HomeMy WebLinkAbout2016 CON New Century Construction - "D" Ave and E 12th St Roundabout SP 15-02 - Change Order #14 through #39*►» CALIFORNIA ►�* NATIONAL CITY t I1ao? D INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. CHANGE ORDER NO. 14 January 5, 2016 Reason/Purpose for this Change Order: Additional landscaping and irrigation around the war memorial was added to the Contract for drought characteristics and to enhance the overall appearance to coincide with other landscaping project improvements around National City. The Contractor proceeded with the additional landscaping and irrigation per Kimley-Horn's Plan Sheet. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with additional landscaping and irrigation per Kimley-Horn's Plan sheet. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 84,464.12 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 1, 580, 353.12 46,331.88 Percent change in Contract to date 8.74% 1,626,685.00 Submitted by: Pyject Ma ger r 4 Date Ap roved by: C. Engineer 9 av cb =, slat) 1) II -.� City Manager, required for Change Orders >$24,999 Date By ning this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and reed o by New Century Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 1 t ( CALIFORNIA NATIONAL C j(' i'y r...-� Ce e Cej �---� aee(/ INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT CHANGE ORDER NO.14 Specification #15-02 DATE: August 14, 2015 WORK PERFORMED BY: Koch -Armstrong DESCRIPTION OF WORK: Revised Landscaping Plan per Kimley-Horn ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) 2) 3) 4) Remove and dispose existing grass Import, place, compact topsoil Place and compact 3" Stabilized DG 8"-12" Mexican Sunburst SF SF SF SF 900.00 2,000.00 1,800.00 185.00 0.93 1.37 4.10 48.20 837.00 2,740.00 7,380.00 8,917.00 5) 6) 7) 1"-1.5" Mexican Sunburst SF 210.00 16.40 3,444.00 8) 9) 10) 11) 12) 13) 14) 15) 3'-4' Baja Cresta Boulders 2'-3' Baja Cresta Boulders Modify and install Irrigation Plant Agaves (15 Gal) Plant Hedgehog Agaves (15 Gal) Plant Kangaroo Paw (5 Gal) Plant Afterglow Hens and Chicks (5 Gal) Plant Torchillies (5 Gal) Plant Blue Chalksticks (5 Gal) Lay Marathon Fescue Sod EA EA LS EA EA EA EA EA EA SF 3.00 6.00 1.00 7.00 9.00 6.00 3.00 6.00 5.00 2,000.00 808.90 457.80 3,680.00 226.10 256.90 180.20 309.40 173.90 161.30 2.10 Sub -Total Labor: Prime Contractor Markup (5%): GRAND TOTAL: 2,426.70 2,746.80 3,680.00 1,582.70 2,312.10 1,081.20 928.20 1,043.40 806.50 4,200.00 $ 44,125.60 $ 2,206.28 $ 46,331.88 CALIFORNIA .* NATIONAL CITY �:.3:;!.31.( INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: The original war memorial design did not account for installation of the refurbished large offsets, flag poles and newly fabricated offsets. With redoing the entire memorial wall the City did not want to place old products onto a new wall. The Contractor shall proceed with the installation of (3) flag poles, (3) large offsets, and (12) small offsets and any additional items requested by the City for the war memorial listed in the attachment. CHANGE ORDER NO. 15 January 12, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with the installation of (3) flag poles, (3) large offsets, and (12) small offsets and any additional items requested by the City for the war memorial listed in the attachment. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal 1,626,685.00 Amount of this change order 21,714.00 1,495,889.00 130,796.00 New contract amount $ 1,648,399.00 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 10.20% Submitted by: ject Ma �•er Approved by: i /'Z6 /16 "1 Date r / /� En ineer / � Date lCCCjy Manager,rea iredforChangeorders .s24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acc Pted and air cJito b New Century Construction, Inc.: Name: Note to Contractor: If you do not agree with this Change Order you may and you may proceed under protest. You must comply with the contract Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 _ _ Date be directed to proceed with this work under the terms of the contract requirements of submitting a written protest to protect your claim. cc: Engineering project file, Project Manager Telephone (619-) 336-4380 CALIFORNIA NATIONAL Cit y INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT CHANGE ORDER NO.15 Specification #15-02 DATE: January 12, 2016 WORK PERFORMED BY: Restoration Artechs DESCRIPTION OF WORK: Additional items requested by City for War Memorial ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) 2) 3) 4) Pole stops fabricated and welded to offsets Correct grain pattern finish on offsets Core granite and concrete (76 holes) to mount (15) offsets and (5) bronze plaques Installation of flag poles with crane LS LS LS LS 1.00 1.00 1.00 1.00 2,150.00 2,610.00 14,250.00 1,670.00 2,150.00 2,610.00 14,250.00 1,670.00 $ 20,680.00 Sub -Total: Prime Contractor Markup (5%): GRAND TOTAL: $ 1,034.00 $ 21,714.00 D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: Due to the steep grade of the decomposed granite parkway, concrete mow curbs had to be installed to prevent the decomposed granite from migrating. Under the direction of the Engineer the Contractor proceeded under T&M with installing concrete mow curbs. CHANGE ORDER NO. 16 February 10, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with installing concrete mow curbs within the decomposed granite parkway. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders 1,495, 889.00 152,510.00 Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: Pro ct Man Approved by: 1,648,399.00 1,621.40 Percent change in Contract to date 10.30% 3/ZA/l6 Date ....... 1,650,020.40 Date [City Manager, required for Change Orders >$24 999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and weed to b% New Century Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1143 National City Boulevard;Nationa7City, CA 91950 Telephone (619) 336-4380 CALIFORNIA meoRnoRATED D AVENUE AND E 12TH STREET ROUND -A -BOUT CHANGE ORDER NO.16 Specification #15-02 DATE: November 12, 2015 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Install concrete mow curbs in DG parkway ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer - Canditho Perez Hour 7.50 57.85 433.88 2) Laborer - Balta Jurez Hour 4.50 57.85 260.33 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): $ 694.21 $ 83.31 $ 155.50 TOTAL LABOR: 93302 MATERIALS Unit Qty Rate Total 1) Concrete EA 2.50 125.00 312.50 $ 312.50 $ 46.88 EQUIPMENT Unit Qty Rate Total 1) Generator Hour 7.00 11.00 77.00 2) 3) 4) 5) Lumber Truck Hour 4.50 21.50 96.75 Demo Saw Hour 4.50 15.63 70.34 Wacker Hour 2.50 10.80 27.00 Rotor Hammer Hour 2.50 6.00 15.00 $ 286.09 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: 42.91 GRAND TOTAL: $1,621.40 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: CALIFORNIA NfriN(10:17.33A114Ciry INCORPORATtD —' D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: The elevations of the memorial seat wall were adjusted and did not match the elevations of the existing mow curb for the memorial planter and had to be redone. Under the direction of the Engineer the Contractor proceeded under T&M with installing concrete mow curbs within the memorial planter. CHANGE ORDER NO. 17 February 10, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with installing concrete mow curbs for the memorial planter. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 154,131.40 1,650,020.40 2,278.09 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 10.46% Submitted by: 1,652,298.49 Date City Mana er, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and a reed to by New Century Construction, Inc.: 3 2 l / Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, Nationanity, CA 91950 TeTephone Z619) 336-4380 CALIFORNIA -= I 1 nary INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 CHANGE ORDER NO.17 DATE: 11/12/15, 11/13/15 and 11/19/15 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Install concrete mow curbs for memorial planter ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) Laborer - Canditho Perez Hour 10.00 57.85 578.50 2) Laborer - Balta Jurez Hour 5.00 57.85 289.25 3) Laborer - Eric Gonzalas Hour 5.00 55.57 277.85 4) Carpenter - Canditho Perez Hour 2.00 57.85 115.70 5) Mason - Canditho Perez Hour 2.50 55.57 138.93 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 1,400.23 $ 168.03 $ 313.65 MATERIALS Unit Qty Rate Total 1) N/A Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 9' tUIP E Unit Qty Rate Total 1) Generator Hour 10.00 11.00 110.00 2) Lumber Truck Hour 7.00 21.50 150.50 4) Wacker Hour 5.00 10.80 54.00 5) Rotor Hammer Hour 5.00 6.00 30.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 344.50 $ 51.68 $ 396.18 GRAND TOTAL: $2,278.09 D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: Additional grading was required past the project limits at the SW corner of D Ave and 12th Street. This additional work also included redoing a box inlet with the parkway. Under direction of the Engineer the Contractor ,proceeded under T&M to grade the SW corner of D Ave and 12th Street. CHANGE ORDER NO. 18 February 11, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with additional grading at the SW Corner of D Ave and 12th Street. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal 1,652,298.49 Amount of this change order 3,908.54 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 10.72% i Submitted by: 156,409.49 Pro Approved by: 5/ Y/16 ...... Date 1,656,207.03 Date City Manager required for Change Orders 424999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. sAcceptedand agreed to by New CenturyConstruction, Inc.: 7/Z( /1c `Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telep one j610TAT6 4380 CALIFORNIA INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: 11/19/15 and 11/20/15 CHANGE ORDER NO.18 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Additional grading at the SW corner of D Ave and 12th St. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer - Chris Caramen Hour 15.50 57.85 896.68 2) Laborer - Paul Shipley Hour 9.00 57.85 520.65 3) Operator - Raymundo Silva Hour 9.00 55.57 500.13 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 1,917.46 $ 230.10 $ 429.51 $ 2,577.07 ATE RIALS Unit Qty Rate Total 1) Concrete EA 10.00 6.00 60.00 1) Trench Drain LS 1.00 572.62 572.62 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 572.62 $ 85.89 658.51 EQUIPMENT Unit Qty Rate Total 1) 710 Backhoe Hour 2.00 81.88 163.76 2) 334 EX Hour 6.00 34.32 205.92 3) Compressor/ Jackhammer Hour 2.00 18.75 37.50 4) Generator Hour 14.00 11.00 154.00 5) Rotor hammer Hour 4.00 6.00 24.