Loading...
HomeMy WebLinkAbout2016 CON PAL General Engineering - 8th Street Smart Growth Revitalization - Notice of Completion?LEAS'E COMPLETE THIS INFORMATION RECORDING REQUESTED BY: City Engineer City of National City ' 1243 National City Blvd. National City, CA 91950 AND WHEN RECORDED MAIL TO: City Engineer City of National City 1243 National City Blvd. National City, CA 91950 DOC# 2015-0488572 111111111111 h il1 11111111111111111111111111 III Sep 16, 2015 11:36 AM OFFICIAL RECORDS Ernest J. Dronenburg, Jr., SAN DIEGO COUNTY RECORDER FEES: $0.00 PAGES: 2 THIS SPACE FOR RECORDER'S USE ONLY (Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt from Recorder's fees pursuant to Government Code Section 27383) NOTICE OF COMPLETION: 8TH STREET SMART GROWTH REVITALIZATION, CIP NO. 12-13 THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on July 10, 2015 of the 8TH Street Smart Growth Revitalization, CIP No. 12-13 Work of improvement or portion of work of improvement under construction or alteration. Various locations in National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: Owner in fee Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Pal General Engineering, Inc. Name of Original Contractor The following work and material were supplied: Labor provided: General Laborer. Materials: Concrete, asphalt, irrigation supplies, traffic control supplies. Equipment: paving equipment. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Dated: August 4, 2015; Joint tenants tenants in common, or other owners Signature of Owner City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on Au gxr 4, 2015 at, National City, California. Signature: RORRISON, MAYOR N[w09-05 RESOLUTION NO. 2016 — 67 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK OF PAL GENERAL ENGINEERING, INC., FOR THE 8T" STREET SMART GROWTH REVITALIZATION PROJECT, APPROVING THE FINAL CONTRACT AMOUNT OF $4,830,889.17, RATIFYING RELEASE OF RETENTION IN THE AMOUNT OF $241,544.52, AND THE FILING OF A NOTICE OF COMPLETION FOR THE PROJECT WHEREAS, the Engineering Department is satisfied of that all work required to be performed by PAL General Engineering, Inc., for the 8th Street Smart Growth Revitalization Project has been completed; and WHEREAS, the Notice of Completion was filed with the San Diego County Recorder's Office on September 16, 2015. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National City that the work performed PAL General Engineering, Inc., for the 8th Street Smart Growth Revitalization Project is accepted, the total final contract amount of $4,830,889.17 is approved, and payment for said work is ordered to be made in accordance with said contract. BE IT FURTHER RESOLVED that the City Council ratifies the filing of the Notice of Completion and the release of retention in the amount of $241,544.52. PASSED and ADOPTED this 17th day of May, 201 on ' orrison, Mayor ATTEST: 46)Jic Mic ael R. Dalla, Cit Clerk PROVED AS TO FORM: ' audia Gas tua City Att. ne Passed and adopted by the Council of the City of National City, California, on May 17, 2016 by the following vote, to -wit: Ayes: Councilmembers Cano, Mendivil, Morrison, Rios, Sotelo-Solis. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California City Clerk of the City of National ity, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2016-67 of the City of National City, California, passed and adopted by the Council of said City on May 17, 2016. City Clerk of the City of National City, California By: Deputy CITY OF NATIONAL CITY, CALIFORNIA COUNCIL AGENDA STATEMENT Ca0�3 2,q MEETING DATE: May 17, 2016 AGENDA ITEM NO. 9 ITEM TITLE: Resolution of the City Council of the City of National City: 1) accepting the work of PAL General Engineering, Inc. for the 8th Street Smart Growth Revitalization Project, CIP No. 12-13, 2) approving the final contract amount of $4,830,889.17, 3) ratifying release of retention in the amount of $241,544.52, and 4) ratifying the filing of a Notice of Completion for the project. PREPARED BY: Jose Lopez, Civil Engineering Tech. PHONE: 619-336-4312 EXPLANATION: See attached. DEPARTMENT: Engineering & Public Works APPROVED BY: FINANCIAL STATEMENT: APPROVED:/Finance ACCOUNT NO. APPROVED: MIS Retention was paid through prior City Council appropriations. ENVIRONMENTAL REVIEW: N/A ORDINANCE: INTRODUCTION: FINAL ADOPTION: L STAFF RECOMMENDATION: Adopt Resolution BOARD / COMMISSION RECOMMENDATION: N/A ATTACHMENTS: Explanation Notice of Completion 3. Final Contract Balance Sheet 4. Resolution p,GC,aAav't\0‘.1 O. raO\ro-6� EXPLANATION National City's 8th Street Smart Growth Revitalization Project, CIP No. 12-13, included traffic calming, pedestrian, bicycle, Safe Routes to School and streetscape enhancements between Harbor Drive and Highland Avenue to encourage