DATE: 2/11/2016
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
CIP NO: 15-04
WRC PCO NO:
WRC JOB NO:
08.1
202
Description of Change Order Request:
Provide Medallions on A Ave, per attached plans and subcontractor's revised quote.
Item
1 Bravo Sign
2
3
4
Description
Sub Total
Mark Up
Total this Request
Quantity Unit
1 LS
Unit Price
$ 7,205.00 $
$
$
$
Total Price
7,205.00
$ 7,205.00
$ 360.25
$ 7,565.25
By:
Title:
Date:
Western Rim Costructors, Inc. City of National City
Mike Domanski
Project Superintendent
12/22/2015
By:
Title:
Date:
BRAYG
SIGN DESIGN
520 S. CENTRAL PARK AVE. E.
ANAHEIM CA. 92802
PH 714-284-0500 FAX 714-284-0300
LIC#641391 SBE# 0039163 DIR#1000006083
ESTIMATE
150374
Date: 12/18/2015
BSD Contact: Debbie Fiore ext 206
BSD Email: dfiore@bravosign.com
BSD Job #:
ESTIMATE TO:
WESTERN RIM CONSTRUCTORS INC
P 0 BOX 401810
HESPERIA, CA 92340
mdomanski@westernrim.net
Job Name: A AVE MEDALLIONS
ITEM # QTY DESCRIPTION
01 15 DIMENSIONAL BRONZE PLAQUE
Provide Dimensional plaque , stud mounting hardware and
installation patterns
Size: 9" DIA
Type: Cast
Material: Bronze
Finish: Raised single line border, text and logos in a natural stain
finish, recessed leatherette textured background painted Dark
Bronze, flat back
Mounting: Stud Mounting
02 1 SITE WORK- revised 2/8/16
To include:
12 locations - Core drill into concrete ± 10" dia through concrete
sidewalk, Cores will be left in place for future removal at time of
plaque install by others.
Includes layout man on site.
Sales Tax
TERMS REQUIRED PROGRESS 95/5
CONTACT PERSON
MIKE DOMANSKI
760-489-4328
!Site Location: SAN DIEGO CO
UNIT COST
325.00
1,940.00
8.00%
Total Cost
4,875.00T
1,940.00
390.00
Total Cost $7,205.00
Include: shop drawings and only the above as described. Our Standard Certificate of 2 million occurence/2million Agregate.
Excluded if not stated above: shipping, delivery, traffic control, survey/staking. grade, compaction, demo, concrete cutting, haul away of spoils. gravel, concrete mow strip,
concrete paving, added move-ons.
Custom art work must be provide. Additional items can be added to contract if not listed above: engineering, electrical and fixtures, bonds, permits, fees and anti -graffiti
sealant.
Conditions: Submittals will be provided on receipt of signed contractual agreement and deposit.
Standard allowance is 8 to 10 weeks after submittal approval for delivery of product. Note: custom fabricaton might exceed our standard.
IF PAYING BY CREDIT CARD A 3% FEE WILL BE ADDED TO THE TOTAL.
TO ACCEPT THIS ORDER PLEASE SIGN & RETURN. BY SIGNING BELOW. CUSTOMER ACCEPTS THIS PROPOSAL FOR
THE ABOVE AND AGREES TO ALL OF THE TERMS AND CONDITIONS STATED ON THE ESTIMATE
CUSTOMER SIGNATURE & DATE
CALIFORNIA -�-
NATIONAL Cily
INCORPORATED
Kimball, El Toyon and Kimball Skate Park Improvements
CIP No: 15-04
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
CHANGE ORDER NO. 3
March 9, 2016
The city has determined the existing city owned transformer does not have the required capacity or wire size
to properly handle the existing electrical Toads at Kimball Park and needs to be upsized and replaced.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to remove the existing 112 KVA NEMA 1 transformer in Kimball Park and
replace it with a new 150 KVA NEMA 3R transformer and replace conductors all conduit and conductors feeds
as needed to adequately feed and supply the new electrical loads with the Kimball Park Improvements. This
work shall include all labor, materials and equipment necessary to complete the work described above for a
lump sum price agreed including disposal of existing transformer.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 3
Sub .-d by:
Working days subtracted: 0
-121►i J../40
Date
$ 3,452,342.98
18, 900.00
3,471,242.98
14,860.65
$ 3,486,103.63
Percent change in Contract to date 0.98%
City Project Mana
03 /4?-16
Date
C1ty4`ngineer % Date City Manager, required for change orders >s24s99 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, f- - , bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the on ' na ontract • ments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Contractor's name):
3 1co
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
WESTERN RIM CONSTRUCTORS, INC.
