Loading...
HomeMy WebLinkAbout2014 CON Portillo Concrete - Highland Avenue Safety Enhancements Project - Change Order #2+*-. CALIFORNIA ^{ NATIONAL CITY awy INCORPORATED • HIGHLAND AVENUE SAFETY ENHANCEMENTS Specification No. 13-07 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 2 April 8, 2014 Reason/Purpose for this Change Order: Southbound Highland approaching 8th Street had to be restriped to one lane to accommodate the turning radius of the MTS buses turning right onto 8th Street. Under the direction of the Engineer the Contractor proceeded with the work. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall restripe Southbound Highland approaching 8th Street to one lane to accomodate the turning radius of the MTS Buses. The lump sum change order price includes all labor, materials, and equipment required to complete this work. The agreed upon price for all costs associated with this work is as stated on this Change Order. Original Contract Amount $ 1,379,220.00 2,297.02 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 1, 381, 517.02 3,197.25 Percent change in Contract to date 0.40% 1,384,714.27 Submitted by: Pr c1M---'1V t Man er Date P ' Resi ent Engineer 412-lb r Date Approved by: 2..... City ngineer • � �-i t it Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and reto by Portillo Concrete, Inc.: Name: V.1-1s Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 \'I CALIFORNIA &1T9Lcfl'v INCORPORATED /1 HIGHLAND AVENUE SAFETY ENHANCEMENTS Specification #13-07 CHANGE ORDER NO. 2 DATE: April 8, 2015 WORK PERFORMED BY: Portillo Concrete, Inc. DESCRIPTION OF WORK: Restripe of Southbound Highland approaching 8th to one lane ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Rate Total 1) 2) Remove D-9 Skip Stripe by Waterblasting LF 550.00 3.00 1,650.00 3) 4) Detail 27B 4" Right Edgeline Type VI Lane Drop Arrow T-Stalls LF EA EA 250.00 3.00 5.00 1.00 100.00 10.00 250.00 300.00 50.00 5) Roadside Sign (Various Designations) EA 3.00 265.00 795.00 Sub -Total: Prime Contractor Markup (5%): TOTAL COST: $ 152.25 $ 3,197.25 $ 3,045.00 c' s; y.i sA= £ RATED A CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk PORTILLO CONCRETE Change Order #2 Highland Avenue Safety Enhancements Project Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Portillo Concrete