smart growth revitalization and multi -modal connections to the 8th Street Trolley Station. The improvements included enhanced crosswalks with high intensity signing and striping; new, wider sidewalks and pedestrian curb ramps for ADA compliance; new lighting, landscaping and storm water bioretention areas; decorative benches, trash receptacles, bike racks and historic banners; new bike lanes and sharrows with signage on 8th Street between Harbor Drive and Roosevelt Avenue; and traffic calming measures such as corner bulb -outs and a "road diet" on E. 8th Street between National City Boulevard and Highland Avenue converting four travel lanes to two travel lanes with protected left turn lanes at intersections, landscaped islands midblock and replacement of parallel parking with angle parking on the south side of the street. In May 2013, the bid solicitation was advertised in local newspapers and posted on the City's website. In June 6, 2013 the seven (7) sealed bids were received, opened and read to the public. PAL General Engineering, Inc. was the apparent lowest bidder with a total bid of $3,978,336.35, where $3,709,079.35 was for the base bid and $269,257.00 was for additive bids. Upon review of all documents submitted and reference checks, PAL General Engineering, Inc.'s bid was responsive, and they were the lowest responsible bidder qualified to perform the work as described in the project specifications. In June 18, 2013, the City Council adopted Resolution No. 2013-97 awarding the contract to PAL General Engineering, Inc. in the amount of 3,709,079.35 and authorized a 15% contingency in the amount of $556,362.00 for any unforeseen changes. Staff did not recommend awarding the additive bids at the time. The Notice to Proceed with construction was issued on August 12, 2013, with a construction start date of August 13, 2013. In March 18, 2014 City Council adopted Resolution No. 2014-30 authorizing the Mayor to execute Change Order No. 7 to the 8th Street Smart Growth Revitalization contract with PAL General Engineering, Inc. for the lump sum amount of $707,769.09 to procure all street light standards and LED fixtures, decorative poles, and projection lights consistent with the amended lighting plans and project specifications. The Notice of Completion was filed with the San Diego County Recorder's Office on September 16, 2015. The change orders issued for this project are detailed in the Final Contract Balance Report (see attached). The change orders increased the contract by $1,374,112.20, while line item adjustments decreased the contract by $252,302.38, for a net increase of $1,121,809.62 to the contract. This results in a 30.2% contract increase for a final contract balance of $4,830,889.17. As a result of satisfactory completion of the project, staff recommends that City Council: 1) accept the work of PAL General Engineering, Inc. for the 8th Street Smart Growth Revitalization Project, CIP No. 12-13, 2) approve the final contract amount of $4,830,889.17, 3) ratify the release of retention in the amount of $241,544.52, and 4) ratify the filing of a Notice of Completion for the project. RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on July 10, 2015 of the 8'I Street Smart Growth Revitalization, CIP No. 12-13 Work of improvement or portion of work of improvement under construction or alteration. Various locations in National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: Owner in fee Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Pal General Engineering, Inc. Name of Original Contractor The following work and material were supplied: Labor provided: General Laborer. Materials: Concrete, asphalt, irrigation supplies, traffic control supplies. Equipment: paving equipment. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Dated: August 4) 2015; Joint tenants tenants in common, or other owners Signature of Owner City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned; say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on Au'.01%, 2015 at, National City, California. RO r •RRISON, MAYOR Signature: NodM-05 -1- PLEASE COMPLETE THIS INFORMATION RECORDING REQUESTED BY: City Engineer City of National City ' 1243 National City Blvd. National City, CA 91950 AND WHEN RECORDED MAIL TO: City Engineer City of National City 1243 National City Blvd. National City, CA 91950 DOC# 2015-Q488572 III�IIIII1f Ignll IIIIII IuIII1MIIJJIIWINI1lju11ij Sep 18, 2015 11:38 AM OFFICIAL RECORDS Ernest J. Dronenburg, Jr., SAN DIEGO COUNTY RECORDER FEES: $0.00 PAGES: 2 THIS SPACE FOR RECORDER'S USE ONLY (Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt from Recorder's fees pursuant to Government Code Section 27383) NOTICE OF COMPLETION: 8TH STREET SMART GROWTH REVITALIZATION, CIP NO. 12-13 THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) -2- \ CAJ 4FORN`, TSIATION FINAL CONTRACT BALANCE DATE: July 10, 2015 PROJECT: 8' Street Smart Growth Revitalization FY 12-13 Specification No. 12-13 TO: PAL General Engineering Inc. 5374 Eastgate Mall San Diego, CA 92121 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTH: EXTENTION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION: $3,709,079.35 August 28, 2013 July 10, 2015 240 Working Days 190 Working Days 430 Working Days The Final Contract Balance reports final line item amounts and summarizes all change orders to produce a final contract amount. CHANGE ORDERS AND LINE ITEM ADJUSTMENTS: Change Order #1. The contractor requested to move the phasing of the median and median light work on 8th from the beginning of the project to the end of the project in order to facilitate more traffic control options in an effort to enhance project efficiency. This Change Order resulted in a no change to the contract in the amount of $ 0.00. Change Order #2. This change order will allow the Contractor to purchase the anchor bolts for all the street lighting foundations for the project so that the city does not have to procure the items on its own. This Change Order total amount was $ 13,839.99. Change Order #3. This change order is to use hot melt thermoplastic in lieu of preformed thermoplastic for a cost savings to the city and still achieve the same goal. This Change Order reduced the contract amount by $ (29,258.17). -3- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 Change Order #4. This change order is to install new temporary railroad striping at Harbor Drive and 8th street train tracks because there is currently no striping at this location. This Change Order total amount was $ 1,622.25. Change Order #5. Improvements are needed for striping, markings, removals and signs on A Avenue between National City Boulevard and 12th Street to increase the number of available parking spaces. This Change Order total amount was $ 7,019.25. Change Order #6 The Resident Engineer reviewed the existing soil conditions and recommends that #4 rebar 24" on center both directions be added to the concrete section for the bus stop pads to strengthen the tensile strength to handle the expected increased loads. This Change Order total amount was $ 6,563.46. Change Order #7. The street light standards and fixtures, decorative poles and project lights are not part of the original contract. This change order provides for the procurement of all the street light standards, LED fixtures, decorative poles and projection lights for under the 1-5 overpass that are required for the completion of the street lighting and art elements of the project. This Change Order total amount was $ 707,769.09. Change Order #8. There are 3 Mexican Fan Palms at the Northwest corner of 8th Street and F Avenue that are in conflict with the new improvements. The Engineer recommends that they be removed for the new planter area to be properly installed. This Change Order total amount was $ 1,144.50. Change Order #9. The Engineer found a grade conflict with the sidewalk layout of the new improvements at Station 47+50. To fix make the grades ADA compliant.. The work proceeded by time and materials under the direction of the Engineer. This Change Order total amount was $ 655.92. Change Order #10. The City Engineer requests additional striping, and markings on 16th Street and Highland Avenue and behind City Hall at the handicap stall that were not included in the original contract. This Change Order total amount was $ 4,189.50. Change Order #11. The Engineer directed the contractor to remove the driveway at 333 8th Street because the grades were in conflict with the new sidewalk, curb and gutter improvements. This Change Order total amount was $ 277.20. Change Order #12. Unsuitable subgrade was discovered on the North Side of 8th Street between stations 41+30 to 42+30 and 47+00 to 49+25. The contractor was directed by the engineer to process the material but still did not pass compaction testing. Ninyo & Moore visited the site to give recommendations on a cost effective street section to pass compaction -4- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 testing. Under the direction of the engineer and per Ninyo & Moore's Memorandum dated 3/20/14, the Contractor shall remove and dispose of unsuitable subgrade and replace with 12" Thick 3-Sack Slurry. This Change Order total amount was $ 16,500. Change Order # 13. To provide a uniform finish and look the City Engineer directs the Contractor to proceed with additive item A-7 "Procure Decorative Paving P-1 & Install Decorative Paving P-1 per Manufacturer's Specifications." The plans state that any pavers installed East of D Avenue along 8th Street to be additive item A-7. This