912 S. Andreasen Drive, Suite 108, Escondido, CA. 92029
Phone: 760-489-4328 Fax: 760-489-4304
REQUEST FOR CONTRACT CHANGE ORDER
DATE: 2/17/2016
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
CIP NO: 15-04
WRC PCO NO: 013
WRC JOB NO:
202
Description of Change Order Request:
Upgrade existing transformer as well as primary & secondary conductors
Item
1 Ace Electric
2
3
4
Description
Sub Total
Mark Up
Total this Request
Quantity Unit Unit Price Total Price
1 LS $ 14,153.00 $ 14,153.00
$
$
$ -
WRC requires a 3 work day time extension to perform this additional work
$ 14,153.00
$ 707.65
$ 14,860.65
By:
Title:
Date:
Western Rim Costructors, Inc. City of National City
Mike Domanski
Project Superintendent
2/11/2016
By:
Title:
Date:
0
ACE ELECTRIC
February 11, 2016
Western Rim Constructors
912 S. Andreasen Dr., Ste. 108
Escondido, CA 92029
Attention Mike Domanski
Subject. Kimball & El Toyon Park
Change Order #04 — Replace Transformer
Mike,
Please issue a change order of $14,153.00 for replacing the city owned transformer as well as the primary and
secondary wiring as requested. Please see the breakdown below for details.
Please call if you have any questions or if you need additional information.
Sincerely,
Ryan Swenson
P.O. Box 601071
San Diego, CA 92160-1071
Lic. No. 835109 A,C10 Tel (619) 521-9740 ext. 102
www.AceElectriclnc.com Fax (619) 521-9742
2/11/2016 2:22:15 PM
Ace Electric, Inc.
Kimball and El Toyon Change Orders
Totals (Summary) - Bid Summary: Default
Page 1
Material
Non -Quoted $6,866,89
Quotes 0.00
Sales Tax (9.00%) 618.02
Total Material S7,484.91
Labor
Direct (64.47 hours @ $74.80) $4,822.36
Non -Productive Labor 0.00
Total Labor 54,822.36
Direct Job Expenses $0.00
Tools and Miscellaneous Materials 0.00
Subcontracts 0.00
Job Subtotal (Prime Cost) S12,307.27
Overhead (15.00%) 1,846.09
Profit (0.00%) 0.00
Job Total S14,153.36
Actual Bid Price S14,153.36
2111f2018 2:22:06 PM Ace Electric, Inc. Page 1
Kimball and El Toyon Change Orders
Job Number: 1778-CO
Extension By Section
Item # Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr
- Replace Transformer --
1208 4" PVC 25 184.92 C 46.23 7.20 C 1.80
1595 4" Locknui 2 979.75 C 19.60 0.11 E 0.22
1935 2" Seal-tite Conn (Str) 1 3,979.96 C 39.80 025 E 0.25
1956 2" Seal-tite Conn (90 Degree) 1 6,065.82 C 60.66 0.50 E 0.50
2069 4" PVC Male Adaptor 2 530.10 C 10.60 0.16 E 0.32
2123 4" PVC Coupling 2 355.89 C 8.01 0.13 E 0.29
2135 4" PVC Elbow 2 1,711.33 C 34.23 0.90 E 1.80
2293 2" 2-Hole Strap 1 163.99 C 2.05 3.00 C 0.04
2794 #4 THHN CU Stranded Wire 15 674.19 M 10.11 10.20 M 0.15
2799 #210 THHN CU Stranded Wire 75 2,048.47 M 153.64 18.00 M 1.35
2806 #500MCM THHN CU Stranded Wire 120 732.06 C 878.47 39.60 M 4.75
3632 150 KVA 3PH Transformer 480/277V 1 4,680.17 E 4,680.17 21.60 E 21.60
6673 3/4"x10' Copper Ground Rod 1 17.12 E 17.12 0.44 E 0.44
6676 3/4" Ground Rod Clamp 1 424.01 C 4.24 0.24 E 0.24
6857 #2 1-Hole Copper/Alum Lug 1 1.69 E 1.69 6.00 C 0.06
6859 #2/0 1-Hole Copper/Alum Lug 4 2.69 E 10.76 9.60 C 0.38
6863 #500 1-Hole Copper/Alum Lug 4 14.39 E 57.56 18.00 C 0.72
7072 18'Wx24"0 Trench -Back Hoe 25 8.40 E 210.00 12.00 C 3.00
8085 2" Liquidtight Non -Metallic 10 459.53 C 45.95 21.60 C 2.16
T0008 Concrete Pad 1 240.00 E 240.00 16.00 E 16.00
T0009 Transformer Mounting Hardware 1 36.00 E 36.00 1.20 E 1.20
T0010 Demo Transformer 1 300.00 E 300.00 7.20 E 7.20
- Replace Transformer Total - 6,866.89 64.47
Job Total
6,866.89 64,47
CALIFORNIA
Working days subtracted: 0
NATIONAL CITY
V3;31
INCORPORATED
Kimball, El Toyon and Kimball Skate Park Improvements CHANGE ORDER NO. 4
CIP No: 15-04 March 9, 2016
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order.
