HomeMy WebLinkAbout2016 CON West Tech Contracting - Paradise Creek Restoration Project - Change Order #2CALIFORNIA NATIONAL C Ty J='1 INCORPORATED Paradise Creek Restoration CHANGE ORDER NO. 2 CIP No: 15-05 May 19, 2016 Contractor: West -Tech Contracting, Inc. rReason/Purpose for this Change Order: The city has directed the contractor to remove asbestos pipe from the creek channel. The City of National City and Contractor agree to the following change to the original Contract: During excavation of line 1 on sheet 23 of 41 the contractor encountered approximately 40 If of asbestos transite pipe. The city directed the contractor to remove and dispose of this pipe per local, State and Federal regulations including filing all necessary manifests. All work shall be performed at the agreed lump sum price below. Original Contract Amount $ 1,660,922.33 Net change by previously authorized Change Orders Subtotal (55,226.00) 1,605,696.33 Amount of this change order 2,100.00 New contract amount $ 1,607,796.33 Working days added: 0 Workin• days subtracted: 0 Percent change in Contract to date -3.20% —1—lb Date Af City Project Manag Date ngineer Date City Manager, required for Change Orders>i24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Acce•ted and agreed to b Contractor's name): jl✓oS�- 1 C'/ co.," I'YIetc iN G, ',v c Name iCK tie RAr.S,EA-1 /0723r6Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk WEST -TECH CONTRACTING Change Order #2 Paradise Creek Restoration Project Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to West -Tech Contracting