Change Order total amount was $ 28,710.00. Change Order # 14. To provide a safe pedestrian barrier between the sidewalk and Bio- Retention/Planter areas the City Engineer directs the Contractor to install SDRSD G-6 Type B-3 Curb around the perimeter of the existing Bio-Retention/ Planter areas. This Change Order total amount was $ 20,286.00. Change Order #15. To provide a safe pedestrian barrier between the sidewalk and Bio- Retention/Planter areas the City Engineer directs the Contractor to install SDRSD G-6 Type B-3 Curb around the perimeter of the Bio-Retention/ Planter areas. This Change Order total amount was $ 37,925.00. Change Order #16. During set up for improvement installation on 8th between F Ave to G Ave discrepancies were discovered between the design and existing conditions. The engineer was contacted immediately and the contractor experienced idle time for manpower and equipment during the redesign and the contractor re -graded, re -compacted and reset the forms for the improvements. This Change Order total amount was $ 1,645.78. Change Order # 17. The original plans were revised on the Northwest corner of 8th Street and E Avenue because the bulbout extended into a current driveway with a gate. The revised plans were changed to shrink the bulbout radius and to replace the driveway. During the construction the gate loop detectors were taken out and needed to be replaced. This Change Order total amount was $ 1,890.00. Change Order #18. Unsuitable subgrade was discovered during excavation of the street section on the North side of 8th Street at the G Avenue intersection between stations 49+00 and 50+40. Ninyo & Moore visited the site to give recommendations on a cost effective street section to pass compaction testing. Under the direction of the Engineer and per Ninyo & Moore's Memorandum dated 4/1/14, the Contractor shall remove and dispose 12" of the unsuitable subgrade and replace with a layer of Tensar Biaxial Geogrid and crushed aggregate base. This Change Order total amount was $ 16,293.00. -5- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 Change Order #19. Unsuitable subgrade was discovered during excavation of the street section on the South side of 8th Street at the A Avenue intersection between stations 28+50 and 30+50. Ninyo & Moore visited the site to give recommendations on a cost effective street section to pass compaction testing. Under the direction of the Engineer and per Ninyo & Moore's Memorandum dated 4/23/14, the Contractor shall remove and dispose 12" of the unsuitable subgrade and replace with a layer of Tensar Biaxial Geogrid and crushed aggregate base. This Change Order total amount was $ 15,120.00. Change Order #20. Unsuitable subgrade was discovered during excavation of the street section on the North side of 8th Street between A Avenue and C Avenue between stations 30+50 and 36+00. Southern California Soils and Testing (SCST) visited the site to give recommendations on a cost effective street section to pass compaction testing. Under the direction of the Engineer and per SCST Memorandum dated 5/19/14, the Contractor shall place 1 layer of Geogrid TX5 with at least 6 inches of Aggregate Base. If the surface is still yielding another layer of geogrid shall be placed. Aggregate base is paid under line item 52. This Change Order total amount was $ 8,120.70. Change Order #21. To reduce the potential for reflective cracking it was recommended per Ninyo & Moore's memorandum dated 4/24/14 to place a layer of Tensar Glasgrid on top of the existing concrete prior to placement of the AC overlay. The contractor proceeded under the direction of the Engineer and installed approximately 18,531 SF of Glasgrid 8501 on 8th Street between National City Boulevard and B Avenue. This Change Order total amount was $ 14,593.16. Change Order #22. 6"-8" of concrete pavement was discovered beneath the asphalt along all of 8th Street from National City Boulevard to Highland Avenue outside the indicated areas on the plans. Concrete had to be removed to make the required grades. The original concrete pavement removals shown on the plans are 24,322 SF. Under direction of the Engineer the total concrete removed for this change order is 34,378 SF and is illustrated on the attached documents, exceeding the original contract amount by 10,056 SF. This Change Order total amount was $ 30,168.00. Change Order #23. A water service line was discovered within the planter area at the Southwest corner of C Avenue and 8th Street and needs to be relocated below the planter grade to not be in conflict with the new improvements. The attached price is for the Subcontractor only. This Change Order total amount was $ 3,454,50. Change Order #24. The following changes are from the Electrical Redesign: delete Line Item 