The city has determined the existing city conduit and wire routed beneath the Kimball Park Plaza area needs
to be rerouted due to conflict with new building improvements.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to relocate multiple conduits as they conflict with the new building location
and replace existing wire due to incorrect sizing. The conduit is currently located under the Team Room area
in the Plaza and will be relocated outside the new building foundation. This work shall include all labor,
materials and equipment necessary to complete the work described above for a lump sum price agreed.
Original Contract Amount...... $ 3,452,342.98
Net change by previously authorized Change Orders 33,760.65
Subtotal 3,486,103.63
Amount of this change order 9,261.53
New contract amount... ... $ 3,495,365.16
Working days added: 3
!Sub d by:
Percent change in Contract to date 1.25%
D3/0- h6
Date
City'Engineer Date City Manager, required for Change aWera>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, f: - bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the ori•ycontract .; ents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
(1 (00
Name: Date
by (Contractor's name):
Note to Contractor if you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
WESTERN RIM CONSTRUCTORS, INC.
912 S. Andreasen Drive, Suite 108, Escondido, CA. 92029
Phone: 760-489-4328 Fax: 760-489-4304
REQUEST FOR CONTRACT CHANGE ORDER
DATE: 2/11/2016
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
CIP NO: 15-04
WRC PCO NO: 011
WRC JOB NO:
202
Description of Change Order Request:
Rerouting of Step Down Transformer, Coduit, Conductors and Pullboxes as required in Note 8 Sheet 40 of the Kimball
Park and El Toyon Park drawings.
Item
1 Ace Electric
2
3
4
Description
Sub Total
Mark Up
Total this Request
Quantity Unit
1 LS
WRC requires a 3 work day time extension to perform this additional work
Unit Price
$ 8,820.50 $
$
$
$
Total Price
8,820.50
$ 8,820.50
$ 441.03
$ 9,261.53
By:
Title:
Date:
Western Rim Costructors, Inc. City of National City
Mike Domanski
Project Superintendent
2/11/2016
By:
Title:
Date:
0
ACE ELECTRIC
February 1, 2016
Western Rim Constructors
912 S. Andreasen Dr., Ste. 108
Escondido, CA 92029
Attention Mike Domanski
Subject Kimball & El Toyon Park
Change Order #03 — Re -Route Feeder
Mike,
Please issue a change order of $8,820.00 for re-routing the feeder referenced in note 8 on sheet 40. This note
states that the contractor is to verify possible required re-routing with SDG&E. This feeder is private and is
being re -located as required. Please see the breakdown below for details.
Item
Qty
$
Total
2" PVC
575
$2/LF
$1,150.00
#2/0
1725'
$3,824/Thousand
$6,596.40
#4
575'
$1,868/Thousand
$1,074.10
Total
$8,820.50
Please call if you have any questions or if you need additional information.
Sincerely,
Ryan Swenson
P.O. Box 601071
San Diego, CA 92160-1071
Lic. No. 835109 A,C10 Tel (619) 521-9740 ext. 102
www.AceElectriclnc.com Fax (619) 521-9742
»- CA4100
NATION
l313
INCORPORATED
Kimball, El Toyon and Kimball Skate Park Improvements
CIP No: 15-04
Contractor: Western Rim Constructors, Inc.
