HomeMy WebLinkAbout2016 CON Kinsman Construction - Police Department Building Improvements - Change Order #9«— CALIFORNIA — NATIONAL CITIr acov `- INCORPORATED NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 Contractor: KINSMAN CONSTRUCTION, INC. CHANGE ORDER NO. 9 June 1,2016 Reason/Purpose for this Change Order: Due to a conflict with the size of the AC units to be installed in the server room on the second floor, the contractor found it necessary to use a crane to place the units on the patio at the break room and then to remove a door frame leading into the hall in order to get the units into the server room. Also, the City requested replacement of door hardware on 18 doors and the provision for 6 spare hardware sets for building stock. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the price of $23,358.48 and as further described in change order request 16 and 18, attached. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal 768,463.00 188,652.51 957,115.51 Amount of this change order 23,358.48 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 27.59% 980,473.99 Chi/ (p Date Resident Engineer Date Approved by: En ineer dtia Date Cily Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by KINSMAN CONSTRUCTION, Inc. SeiJ Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 NATIONAL, CJT S3 11 INCORPORATES CHANGE ORDER NO. 9, Attachment "A" DATE: May 17, 2016 WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC DESCRIPTION OF WORK: AC units, Door hardware ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Crane placement of AC units $ 2,940.23 2 Door hardware and spare parts $ 20,418.25 TOTAL $ 23,358.48 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 16r.1 PHONE: 858-634-8180 DATE: 05/10/16 JOB NAME: National City Police Department LOCATION: 1200 National City Blvd JOB NUMBER: S5-029 PAX. 858-634-8184 CONTRACT NUMBER. Change Order Request #016r.1 Item No. Description Amount 1. Crane work to place HVAC Unit at 2nd floor due to interior doors being to small $1,293.23 2. Wall remove and replace with door and frame for the HVAC $1,647.00 3. OH&P $0.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $2,940.23 DATE 05/10/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 s, INCREASE CONTRACT AMOUNT BY: $2,940.23 AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 018 PHONE 858-634-8180 DATE: 05/10/16 JOB NAME: National City Police Department LOCATION: 1200 National City Blot JOB NUMBER: S5-029 FAX 858-634-8184 CONTRACT NUMBER. - Change Order Request #018 Item No. Description Amount 1. New Hardware per Instruction and Request $17,755.00 Includes: 14 Schlage L Series Lock/Leversets installed 4 Von Duprin Exit Devices Installed with existing cylinders 6 Schlage L series for building stock. 2. OH&P $2,663.25 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $20,418.25 DATE 05/10/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 ,,,e _ INCREASE CONTRACT AMOUNT BY: $20,418.25 � AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 SUBCONTRACTOR COST PROPOSAL SUMMARY SHEET - FORM II Subcontractor Name: Luber Mechanical Corporation National City Police Department Description: Rigging AC Equipment Cost Proposal/Field Order No. #2 NET COSTS: Attach supporting Forms II, 111, IV COSTS (1) 1. TOTAL NET COSTS (From Form 111) $2,249.11 2. Royalties, Permits, Utilities, Etc.: $0.00 3. SUBTOTAL LINES 1&2: $2,249.11 4. Insurance: Rate % of Line 3 $0.00 5. COST OF EXTRA WORK: This Subonctractor Only. Total Lines 3 & 4 $2,249.11 6. MARKUP FEE: for actual work performed - 15% of line 5 This Subcontractor Only (7.3) $337.37 7. SUBTOTAL THIS SUBCONTRACTOR - Lines 5 & 6 $2,586.47 8. SUMMARY OF COSTS: Lower Tier Subcontractors - Sub - Subcontractors (From Form II Subcontractors) $0.00 (List Each Separately) $0.00 9. SUBTOTAL LINE 8 $0.00 10. HANDLING FEE: Maximum 5% of Line 9 $0.00 1 11. TOTAL THIS SUBCONTRACTOR: Total Lines 7, 9 & 10 (Carry to Line 8 Gen. Contractor Summary Sheet - Form I) $2,586.47 NOTE: Round off all Costs to the neartest Dollar UCSD 3/12113 3 of 6 Exhibit 8 Prime Contractor Kinsman Construction National City Policy Department Luber Mechanical Corporation Subcontractor Sub -Subcontractor Date: 4/6/2016 ITEM NO. DESCRIPTION MATERIAL LABOR EQUIPMENT TOTAL COST AMT UNIT COST COST HRS LABOR RATE* COST HRS EQ RATE COST ADD DEDUCT Rigging AC equipment ( Crane work) 6 S73.57 $441.42 4 $170.00 $680.00 $1,121.42 02 7% Fuel/ CA Emission Surcharge 0 $0.00 $0.00 0 $73.57 $0.00 $47.60 $47.60 Traffic Control $100.00 4 S73.57 S294.28 $294.28 0 $0.00 $0.00 0 $73.