91, 94, 96, 97 and 99. Create line Items 91A "Install #3 Pull box", 91B "Install #5 Pull box", 97A "Install #10 THW Wire (Sr, 97B "Install #8 THW Wire (S)", 97C "Install Low Voltage Wire (Sr, 99A " Install #10 CU Ground Wire (Sr, 99B "Install #8 CU Ground Wire (Sr, 100 "Install Light Controller", 101 "Install 15A Circuit Breaker", 102 "Install Time Clock 15A 2P Lighting -6- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 Contactor", 103 "Install Time Clock 15A 6P Lighting Contactor", and 104 "Install Time Clock 15A 12P Lighting Contactor". For units, quantities and prices please refer to Attachment "A." This Change Order total amount will be reflected in the line items. Change Order #25. Curb and Gutter had to be redesigned between B and C Avenue to accommodate an SDGE box not being adjusted. The curb and gutter from station 33+90 to 34+70 had to be moved back 1 foot to make the required grades due to SDG&E's inability to relocate the box. The Contractor proceeded under the direction of the Engineer. This Change Order total amount was $ 1,311.00. Change Order #26. Unforeseen conditions have been discovered throughout the project for which change orders have been previously issued to account the differences in costs and some changes have not required change orders. Many of these changes have increased the number working days required to complete the project. The City has also allowed street closures in both a singular and dual directions and allowed certain street sections to remain to reduce contract time. This change order addresses all contract time issues up to the date of its execution. All of the cost issues have been addressed in previous change orders and in adjustments to line items. This Change Order resulted in a time only change order adding 35 Working Days to the Contract in the amount off $ 0.00. Change Order #27. The Strongbox backflow enclosures SBBC-30SS did not fit over the backflow devices as designed and had to be upgraded to the larger enclosures SBBC-45SS. The SBBC-30SS was specifically called out in the plans and was an approved submittal. This Change Order total amount was $ 1,174.82. Change Order #28. To provide a uniform finish and look the City Engineer directed the Contractor to proceed with additive item A-10 "Procure and Install Palm Trees (Syg Rom) between D and Highland." The plans state that any Palm Trees installed East of D Avenue along 8th Street to be additive item A-10. This Change Order total amount was $ 28,500. Change Order #29. To reduce the potential for reflective cracking it was recommended per Ninyo & Moore's memorandum dated 4/24/14 to place a layer of Tensar Glasgrid on top of the existing concrete prior to placement of the AC overlay. The contractor proceeded under the direction of the Engineer and installed approximately 51,975 SF of Glasgrid 8501 on 8th Street between D Avenue and Highland Avenue. This Change Order total amount was $ 40,930.31. Change Order #30. Three Service Meter Pedestals along 8th Street failed SDGE Inspection and required Bollards to be installed at these locations. The Meter Pedestals were too close to the travel lane and raised a safety concern that required Bollards per SDGE Specifications. These locations were 201 1/2 W 8th St, 411 1/2 E 8th St, and 616 1/2 E 8th Street. This Change Order total amount was $ 2,802.45. -7- FINAL CONTRACT BALANCE 8'h Street Smart Growth Specification No. 12-13 Change Order #31. The Contractor installed 4 street light base plates per contract plans for Type C Poles, however, the plans were incorrect and the base plates did not work for the Type C Poles. Instead of getting new base plates these could be modified to fit the Type C Poles. This Change Order total amount was $ 1,863.56. Change Order #32. To reduce the potential for reflective cracking it was recommended per Southern California Soil & Testing report dated 6/19/14 to place a layer of Tensar GlasPave50 on top of the existing concrete prior to placement of the AC overlay. The contractor proceeded under the direction of the Engineer and installed approximately 13,515 SF of GlasPave50 on 8th Street between B Avenue and D Avenue. This Change Order total amount was $ 5,676.30. Change Order #33. To reduce the potential for reflective cracking it was recommended per Ninyo & Moore's memorandum dated 4/24/14 to place a layer of Tensar Glasgrid on top of the existing concrete prior to placement of the AC overlay. The contractor proceeded under the direction of the Engineer and installed approximately 3,270 SF of Glasgrid 8501 on 8th Street between D Avenue and Highland Avenue. This Change Order total amount was $ 2,452.50. Change Order #34. Sidewalk panels within the project limits from National City Boulevard to the MTS crossing were in bad condition and