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 585.18 $ 87.78 GRAND TOTAL: $3,908.54 H•DSUPPLY ON ACCOUNT CONSTRUCTION & INDUSTRIAL WHITE CAP 036 - El Cajon 430 Raleigh Ave El Cajon, CA, 92020 (619) 590-2001 Sold To: 18307000 NEW CENTURY CONST 9119 EMERALD GROVE AVE LAKESIDE, CA, 92040 619-390-3300 RECEIPT Shipped amount Order charges Tax amount Lumber Tax rate/amount Order total Deposit/funds tendered Balance due i Ship To : i i i 18850082 INTERSECTION,10000824168 12TH STREET & D AVE. NATIONAL CITY, CA, 91950 Job Site Contact: Job Site Phone: Map #: 1.00% REPORT DISCREPANCIES WITHIN 24 HRS. IF YOU DIDNT RECEIVE THE SERVICE YOU EXPECTED CALL BOB JACOBY (949) 794-5272 NO REFUNDS OR EXCHANGES ON NON STOCK MERCHANDISE SEE REVERSE SIDE FOR TERMS AND CONDITIONS WWW.WIIITECAP.CON1 i II iu $527.76 $0.00 $44.86 $0.00 $572.62 $0.00 $572.62 PRINT: SIGN : SHIPPED WEIGHT: 207.82 LBS PULLED BY: CHECKED BY: LOADED BY: WARNING: These products contain chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. Page 2 of 2 INDSUPPLY ON ACCOUNT CONSTRUCTION & INDUSTRIAL WHITE CAP 036 - El Cajon 430 Raleigh Ave El Cajon, CA, 92020 (619) 590-2001 Sold To: 18307000 NEW CENTURY CONST 9119 EMERALD GROVE AVE LAKESIDE, CA, 92040 619-390-3300 Printed By : JAMI VAUGHN Tinted Dale : I I/19/2015 06:17 AM PACIFIC RECEIPT Ordered By: VICTOR LIND 32 II i i u i 18850082 i Ship To : INTERSECTION,10000824168 12TH STREET & D AVE. NATIONAL CITY, CA, 91950 Job Site Contact: Job Site Phone: Map #: Contact Phone: i i Order Number Order Date Request Date Invoice Date Salesperson 18850082 11/19/2015 11/19/2015 Terms Shipping Method Customer PO Created By N3OD 5. Walk In Vaughn. J LN Part# Description Quantity UOM Price Amount BIN H/M LOT/SN ORD SHP BKO Unit WT COO 1.1 1-C1304 39074021 VPN: 74021 KI-21 SLOPED CHANNEL - GALVANIZED (l M) ACO 1 I 0 EA 44.2 LBS 584.59 584.59 2.1 1-C 1304 39074022 VPN: 74022 KI-22 SLOPED CHANNEL - GALVANIZED (1 M) ACO I I 0 EA 45 LBS S84.59 S84.59 3.1 1-C1304 39074023 VPN: 74023 K1-23 SLOPED CHANNEL - GALVANIZED (I M) ACO 1 I 0 EA 45.8 LBS 584.59 $84.59 4.1 1-C 1304 39074024 VPN: 74024 K 1-24 SLOPED CHANNEL - GALVANIZED (I M) ACO 1 1 0 EA 46.6 LBS $84.59 $84.59 5.1 I -C 1203 3900420Q VPN: 31530 I M G420Q QUICKLOK QL GALVANIZED SLOTTED GRATE ACO 4 4 0 EA 5.5 LBS 522.39 589.56 6.1 1-C1204 39096822 VPN: 96822 UNIVERSAL END CAP - KI00 SERIES ACO ► I 0 EA .4 LBS $10.69 $10.69 7.1 1-C1204 2-C1205 390QLB VPN: 02899 QUICKLOK BAR SOLD/EACH ACO 4 4 0 EA .1 LBS $6.79 S27.16 8.1 I-BG0304 162HS 1822 VPN: HSI822 4-1/2" X16" ROTARY HAMMER SPLINE CLAY SPADE BOSCH 1 1 0 EA 3.42 LBS 561.99 S61.99 Page 1 of 2 NATI IT 'NCORFORATE D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: Additional repairs to the memorial area were requested by the City, these repairs consisted of removing and replacing a floor drain and additional concrete repairs/ patching. Under direction of the Engineer the Contractor 'proceeded underT&M with the above mentioned items. CHANGE ORDER NO. 19 February 12, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with repairs within memorial area. The (agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" ;for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 160, 318.03 1,656,207.03 3,312.80 New contract amount $ 1,659,519.83 Working days added: 0 Working days subtracted: 0 Submitted by: ct Man-Ger Date Approved by: Percent change in Contract to date 10.94% CltynDate City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by New Century Construction, Inc.: 7/2///� Name: __- Date Note to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Bouievar=o, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA mcoRPottArED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: 12/3/15 and 12/4/15 CHANGE ORDER NO.19 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Additional repairs to memorial area ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) Laborer - Canditho Perez Hour 1.00 57.85 57.85 Laborer - Balta Jurez Hour 1.00 57.85 57.85 3) Laborer - Marvin Dupree Hour 5.50 57.85 318.18 4) 5) 6) 7) Laborer - Victor Lind Carpenter - Carl Brown Operator - Raymundo Silva Hour Hour Hour 8.00 11.50 2.00 57.85 67.76 71.77 462.80 779.24 143.54 Laborer - Lee Shellberg Hour 1.50 57.85 86.78 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 1,906.24 $ 228.75 $ 427.00 ,56 MATERIALS Unit Qty Rate Total 1) Concrete LS 1.00 300.00 300.00 2) 3) Frame and Grate Concrete Bags LS EA 1.00 10.00 96.13 6.00 96.13 60.00 $ 456.13 $ 68.42 99 T Unit Qty Rate Total 1) Lumber Truck Hour 2.50 19.70 49.25 2) Generator Hour 11.50 11.00 126.50 3) Rotor Hammer Hour 3.50 6.00 21.00 $ 196.75 $ 29.51 226.26 GRAND TOTAL: $3,312.80 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: South Bay n nc 9444 Abraham Way Santee, CA 92071-2853 Phone: (619) 596-3825 Fax: (619) 596-3715 Invoice Page: 1 Phoenix Iron Works Invoice Number: 0157779-IN Invoice Date: 12/4/2015 Order Number: 0134651 Order Date: 12/2/2015 Customer Number: 01-NEW300 Sold To: Ship To NEW CENTURY CONSTRUCTION 9119 EMERALD GROVE AVE. LAKESIDE, CA 92040 ATLCIT' D&12TI-I I. D. Number E1120G E1110G WC Description 18 X 18 H NT. GRATE GALV. 18 X 18 H NT.FRAME GALV. Civ et 37 vci NEW CENTURY CONSTRUCTION WILL CALL @ SBF SANTEE, CA 92071 Unit EACH EACH aG,v1 NET 30 Shipped . Back Ordered Price 1 1 0 0 Net Invoice: Freight: Sales Tax: Invoice Total: 59.00 30.00 Amount 59.00 30.00 89.00 0.00 7.13 96.13 CALIFORNIA Ciry ItirCORPOTtATED '— D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: An additional coat of paint to the memorial wall was requested by the City. Under direction of the Engineer the Contractor proceeded under T&M with applying an additional coat of paint to the memorial wall. CHANGE ORDER NO. 20 February 12, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with applying an additional coat of paint to 'the memorial wall. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 163,630.83 1,659,519.83 2,095.01 New contract amount $ 1,661,614.84 Working days added: 0 Working days subtracted: 0 Submitted by: 'Pro Approved by: Percent change in Contract to date 11.08% Date ,/.ol/l City, ng_ineer / Date City Manager, required for Change Orders >$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to b New Centu Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 NatiodaTtity Boulevard, National City, CA 91950 Tere-0 one 619 336-4380 CALIFORNIA AllONAL CITY 114-31 INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: 12/5/15 and 12/6/15 CHANGE ORDER NO.20 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Applying a coat of paint to the memorial wall ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT EO Unit Qty Wage Total 1) 2) Laborer - Chris Carrmasc (OT) Laborer - Carl Brown (OT) Hour Hour 15.50 8.00 61.78 61.78 957.59 494.24 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 1,451.83 $ 174.22 $ 325.21 MATER%1 Unit Qty Rate Total 1) Paint GAL 5.00 25.00 125.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 125.00 $ 18.75 EQUIPM Unit Qty Rate Total 1) N/A Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ GRAND TOTAL: $ 2,095.01 CALIFORNIA I AI.ON ia•1 1 INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. CHANGE ORDER NO. 21 February 29, 2016 Reason/Purpose for this Change Order: Sidewalk, curb/gutter, and driveway adjacent to the project needed to be removed and replaced to meetADA standards. This work also included removing two trees that were raising the sidewalk. Under direction of the Engineer the Contractor proceeded with removing and replacing the sidewalk, curb/gutter and driveway. The City of National City and Contractor agree to the following to on i l change the original Contract: The Contractor and the City agree that the Contractor shall proceed with removing and replacing sidewalk, curb/gutter and driveway. The agreed upon price for all costs associated with this work is as stated on this ;Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 165,725.84 1,661,614.84 18, 550.00 New contract amount $ 1,680,164.84 Working days added: 0 Submitted by: Pr•./ ct Mana :Approved by: Cita/Engineer Working days subtracted: 0 Date Percent change in Contract to date 12.32% Date City Manager, required for Change Orders $24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. ccepted and agreed to by, New C nt ry Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City BoufevarlL Natfonaf City, CA 91950 _._ feejihone (619) 33b-4380 CALIFORNIA INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: February 29, 2016 CHANGE ORDER NO.21 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Remove and replacing sidewalk, curb/gutter and driveway. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 4" sidewalk R&R at 7 separate locations for a total of 900 SF LS 1.00 12,250.00 12,250.00 2) 80 LF of Curb and Gutter LS 1.00 3,500.00 3,500.00 3) Driveway R&R LS 1.00 1,750.00 1,750.00 4) Remove pepper tree and grind stump and grind additional stump LS 1.00 1,050.00 Sub -Total: 1,050.00 $ 18,550.00 GRAND TOTAL: 8,550,00 D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. CHANGE ORDER NO. 22 February 29, 2016 Reason/Purpose for this Change Order: South of the 12th Street and D Avenue intersection the asphalt street section was failing due to a bus route and needed to be removed and replaced with a bus pad to prevent further damage. Under direction of the Engineer the Contractor proceeded with the installation of a 80'x10' bus pad. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with the installation of a 80'x10' bus pad South of the 12th Street and D Avenue intersection. The agreed upon lump sum price for all costs associated with this work is as stated on this Change Order. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 184,275.84 1,680,164.84 14,900.00 New contract amount $ Working days added: 0 Submitted by:� P Approved by: Percent change in Contract to date 13.31% 1,695,064.84 Working days subtracted: 0 Vu/A ..................Date Cit n Ineer Date City Mana er,requiredforChangeOrders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by New Century Construction Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 Nations City Bou evard, Nat onaTCity, CA 91950 Te ep one M-316:4580 CALIFORNIA Not NAL eiry a`ef --- iscoRPORATT1p D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. CHANGE ORDER NO. 23 March 14, 2016 Reason/Purpose for this Change Order: Pedestrian bollards and chains were installed on the East side of the Roundabout. Under direction of the Engineer the Contractor proceeded with the procurement and installation of pedestrian bollards and chains. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with the procurement and installation of pedestrian bollards and chains on the East side of the Roundabout. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 199,175.84 1,695,064.84 19, 845.71 New contract amount $ 1,714,910.55 Working days added: 0 Working days subtracted: 0 Submitted by: P ct Mana Approved by: 312J'/1'6 Date .. Percent change in Contract to date 14.64% City ngineer / Date City,Manager, required for Change orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to at equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agree by New Century Construction Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager -1243 Nations fty Bou evara, National City, CA 91950 mm TeleplioneT619 36-4380 CALIFORNIA A � )'" _A�L ` JTi,r( 1301 arcoonportATEv D AVENUE AND E 12TH STREET ROUND -A -BOUT CHANGE ORDER NO.23 Specification #15-02 DATE: March 14, 2016 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Procure and install pedestrian bollards and chains ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Installation (Core sidewalk, install bollard anchors, piece together bollards and connect chains) LS 1.00 4,800.00 4,800.00 Sub -Total Labor: $ 4,800.00 TOTAL LABOR: MATERIA Unit Qty Rate Total 1) Reliance Foundry R-7530 Bollard (Black Powder Coat) EA 13.00 974.00 12,662.00 2) 5/16 Black Powder Coat Chain LF 75.00 10.75 806.25 Sub -Total Materials: Sales Tax: Freight: TOTAL MATERIALS: $ 13,468.25 $ 1,077.46 $ 500.00 4r800 5i" EQUIP T' Unit Qty Rate Total 1) N/A Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: GRAND TOTAL: $19,845.71 South Hdu Founr 9444 Abraham Way Santee, CA 92071-2853 Phone: (619) 596-3825 Fax: (619) 596-3715 Inc Quote Page: 1 Phoenix Iron Works Quote Number: 0135235 Quote Date: 2/18/2016 Salesperson: AMANDAANDERSON Sold To: Ship To: NEW CENTURY CONSTRUCTION 9119 EMERALD GROVE AVE. LAKESIDE, CA 92040 Confirm To: NEW CENTURY CONSTRUCTION 9119 EMERALD GROVE AVE. LAKESIDE, CA 92040 Customer Number Ship VIA F.OB. Terms 01-NEW300 NET 30 Qty Item No / Description Price Disc Amount 13 75 /ST-MISC RELIANCE FOUNDRY R-7530 BOLLARD *BLACK POWDER COAT /ST-MISC 5/16 BLACK POWDER COAT CHAIN FROM RELIANCE FOUNDRY *PRICE PER FT PRODUCT SHIPPED FROM CANADA LEAD TIME APPROX 2-3 WEEKS QUOTE ONLY GOOD FOR 30 DAYS ALL ORDERS NON CANCELABLE 50% DEPOSIT REQUIRED TO PURCHASE MATERIAL FROM RELIANCE FOUNDRY 974.00 10.75 0.00 0.00 12,662.00 806.25 Net Order: Less Discount: Freight: Sales Tax: Order Total 13,468.25 0.00 500.00 1,077.46 15,045.71 219,021.55 1,714,910.55 5,295.00 Percent change in Contract to date 15.00% 1,720,205.55 CALIFORNIA -0- N `I H y ':31 NCORPOOBATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: Driveway at 924 D Avenue was holding water and creating a safety issue for drivers. Under direction of the Engineer the Contractor proceeded with the correcting the grades of the street section and driveway to create 'flow. CHANGE ORDER NO. 24 March 16, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with correcting the grades of the street section and driveway at 924 D Avenue to create flow. The agreed upon lump sum price for all costs associated with this work is as stated on this Change Order. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: Approved by: Cit gn ineer Date 'City Mana er,requiredforChangeOrders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by New Century Construction, Inc.: /621 /4 Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 Nation -al City Bou evar , National -City, CA 91950 mmm TeTepfione j6191336-4380 cAL NATI INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: ;Trees are required to be installed in the Bio-Retention boxes to meet the water quality managament plan. Under direction of the Engineer the Contractor proceeded with procuring and installing 24" box Desert Museum Palo Verde Trees. CHANGE ORDER NO. 25 March 16, 2016 The City of National City and Contractor agree to the following change to the original Contract: 'The Contractor and the City agree that the Contractor shall proceed with procuring and installing 24" box Desert Museum Palo Verde Trees. The price to procure and install is $550.00 each. 7 Trees for a total of $3.850.00. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by Approved by: 3/Mt Date City#Englneer / Date 224,316.55 1,720,205.55 3,850.00 $ 1,724,055.55 Percent change in Contract to date 15.25% City Manager required for Change Orders 424,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agree by New Century Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 Nations City Bou evar , NationaY ity, CA 91950 Te7e15Fi6neT619M614380 CALtFE1RN1A NATIO � .r re e j rATCORPORATED •-� D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. CHANGE ORDER NO. 26 March 16, 2016 Reason/Purpose for this Change Order: Per Kimley-horn's plan sheet for revised landscaping Hydroseed is to be installed on the Southeast corner of D Avenue and 12th Street. Under direction of the Engineer the Contractor proceeded with procuring and installing approx 1,200 SF of Hyrdoseed. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with procuring and installing approx 1,200 SF of Hyrdoseed at the Southeast corner of D Avenue and 12th Street. The agreed upon lump sum price for all costs associated with this work is as stated on this Change Order. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 228,166.55 1,724,055.55 1,449.00 New contract amount $ 1,725,504.55 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 15.35% Submitted by: Proct Mena•;' Approved by: Date r 3/4// ............... . Cit gn ineer Date CityManager, required for Change Orders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agretlodto by New Century Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 NatioriaTCity Boulevar 1, National City, CA 91950 Tehephone (6T9T 33f-4380 State lic. C-27 0473694 gr.,,,Aa t E C A WBE aCT-005616 HYDROSEEDINGI�& RESTORATION '�'" MEMBETR 1I111C1lIIfLtl11ellilll1,illlllllll111NillflllUlllMNlllll/111111l111UlllNNll/filllililtllll!llillllllllllll!lllli11111 IIIIIIIIIIJllllfillllllllllN1011lllIlllllNJllllll1111111111OM11(IINIIIUNIUtIII!lllllCU(IU11171111I TELEFAX BID: BID DATE: Dave Community Corrider — National City February 25, 2016 FIRM BIDDING: QUALITY HYDROSEEDING & RESTORATION Cynthia Poundstone 2013 ORANGE AVENUE Cell (760) 443-4396 RAMONA, CA 92065 (760) 789-8040 FAX (760) 789-5168 QUALIFICATIONS: C-27 LICENSE NO. 473694 EXPIRES 5/31/2017 Qualified UDBE/DBE Subcontractor CERTIFIED DBE-UCP Firm Number : 5616 - EXPIRES 8/30/2017 DIR#-100001.3519 Expires 6/01/2016 BID ITEMS: ITEM CODE ITEM UNIT OF MEASURE ESTIMATE QUANTITY UNIT PRICE ITEM TOTAL 1. Erosion Control Hydroseeding Lump Sum Approx 1,200 SF S1,380.00 S1,380.00 INCLUDES: Seed per seed Mix Chart @ 24 Lbs/Acre — Wood Fiber Mulch @ 2,000 Lbs/Acre — Stabilizing Emulsion a)100 Lbs/Acre — No Fertilizer INCLUSIONS: (1) TAX, DELIVERY & INSTALLATION (2) ONE MOBILIZATION INCLUDED...S200.00 for additional Move -In EXCLUSIONS: (1) PREWATERING OF SOIL (2) ANY GRADING (3) ANY SOILS PREPARATION (4) ANY WEED ERADICATION (5) NO MAINTENANCE (6) Water to be provided from Hydrant — Min 2-1/2 Inch if possible (7) Any traffic control needed to complete work w►vw.hl'droseedcoin 2013 Orange Avenue . Ramona . CA 92065 Phone 760-789-8040 Fax 760-789-5168 poundstone(CLlive.coin Toll Free (800) 924-9376 CALIFORNIA --� NATIONAL Orr MCORPORAfED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: Per agreement with HOA of condominiums on the NE corner of D Avenue and 12th Street 132 linear feet of 4' Ornamental Fence was installed. Under direction of the Engineer the Contractor proceeded with procuring and installing approx 132 LF of Fencing. CHANGE ORDER NO. 27 March 16, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with procuring and installing 132 LF of 4' Ornamental Fence at the NE corner of D Avenue and 12th Street. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 229,615.55 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: Py, ject Mana U Approved by: I ,City ngineer N/u /11. Date 1,725,504.55 9,560.72 1,735,065.27 Percent change in Contract to date 15.99% Date iCity Mana er, required for Change Orders>524.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment. materials. labor, supervision. overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agree to by New Century Construction, Inc.: Date Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Tefepfione (619) 336-4380 1243 National City Boulevard, National City, CA 91950 CALIFORNIA NATIONAL CIrp aL Sc t/ INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: March 9, 2016 CHANGE ORDER NO.27 WORK PERFORMED BY: In -Line Fencing DESCRIPTION OF WORK: 132 LF of 4' Ornamental Fence ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) Foreman Laborer Laborer HR HR HR 10.00 32.00 32.00 80.47 57.85 57.85 804.70 1,851.20 1,851.20 $ 4,507.10 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 540.85 $ 1,009.59 $ 6,057.54 MATERIALS Unit Qty Rate Total 1) 2) 3) 4) 5) Panels 1 1/2" Posts Mounting Brackets and Hardware Concrete Delivery EA EA EA YD LS 17.00 18.00 68.00 3.00 1.00 94.54 22.00 3.22 120.00 240.00 Sub -Total Materials: Sales Tax: 1,607.18 396.00 218.96 360.00 240.00 $ 2,822.14 $ 225.77 TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) N/A Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: SUBTOTAL: PRIME CONTRACTOR MARKUP (5%): $ 3,047.91 $ 9,105.45 $ 455.27 GRAND TOTAL: $9,560.72 CALIFORNIA ,-- NATION L CITY INCORP OR ATE'? D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction. Inc. Reason/Purpose for this Change Order: Under direction of the City Engineer the bike ramp on the SE corner of the Roundabout was to be removed and replaced with 6" curb and gutter. Under direction of the Engineer the Contractor proceeded under time and materials. CHANGE ORDER NO. 28 March 21, 2016 The City of National City and Contractor agree to the following change to the original Contract The Contractor and the City agree that the Contractor shall proceed with removing the bike ramp on the SE corner of the Roundabout and replace with 6" curb and gutter. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1;495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: Pject Manger Approved by: City engineer qtam, Date 1 239,176.27 1735,065.27 1,849.62 $ 1,736,914.89 Percent change in Contract to date 16.11 % Date City Manager, required for Change Orders >S24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally. Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment. materials. labor, supervision. overhead, fees, bonds. insurance, profit. etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. • Accepted and agreed to by New Century Construction, Inc Name: Date Note to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevar'd, National City, CA 91950 Terephone 619 336-4380 CALIFORNIA NATIONAL Cfrir nati INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: 2/3/16- 2/4/16 CHANGE ORDER NO. 28 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Remove bike ramp on SE corner of Roundabout ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) 4) Laborer - Carl Brown Laborer - Lenny Hebert Laborer - Victor Lind Hour Hour Hour 2.00 5.00 2.00 57.85 57.85 57.85 115.70 289.25 115.70 Operator - Victor Lind Hour 3.00 77.39 232.17 $ 752.82 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: 90.34 $ 168.63 MATERIALS Unit Qty Rate Total 1) 2) Dump Fee Concrete EA EA 0.50 1.00 250.00 150.00 125.00 150.00 $ 275.00 $ 41.25 $ 316.25 EQUIPMENT Unit Qty Rate Total 1) 2) 3) 4) 5) Lumber Truck Hour 2.00 19.70 39.40 334 EX 763 Bobcat Dump Truck Demo Saw Hour Hour Hour Hour 3.00 4.00 2.50 2.00 34.32 30.00 63.97 15.63 102.96 120.00 159.93 31.26 $ 453.55 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 68.03 $ 521.58 GRAND TOTAL: $1,849.62 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: CALIFORNIA NATIONAL CITY INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: Per agreement with HOA of condominiums on the NE corner of D Avenue and 12th Street 2 Trees were installed with Irrigation. Under direction of the Engineer the Contractor proceeded under time and materials with procuring and installing 2-24" Box Trees. CHANGE ORDER NO. 29 March 21, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with procuring and install 2-24" Box Trees at the NE Corner of D Avenue and 12th Street. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order 241,025.89 1,736,914.89 1,119.73 New contract amount a Working days added: 0 Working days subtracted: 0 Submitted by: Prod ct Mana• `r Approved by: City engineer Date _City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment, materials. labor, supervision, overhead. fees. bonds. insurance, profit. etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Date Percent change in Contract to date 16.19% 1,738,034.62 Accepted and agreed to by New Century Construction,lnc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 --'telephone (619) 336-4380 I - CALIFORNIA N, ZONALCi( INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: March 17, 2016 CHANGE ORDER NO. 29 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Procure and Install 2 Box Trees with Irrigation ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) Laborer - Victor Lind Laborer - Lenny Hebert Operator - Carl Brown Hour Hour Hour 2.00 2.00 2.00 57.85 57.85 77.39 115.70 115.70 154.78 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: 46.34 $ 86.50 $ 519.02 MATERIALS Unit Qty Rate Total 1) Valve and misc pipe/ fittings/ bubblers LS 1.00 453.71 453.71 $ 453.71 $ 68.06 521.77 EQUIPMENT Unit Qty Rate Total 1) 334 EX Hour 2.00 34.32 68.64 $ 68.64 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 10.30 $ 78.94 GRAND TOTAL: $1,119.73 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 386.18 1.22000 0.00 HYDRO-SCAPE I H R I G A T I 0 N 4 LANDSCAPE SUPPLIES Hydro Scape Products, Inc PO Box 843197 Los Angeles CA 90084-3197 SOLD TO: 3705 1 AT 0.416 E0218 10432131671699722 P3185456 0002:0005 III�III1111! 1111111II11111II'IIIIIIIITiillililliiill1llll NEW CENTURY CONSTRUCTION INC 9119 EMERALD GROVE AVE LAKESIDE CA 92040-3605 :.HEN BY: IRVING PERALTA PLACED BY: CARL Shipping Warehouse: CHULA VISTA,CA (619)691-9700/ INVOICE ACCT# 1538 INVOICE# 9545534-00 TYPE SO SMSN PREFERRED PAGE 1 of 1 *** WILL CALL *** Please Remit All Payments To: Hydro Scape Products, Inc PO Box 843197 Los Angeles CA 90084-3197 SHIP TO: 101 12th & D Ave & E Roundabout 619-843-6517 12th & D Street National City, CA 91950 COST POP: CARL STAGING AREA: ORDER DATE: 03/17/16 SHIPPED DATE: 03/17/16 SHIP VIA: Will Ca11 TERMS: 2% 10prx n30 PAYMENT TYPE: ON ACCOUNT DESCRIFTICN ORDERED SHIPPED BACKORDER LIST DISC NET PRICE UNIT EXTENSION .,.. MARLEX STR 90 .5" 50 50 0 0.53330 0.00 0.22000 EA MIFTxFIP T 4:7-111 PVC SCH40 .75x.5 ELBOW 20 20 0 1.00000 0.00 0.40000 EA _.__ 90 REDUCING SxFPT : ..- .75" SCH40 PVC PIPE SW 100 100 0 0.91000 0.00 0.26000 FT __.__ ,__ PVC SCH40 TEE SSS .75" 10 10 0 0.97000 0.00 0.39000 EA _.., PVC SCH40 .75x.5 REDUCER 1 C 0.71000 0.00 0.29000 EA .._. BUSH:NG SPxS . ......___4,_ RAIN BIRD MINI RWS 1402 :4 0 14 47.50000 0.00 25.65000 EA BUBBLER CV 4" GRT .5" EL RAIN BIRD MINI RWS 1401 2 2 0 47.50000 0.00 25.65000 EA ...__ BUBBLER CV 4" GRT .5" EL PVC NIPPLE .5x:2 SCH 80 18 18 0 1.44000 0.00 0.39000 EA 7.02 PVC SCH40 .75" ELBOW 90 50 50 0 0.77000 0.00 0.31000 EA 15.50 SS :_- 4" DRAIN SOCK x 100 FT 1 0 24.14000 0.00 19.32000 EA ROLL _.