Loading...
HomeMy WebLinkAbout2016 CON Kinsman Construction - Police Department Building Improvements - Change Orders #5 #6 #8 #10+�— CALIFORNIA -{+ NoIONAL ory `— rNCORPORATE� NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 Contractor: KINSMAN CONSTRUCTION, INC. CHANGE ORDER NO. 5 April 12, 2016 Reason/Purpose for this Change Order: The City asked for additional crystaline waterproofing, concrete bottoms to the planters with waterproofing and drainage. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the price of $19,011.07 and as further described in change order request 7 and 9r.1, attached. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 768,463.00 7,104.75 775,567.75 19,011.07 New contract amount $ 794,578.82 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 3.40% S / •b q/2O// ( Project Manager Date Approved by: 4/Vevrik ........ Yl2///‘ Ci Engineer Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. ted and agreed to b KINSMAN CONSTRUCTION, Inc. I �S Name: //sl (L Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 -a-• CALIFORNIA NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 NATIONAL ory d33/ rNCORPOAATE. CHANGE ORDER NO. 5, Attachment "A" DATE: April 12, 2016 WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC DESCRIPTION OF WORK: New doors, electrical panel ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Provide additional crystaline waterproofing $ 6,805.70 2 Provide concrete bottoms to planters, inlcuding waterproofing and drain $ 12,205.37 TOTAL $ 19,011.07 PKCI KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 007 PHONE: 858-634-8180 DATE: 03/08/16 JOB NAME. National City Police Department LOCATION: 1200 National City BIM JOB NUMBER: S5-029 IZIX: 858-634-8184 CONTRACT NUMBER: Change Order Request #007 Item No. Description Amount 1. Additional Crystalline Waterproofing $5,918.00 2. OH&P @ 15% $887.70 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $6,805.70 DATE 03/08/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 �.- _-� INCREASE CONTRACT AMOUNT BY:: $6,805.70 -44:S`4.---_ �_ AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 TO: KINSMAN CONSTRUCTION, INC Derrick Anderson PPc 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 009r.1 PHONE: 858-634-8180 DATE 03/18/16 JOB NAME: National City Police Department LOCATION: 1200 National City Blvd JOB NUMBER: S5-029 I: x: 858-634-8184 CONTRACT NUMBER: Change Order Request #009r.1 Item No. Description Amount 1. Add concrete slab at bottom of planters currently in contract for waterproofing Planters originally thought to have bottoms where in fact bottomless $2,440.00 2. Additional waterproofing requirements per waterproofing consultant at new Concrete bottoms/pads $2,500.00 3. Add drainage to planters $5,673.37 4. OH&P $1,592.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $12,205.37 DATE 03/18/16 BASE CONTRACT AMOUNT: (original contract amount) Moo - INCREASE CONTRACT AMOUNT BY: $12,205.37 1? AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 CALIFORNIA .4- . TIONALCITY' EA _I INCORPORATED NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 Contractor: KINSMAN CONSTRUCTION, INC. CHANGE ORDER NO. 6 May 3, 2016 Reason/Purpose for this Change Order: The City requested electrical revisions as suggested by PD staff. Also, the City asked that burned out lights within the building be replaced. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the price of $20,775.93 and as further described in change order request 13 and 8, attached. Original Contract Amount . $ 768,463.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 26,115.82 794, 578.82 20,775.93 Percent change in Contract to date 6.10% 815,354.75 Submitted by: Project Manager Dat Res a En ineer D_te Approved by: Cit ngineer SAI M Date City Mager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by KINSMAN CONSTRUCTION, Inc. Zit Name: 5',/ey/,poi Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 NATIONAL Orr iectt INCORPORATED CHANGE ORDER NO. 6, Attachment "A" DATE: May 3, 2016 WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC DESCRIPTION OF WORK: Electrical revisions, flow valve, ADA ramp ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Provide Delta 4 electrical revisions $ 17,261.98 2 Replace lighting in the building $ 3,513.95 3 TOTAL $ 20,775.93 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPc 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 013 PHONE.