did not meet ADA standards. Under the direction of the Engineer the Contractor proceeded with removing and replacing 1,000 square feet of sidewalk. This Change Order total amount was $ 7,000. Change Order #35. The 2" grind and overlay would not be sufficient to repair the bad sections of asphalt along 8th Street between National City Boulevard and the MTS Crossing. To provide a sound street section the City Engineer directed the Contractor to proceed with additive item A- 1 "Deep Lift 8" AC Pavement Removal and Replacement." This Change Order total amount was $ 100,000.00. Change Order #36. The Soil adjacent to the concrete inlets within the planters was being eroded because of the elevation difference and flow of water. To fix this issue the Contractor shall procure and install Mexican Sunburst Cobble on top of the concrete inlet and place a cluster of cobbles at the outlet of the planters. This Change Order total amount was $ 21,593.94. Change Order #37. For maintenance purposes the City Engineer directed to remove all plants within the medians. To replace the plants within the medians the Contractor shall procure and install fabric, boulders and decomposed granite. This Change Order total amount was $ 31,607.43. Change Order #38. To improve the overall pedestrian path on the North side of 8th Street between the 1-5 Bridge and MTS Crossing the City Engineer directed that the Contractor shall remove 19 tree wells and replace with concrete sidewalk. This price also includes the removal -8- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 and stump grind of 10 Trees within the tree wells. This Change Order total amount was $ 9,765.00. Change Order #39. 6"-8" of concrete pavement was discovered beneath the asphalt along all of 8th Street from National City Boulevard to Highland Avenue outside the indicated areas on the plans. Concrete had to be removed to make the required grades. Under direction of the Engineer the total concrete removed for this change order is 36,171 SF and is illustrated on the attached documents. This Change Order total amount was $ 108,513.00. Change Order #40. A concrete tree grate and frame had to be demolished adjacent to the new improvements on the NW corner of 8th Street and B Avenue. The Contractor shall procure and install decomposed granite within the Tree well with protecting the existing Tree with a PVC ring. This Change Order total amount was $ 750.00. Change Order #41. The D-25 curb outlet located at 133 West 8th Street had been damaged and needs to be replaced. The contractor shall remove and replace the D-25 curb outlet with an additional support bolt from SDRSD D-12. This Change Order total amount was $ 2,700.00. Change Order #42. To improve the overall asphalt surface on 8th Street between National City Boulevard and the MTS crossing the City Engineer directed Type 2 Rubberized Emulsion Aggregate Slurry (REAS) be placed. This Change Order total amount was $ 2,700.00. Change Order #43. Per Bulletin #2, raising the soil to satisfy the new design required all trees and irrigation (irrigation control valves, ICV Boxes and sprinkler heads) to be raised for planter areas already installed. The Contractor proceeded under the direction of the Engineer. This Change Order total amount was $ 18,077.54. Change Order #44. The original plans called for Desert Gold decomposed granite to be installed at the NE corner of D Avenue, to match the median decomposed granite the plans were revised to have Amber Cloud DG placed. This change order covers the cost for the difference in materials. This Change Order total amount was $ 654.38. Change Order #45. Additional amendments were added to Topsoil A per recommendations from KTUA and Wallace Laboratories. This Change Order covers the additional costs for the amended topsoil. This Change Order total amount was $ 940.13. Change Order #46. Idle time due to NCPD shutdown due to no noise permit for the work in front of Big Ben's Market entrance. Contractor requested work start at 5:00am to accommodate Big Ben's Market and the City approved the early start but still got shut down by NCPD. This Change Order total amount was $ 2,026.45. -9- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 Change Order #47. Plans called for an A-4 cleanout to be installed at the end of the Storm Drain run on the south side of 8th Street near National City Boulevard. After review of the Plans the Engineer directed a standard cleanout per SDRSD SC-01 be installed. The Contractor proceeded under the direction of the Engineer. This Change Order total amount was $ 2,000.00. Change Order #48. Unsuitable subgrade was discovered during excavation of the street section per attached plans. Southern California Soils and Testing (SCST) visited the site to give recommendations on a cost effective street section to pass compaction testing. Under the direction of the Engineer and per SCST Memorandum dated 5/19/14, the Contractor shall place 1 layer of Geogrid TX5 with at least 6 inches of Aggregate Base. If the surface is still yielding another layer of geogrid shall be placed. Aggregate base is paid under line item 52. This Change Order total amount was $ 10,482.57. Change Order #49. At the pedestrian island refuge crosswalk near the MTS Tracks a separate pedestrian push button post was required to meet ADA standards for the Pedestrian Flasher System installed at the crosswalk. This Change Order total amount was $ 3,381.71. Change Order #50. 