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $73.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub total $0.00 S727.60 $727.60 Sales Tax $0.00 $0.00 $58.21 $58.21 Total Cost $0,00 $0.00 $0.00 $0.00 `Agreed Total Hourly Rate From Labor Rate Breakdown Sheet - Form IV TOTAL NET COST (Sum of Total Cost Column) $2,249.11 UCSD 3/12/13 4 of 6 Exhibit 8 10728 Prospect Ave Suite "E" Santee, CA 92071 Phone: 619-448-DOOR (3667) / Fax: 619-448-3607 Lic. # 889122 Certified Small Business SBE #1056996, D.I.R. #1000000648 To: Kinsman Construction Date: 04/26/2016 Attn: Gerard Job: National City Police Department — Hardware Replacement Location: National City, CA Architect: Owner: GT Door, Inc proposes to furnish and install material as listed below FOB jobsite, tax included, for the sum of $17,755.00 *Per Jobwalk 04/25/2016 and Instruction Finish Hardware 14 ea. Schlage L Series Lock/Leversets with 03N Escutcheon Trim and 626 Finish. 3 ea. Von Duprin 98 Series Mortise Exit Device and Trim, with 626 Finish. 1 ea. Von Duprin 98 Series Rim Exit Device and Trim, with 626 Finish. *Reuse All Existing Cylinders Misc. Items — For Stock 6 ea. Schlage L Series Lock/Leversets with 03N Escutcheon Trim and 626 Finish. *Installation to Include Removal of Existing Hardware and Installation of New Hardware Above (less stock items) Material $14,230.00 Installation (Prevailing Wages) $3,525.00 Grand Total $17,755.00 Conditions: 1. Pricing valid for 60 days. 2. Our terms are net 30 upon approved credit. There will be an additional charge of 3% on all credit card transactions. We will not accept or agree to any "Paid when Paid" terms! We will not accept or agree to any retention terms on material! 3. Material and installation CANNOT be separated without prior approval. They are priced as a package. 4. If a business license is required specifically for the city the project is located in, the cost of the license will need to be added to the project. 5. Contractors must provide information on all wall thicknesses and door undercuts if such information is not easily and readily available on plans. /9A/9n1 F Pang 1 of 9 6. Price is based upon furnishing hardware as listed in hardware sets of the plans/specifications. We cannot and will not furnish any hardware at no cost that the architect specified incorrectly or failed to specify. 7. Institution Locks (Locks that are locked on both sides), One Sided Trim Locks and Locks that prevent egress from the inside of an opening... Do not meet FirelLife Safety Requirements and may need approval prior to ordering. 8. This bid excludes the following: a. Any windows, glass or glazing. b. All aluminum storefront doors, frames, & hardware. c. Any Cylinders. d. Electronic Hardware, Access Control or Wiring. e. Rework of any existing openings or conditions. f. Wood Doors or Frames. g. Hollow Metal Doors or Frames. h. Special Finishes. i. Access Panels. j. Fire Ratings of any sort. k. Bondo. I. Paint or Field Finishing. m. Special order samples. n. Signage. o. Permanent Keying. p. Operation and Maintenance manuals. q. Any roll -up doors, gates, or gate hardware. r. Storage. s. Demo. t. Refuse containers. u. Grouting or Caulking. v. Bonds. Unless otherwise specified herein the price above is net and shall be paid in full upon receipt of invoice therefore. Provided, however, that when the work extends beyond 30 days, the price shall be paid in monthly progress payments upon presentation of invoices therefore, unless other times for payments are specified herein. For any changes in or deviations from the plans and specifications referred to above involving additional labor or material costs, extra charges will be made in addition to the price stated above, such extra charges are payable upon presentation of invoices therefore. Changes or deviations authorized by Contractor's representative at the job site shall be binding upon the Contractor. 'We agree to pay interest at the rate of 18 percent per annum from the due date. In the event GT Door, Inc. employs an attorney for enforcement of this contract, we agree to pay the costs of such attorney." GT Door, Inc. shall not be liable for any failure to perform caused by strikes, lockouts, acts of God, or other reasons beyond its control. Accepted Date GT Door, Inc Contractor: By: By: �. Name Title Vince Mossman A/9 /9f11 F Pane 9 of 9 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk KINSMAN CONSTRUCTION Change Order #9 Police Dept. Building Improvements Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Kinsman Construction