- 858-634-8180 DATE: 04/1.9/16 JOB NAME: National City Police Department LOCATION: 1200 National City Blvd JOB NUMBER: S5-029 FAX 858-634-8184 CONTRACT NUMBER: Change Order Request #013 Item No. Description Amount 1. Delta 4 Electrical Revisions $15,010.42 2. OH&P $2,251.56 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $17,261.98 DATE 04/19/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 - g_. r' INCREASE CONTRACT AMOUNT BY: $17,261.98 - . AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 008 PHONE: 858-634-8180 DATE: 03/16/16 JOB NAME: National City Police Department LOCATION: 1200 Notional City Blvd JOB NUMBER: S5-029 FAX 858-634-8184 CONTRACT NUMBER: Change Order Request #008 Item No. Description Amount 1. Lamp and balast replacement per site walk and electrician assesment $3,055.61 2. OH&P @ 15% $458.34 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $3,513.95 DATE 03/16/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 -fi INCREASE CONTRACT AMOUNT BY: $3,513.95 -g-- . AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 -0— CALIFORNIA NATIONAL CITY nov `-/ NCORPORATE) NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 Contractor: KINSMAN CONSTRUCTION, INC. CHANGE ORDER NO. 8 May 3, 2016 Reason/Purpose for this Change Order: The City requested a revision to the duct in the basement. Also, a new flow valve is required on the fire riser at City Hall. A new ADA ramp is needed at the door to the evidence area from the basement. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the price of $14,753.59 and as further described in change order request 12, 14 and 15, attached. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 768,463.00 173,898.75 942,361.75 14,753.76 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 24.55% 957,115.51 itt roject Manager 5/11140 Date Res ent Engineer 5. ate Approved by: Cit Engineer Date Ciy Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by KINSMAN CONSTRUCTION, Inc. Name: D to Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 -}- CALIFORNIA NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 NOTIONAL CITY Vaal INCORPORATED CHANGE ORDER NO. 8, Attachment "A" DATE: May 3, 2016 WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC DESCRIPTION OF WORK: Electrical revisions, flow valve, ADA ramp ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Replace flow valve at fire riser $ 1,351.00 2 Construct ADA ramp in garage at door $ 5,089.00 3 Revise basement HVAC duct $ 8,313.76 TOTAL $ 14,753.76 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 012 PHONE: 858-634-8180 DATE: 04/06/16 JOB NAME: National City Police Department LOCATION 1200 National City Blvd JOB NUMBER: S5-029 FAX 858-634-8184 CONTRACT NUMBER: Change Order Request #012 Item No. Description Amount 1. Revise Basement Ducting at Exhaust System per Direction $7,229.36 2. OH&P $1,084.40 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $8,313.76 DATE 04/06/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 44sl INCREASE CONTRACT AMOUNT BY: $8,313.76 _ t_ AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 014 PHONE 858-634-8180 DATE: 04/20/16 JOB NAME: National City Police Department LOCATION- 1200 National City Blvd JOB NUMBER: S5-029 FAX. 858-634-8184 CONTRACT NUMBER: Change Order Request #014 Item No. Description Amount 1. Flow Valve replacement at Fire Riser (Schmidt) $725.00 2. Safe off and Alarm Rewire (JJJ) $450.00 2. OH&P $176.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $1,351.00 DATE 04/20/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 >°''s' INCREASE CONTRACT AMOUNT BY: $1,351.00 ,— �� AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office.' 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 015 PHONE: 858-634-8180 DATE: 04/20/16 JOB NAME: National City Police Department LOCATION 1200 National City Blvd JOB NUMBER: S5-029 PAX' 858-634-8184 CONTRACT NUMBER: Change Order Request #015 Item No. Description Amount 1. Demo concrete and pour new sloped ADA compliant ramp at New Door into 2. evidence room per plan sheet SKA-03 dated 3-22-2016 $4,425.00 2. OH&P $664.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $5,089.00 DATE 04/20/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 ,te r-". - -, INCREASE CONTRACT AMOUNT BY: $5,089.00 _ AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 -0- CALIFORNIA - NATIONAL C INCORPORATED NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 Contractor: KINSMAN CONSTRUCTION, INC. CHANGE ORDER NO. 10 June 6, 2016 Reason/Purpose for this Change Order: The City requested a proposal from the contractor to replace a damaged roll up gate at the entrance to the parking deck. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the price of $4,910.50 and as further described in change order request 23, attached. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 768,463.00 212,010.99 980,473.99 4,910.50 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 28.23% 985, 384.49 ubm ed b ate R ident Engineer ate 4 Project Manager Approved by: ........., C. Engineer t� ..,.7�‘ Date City Manager, required forChangeorders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. ted and a•reed to b KINSMAN CONSTRUCTION, Inc. Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 NATIONAL Orr oUJQ INCOAPORAI'ED CHANGE ORDER NO. 10, Attachment "A" DATE: June 6, 2016 WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC DESCRIPTION OF WORK: Roll up door ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Replace roll up gate $ 4,910.50 2 TOTAL $ 4,910.50 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 023 PHONE: 858-634-8180 DATE: 06/03/16 JOB NAME: National City Police Department LOCATION 1200 National City Blud JOB NUMBER: S5-029 FAX 858-634-8184 CONTRACT NUMBER.: Change Order Request #023 Item No. Description Amount 1. Replace damaged rolling grill curtain at parking structure with new 12' x 13'-2" new Manufactured rolling grille. Mill finish aluminum rods and bottom rail Removal and haul away of damaged gate included. Motors and gears not able to be tested $4,270.00 OH&P $640.50 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $4,910.50 DATE 06/03/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 r, , , _, INCREASE CONTRACT AMOUNT BY: $4,910.50 _-- �.. _ ,.--- AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 viNY/1RD DGDR5 ! NC. 3605 Pacific Highway San Diego, CA 92101 619-298-9951 Tel 619-298-9957 Fax Contractors License No. 472758 CUSTOMER in this offer shall refer to: Gerard Schultz Kinsman Construction 6711 Nancy Ridge Rd San Diego, CA 92121 Phone (858) 587-1277 Fax QUOTATION Quote: 43147 Date: 6/2/2016 By: Rudd, Michael JOBSITE in this offer shall refer to: Gerard National City Police Dept. 1200 National City Blvd National City, CA 91950 Phone Fax Top Parking structure grille was run into by vehicle. We propose to remove and haul the damaged (1) 12'x 13'-2" R&S Manufacturing rolling grille. Furnish and install (1) 12'x 13'-2" R&S Manufacturing replacement rolling grille curtain with bottom bar assembled, Mill -finished aluminum rods and bottom bar. Lead Time for this curtain size is 2-weeks. Prevailing wage included. NOTES: If the opening is not ready upon arrival, we will have to charge for down time at the rate of $145.00 per hour. Installation to be during normal weekday working hours. Industry standard 30-day repair warranty is included. This estimate is based on our initial inspection and does not include the repair cost of any hidden damage that may be discovered after work has started. We will hook up the existing operator, but will assume no responsibility for its proper performance, nor will the door be warranted if damage is due to operator malfunction. Please sign this proposal, fill out the lien information form, sign the terms and conditions, and return them to place this order. This Quote must be Signed and Returned to Place this Order. TOTAL: $4,270.00 NOTICE: Under the Mechanic's Lien Law (California Code of Civil Procedure, Section 1181 et seq.), any contractor, subcontractor, laborer, supplier or other person who helps to improve your property but is not paid for his work or supplies, has a right to enforce a claim against your property. This means that, after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your own contractor in full, if the subcontractor, laborer or supplier remains unpaid. The terms and conditions set forth above constitute the entire offer of Vinyard Doors, Inc. and any additional terms proposed by CUSTOMER are rejected unless expressly assented to in writing. ACCEPTANCE of the OFFER shall constitue a CONTRACT on the terms and conditions set forth herein. Acceptance of this offer shall be communicated to Vinyard Doors, Inc. by returning the offer DATED and SIGNED by an AUTHORIZED agent or representative of CUSTOMER. If ou arenota commercialgbusiness or lerr�r r l Q r xi i�nisgYo �gj rja e rwAl ip or corporation, you may cancel this transaction at anytime prior to midnight on the third bus half{ a 15f f� �t C S THIS OFFER SUBJECT TO TERMS AND CONDITIONS STATED ABOVE. YOUR SIGNATURE HEREON ACKNOWLEDGES YOUR ACCEPTANCE We ACCEPT your OFFER and AGREE to be bound by the terms and conditions set forth herein. BY: Authorized agent or representative DATE: Print or type name and title Contractors's License No. Alf II TV CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk KINSMAN CONSTRUCTION Change Orders #5, #6, #8, #10 Police Department Building Improvements Project Judy Hernandez (Engineering/PW) Forwarded Copy of Change Orders to Kinsman Construction