CHANGE ORDER NO. 5
March 18, 2016
Reason/Purpose for this Change Order -
The city has determined additional site furnishings needed to meet Building Code requirements for the
construction of the new restrooms in Kimball Park. This work was originally part of the Additive Alternates not
previously awarded by the city.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed and agrees to maintain unit costs previously provided as bid alternates for
the following site furnishing at Kimball Park: 3 Standard Picnic Tables @ $1,652.13 each and 3 ADA Picnic
Tables @ $1,610.77 each. This work shall include all labor, materials and equipment necessary to complete
the installation of the work described above for the lump sum price agreed based on the unit prices listed
above.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders 41,325.90
Subtotal
Amount of this change order
New contract amount ...
Working days added' 0 g days subtracted: 0
SUP' by:
3,493,668.88
9,788.70
$ 3,503,457.58
Percent change in Contract to date 1.48%
City Project Mana,~r
ngineer Date City Manager, required for Change Orders 424,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
ocuments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
It2
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
d to by (Contractor's name):
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
WESTERN RIM CONSTRUCTORS, INC.
912 S. Andreasen Drive, Suite 108, Escondido, CA. 92029
Phone: 760-489-4328 Fax: 760-489-4304
REQUEST FOR CONTRACT CHANGE ORDER
DATE: 2/11/2016
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
CIP NO: 15-04
WRC PCO NO: 012
WRC JOB NO:
202
Description of Change Order Request:
Provide Additive Alternate Bid Items 108, 109 & 111 as Requested in email dated 2/1/16
Bid Item
108 Picnic Tables
109 ADA Picnic Tables
111 Plaza Lights
4
Description
Sub Total
Total this Request
Quantity Unit Unit Price
3 EA $ 1,652.13 $
3 EA $ 1,610.77 $
7 EA $ 7,304.56 $
$
WRC requires a 10 work day time extension to perform this additional work
Total Price
4,956.39
4,832.31
51,131.92
$ 60,920.62
$ 60,920.62
By:
Title:
Date:
Western Rim Costructors, Inc. City of National City
Mike Domanski
Project Superintendent
2/11/2016
By:
Title:
Date:
CALIFORNIA --"-
NATIONAL CITY
INCORPORATED
Kimball, El Toyon and Kimball Skate Park Improvements
CIP No: 15-04
Contractor: Western Rim Constructors, Inc.
CHANGE ORDER NO. 6
March 18, 2016
Reason/Purpose for this Change Order -
The city has determined additional lighted is near the new restrooms in Kimball Park. This work was originally
part of the Additive Alternates not previously awarded by the city.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed and agrees to maintain unit costs previously provided as bid alternates for
seven additional pendant lights located near the new restrooms in the Plaza area at Kimball Park. This work
shall include all labor, materials and equipment necessary to complete the installation of the lights at the
location described above and as shown on the plans. All work described above shall be installed for the lump
sum price stated below.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
itted by:
48,891.15
3,501,234.13
51,131.92
$ 3,552,366.05
Percent change in Contract to date 2.90%
o3f23/fG
City Project Man- .? Date
Wo ng days subtracted: 0
anager Date
ed by
City'Engineer Date
City Manager, required for Change Orders>s24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervisioverhear es, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the o igina contra cuments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
d to by (Contractor's name):
lkY1110
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
WESTERN RIM CONSTRUCTORS, INC.
912 S. Andreasen Drive, Suite 108, Escondido, CA. 92029
Phone: 760-489-4328 Fax: 760-489-4304
REQUEST FOR CONTRACT CHANGE ORDER
DATE: 2/11/2016
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
CIP NO: 15-04
WRC PCO NO: 012
WRC JOB NO:
202
Description of Change Order Request:
Provide Additive Alternate Bid Items 108, 109 & 111 as Requested in email dated 2/1/16
Bid Item
108 Picnic Tables
109 ADA Picnic Tables
111 Plaza Lights
4
Description
Sub Total
Total this Request
Quantity Unit Unit Price
3 EA $ 1,652.13 $
3 EA $ 1,610.77 $
7 EA $ 7,304.56 $
$
WRC requires a 10 work day time extension to perform this additional work
Total Price
4,956.39
4,832.31
51,131.92
60, 920.62
$ 60,920.62
By:
Title:
Date:
Western Rim Costructors, Inc. City of National City
Mike Domanski
Project Superintendent
2/11/2016
By:
Title:
Date:
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
WESTERN RIM CONSTRUCTORS
Change Orders #1R, #2, #3, #4, #5, #6
Kimball Park, El Toyon Park & Kimball Skate Park Improvements
Judy Hernandez (Engineering/Public Works) Forwarded Copy of
Change Orders to Western Rim Constructors