6"-8" of concrete pavement was discovered beneath the asphalt along all of 8th Street from National City Boulevard to Highland Avenue outside the indicated areas on the plans. Additional sawcutting through the 6-8" of concrete pavement was required for the installation of the storm drain on the North and South sides of 8th Street. The total linear foot of sawcutting required for the storm drain trench was 9160. The calculated LF price for additional sawcutting was $2.19 per LF creating a total cost of $20,060.40. This Change Order total amount was $ 20,060,40. Change Order #51. This change order provides a deduction to Change Order #7 for not procuring the Projector Lights. The City did not proceed with the art element under the bridge therefore the projector lights and additional LED Lights were not necessary. This Change Order total amount was $ (33,680.41). Change Order #52. Due to unforeseen utility delays with SDGE and AT&T power poles and previously mentioned change orders additional days will be added to the Contract. This Change Order resulted in a time only change order adding 164 Working Days to the Contract in the amount of $ 0.00. All Change Orders listed above increased the total contract Working Days by 199. All Change Orders listed above increased the total contract amount $ 1,374,112.20. Original Contract Amount= $ 3,709,079.35 Change Order Totals = $ 1,374,112.20 New Contract Amount = $ 5,083,191.55 Final Contract Balance = $ 4,830,889.17 -10- FINAL CONTRACT BALANCE 8th Street Smart Growth Specification No. 12-13 Contract Savings from line item adjustments = $ 252,302.38 (New Contract Balance — Final Contract) $ 707,779.09 was for purchase of Street Lights which were originally to be purchased through the City. Change order amount without Street Lights :_ $666,343.11 $ 252,302.38 project savings reduces the change orders to $414,040.73 $ 556,362 Project Contingency $ 142,321.27 Contingency Remaining CONTRACT ADJUSTMENT: As a result of the above change orders and line item adjustments, the contract price is adjusted as follows: 1. The final contract price is adjusted to $ 4,830,889.17. 2. As a result of the satisfactory completion of said project, a retention amount of $ 241,544.52 has been released. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, took and equipment, profit, overhead, and all incidentals for performing the work described above. PAL General Engineering Inc. will not be entitled to damages or additional payment for delays as described in the 2012 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. -11- RESOLUTION NO. 2016 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK OF PAL GENERAL ENGINEERING, INC., FOR THE 8' STREET SMART GROWTH REVITALIZATION PROJECT, APPROVING THE FINAL CONTRACT AMOUNT OF $4,830,889.17, RATIFYING RELEASE OF RETENTION IN THE AMOUNT OF $241,544.52, AND THE FILING OF A NOTICE OF COMPLETION FOR THE PROJECT WHEREAS, the Engineering Department is satisfied of that all work required to be performed by PAL General Engineering, Inc., for the 8th Street Smart Growth Revitalization Project has been completed; and WHEREAS, the Notice of Completion was filed with the San Diego County Recorder's Office on September 16, 2015. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National City that the work performed PAL General Engineering, Inc., for the 8th Street Smart Growth Revitalization Project is accepted, the total final contract amount of $4,830,889.17 is approved, and payment for said work is ordered to be made in accordance with said contract. BE IT FURTHER RESOLVED that the City Council ratifies the filing of the Notice of Completion and the release of retention in the amount of $241,544.52. PASSED and ADOPTED this 17th day of May, 2016. Ron Morrison, Mayor ATTEST: Michael R. Dalla, City Clerk APPROVED AS TO FORM: Claudia Gacitua Silva City Attorney CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk PAL GENERAL ENGINEERING Notice of Completion 8th Street Smart Growth Revitalization Judy Hernandez (Engineering/Public Works) Forwarded Copy of Notice of Completion to PAL General Engineering