-___T__,; BEST 21 GRAM PLANTING 1 1 0 93.65000 0.00 51.51000 C5 TABS 1 BX (500) _.. LOW VOC GLUE QUART 711 1 1 0 40.10000 0.00 22.46000 EA 22.46 :3 1-0:0 PVC SCH40 TEE SSS 1" 1 1 0 1.21000 C.00 0.73000 EA 0.73 ss RAIN BIRD 1" RCV PLAS 1 0 105.00000 C.00 56.70000 EA 5£.70 .. "� RAIN BIRD TBOS SOLENOID 1 0 42.00000 0.00 22.68000 EA 22.6a POTTED LATCH:NG l£ ..., CC-_1. H7\TER 1 STATION BATTERY 1 1 0 175.00000 0.00 94.50000 EA 94.50 CONTROL W/ SOLENOID 17 BATT9� BATT 9 VOLT SINGLE 2 2 0 2.00000 0.00 2.00000 EA 4.+- :o + PVC SCH40 1x.75 REDUCER 1 0 2.78000 0.00 1.12000 EA 1.12 BUSHING MPTxFPT 19 454-C10 PVC SCH40 1" MALE ADAPTER MFTxS +_c-_.. PVC SCH40 .75" MALE 0 0.67000 0.00 0.27000 EA ADAPTER MPTxS _. _.o:: 10' TREATED TREE STAKE 4 0 7.42570 0.00 4.76000 EA • __.._r._ CINCH TIE 32" 8 0 0.71000 0.00 0.46000 EA _::.,o_. TAPE TOFLCN .75"x520' 1 1 0 0.59000 0.00 0.59000 EA Total Taxes invoice Total 0.49000 EA 0.45 :.5E 33.8: 453.71 TO VIEW ONUNE GO TO: htt • :llh drosca • e.billtrust.com USE THIS ENROLLMENT CODE: SFS TMV FQK ACCOUNT # / USERNAME 1538 0002:0005 HYDRO-SCAPE PRODUCTS, INC. SELLER RESERVECLAIMS MUST BE S TIITLE TO THESE GOODS UNTILDE WITHIN THREE DAYS PAIER D FOR N FULL IMERCHANDISE THE EVENT UT BECOMES NECESSARY TO FRNED FOR CREDIT MAY BE ILE SUITJECT TOENFORCE PAY EI.TG 5805 Kearny Villa Rd. SUCH SUIT MAY BE BROUGHT IN SAN DIEGO COUNTY, CALIFORNIA AT SELLERS OPTION AND HYDRO-SCAPE PRODUCTS. INCORPORATED VALL BE San Diego, CA 92123-1172 ENTITLED TO RECOVER ALL COLLECTION COSTS, ATTORNEY'S FEES AND INTEREST AT 18%ANNUAL PERCENTAGE RATE, ON ALL AMOUNTS FOUND g TO BE DUE AND PAYABLE. ALL TRANSACTIONS ARE DEEMED MADE, PAYABLE AND DUE, AT HYDRO-SCAPE PRODUCTS, INCORPORATED S PRINCO'A_ (858)560-1600 PLACE OF BUSINESS AT SAN DIEGO. CALIFORNIA PLEASE SEE www.hydroscape.com FOR ADDITIONAL TERMS AND CONDITIONS. -_. CALIFORNIA NATIONAL CITY !NCORPOR ATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: "No Pedestrian" signs were installed for the staircases leading to the utility boxes. Under direction of the Engineer the Contractor proceeded under time and materials with procuring and installing "No Pedestrian" signs on the staircases. CHANGE ORDER NO. 30 March 25, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with procuring and installing "No Pedestrian" signs on the staircases leading to the utility boxes. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders 242,145.62 Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: Approved by: CityPngineer / Date 1,738,034.62 332.30 1,738,366.92 Percent change in Contract to date 16.21 % r/.r/a .................... Date City Manager, requred for Change Orders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to at equipment, materials. labor, supervision, overhead, fees, bonds. insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agr d to by New Century Construction, Inc.: u I 27,0(//` Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National -City Boulevard, NationafTCity, CA 9050 Telephone (619D-36-43SO CM.IFORNIA NATIONAL Cn'Y a ' INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: March 23, 2016 CHANGE ORDER NO. 30 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Place Signs on gate for Stairs ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer - Carl Brown Hour 2.00 57.85 115.70 $ 115.70 13.88 $ 25.92 $ 155.50 MATERIALS Unit Qty Rate Total 1) No Pedestrian Signs LS 1.00 131.89 131.89 $ 131.89 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 19.78 151. EQUIPMENT Unit Qty Rate Total 1) Truck Hour 1.00 21.85 Sub -Total Equipment: Equipment Markup (15%): 21.85 21.85 $ 3.28 TOTAL EQUIPMENT: 25.13 GRAND TOTAL: $ 332.30 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: PAGE DIE SAFETY & SUPPLY CORP. CAUTION ` CAUTION CAUTION-- EVERY JOa aEOINS h ENDS WITH OLIR SERVICE CUSTOMER LIABLE FOR ANY DAMAGES AND LOST MATERIALS PER THE TERMS AND CONDITIONS ON REVERSE. And subject to a 1-1/2% late charge over 30 days. (But not to exceed the maximum legal rate). IICBZONE/SBA/WBE CSLB No. 791667 Remit To: 1616 West Avenue, National City, CA 91950 • (619) 299-5100 • Fax (619) 542-0763 Branch: 105 W. Main Street, El Centro, CA 92243 • (760) 336-3044 • Fax (760) 336-3067 www.acmesafetysupply.com INVOICE ACME SAFETY & SUPPLY CO. INVOICE tl: 182477-08 DATE:83/23/2016 NEW CENTURY CONSTRUCTION JOB: SALE 9119 EMERALD GROVE AVE. LOCATION: ROUND ABOUT / D AVE, LAKESIDE, CA 92040 AREA: TAX AREA: CITY: SAN DIEGO SUPER: (619)390-3300 PO: ROUNDABOUT/SAVE CUST I: 000138 JOB ID: SALE INVEN ID QUANTITY DESCRIPTION DELIVERY/PICKUP DATE TAX CHARGE RR-56S 1 RAPID RED 5 GALLON-7604 ORDER:896788-88 83/21/2816 (SALE) UNIT PRICE: 99.85 Y 99.85 SP-IOU 1 1 3/4'18' UNI-W/ANCH SL OR➢ER:896768-88 83/21/2816 (SALE) UNIT PRICE: 65.10 Y 65.18 UNI-RIV 20 UN1 RIVETS ORDER:096788-88 03/21/2016 (SALE) UNIT PRICE: 1.10 Y 22.80 UBOLT-2 4 UBOLT 2 3/8" ORDER:096788-88 83/21/2016 (SALE) UNIT PRICE: 3.75 15.8i:\ 18X18A 2 18X18 ENGR GRADE SIGN • ORDER:896788-00 83/21/2016 (SALE) UNIT PRICE: 58.80 Y 116.00 1BX1BA 3 18X18 ENGR GRADE SIGN ORDER:096788-80 03/21/2016 (SALE) UNIT PRICE: 58.80 Y 158.80 18X24A • 1 18X24 ENGR GRADE ALUM ORDER:696768-00 83/21/2016 (SALE) UNIT PRICE: 48.88 Y 48.80 OTS 1 12X6A ENGR GRADE ALUM ORDER:896788-88 83/21/2016 (SALE) UNIT PRICE: 16.58 Y 16.58 RENTALS SALES SERVICE NONTAXABLE DISCOUNTS TAXABLE 532.45 TAX 47.93 TOTAL 532.45 47.93 f21 568,38 588.38 *EVERY ORDER IS SUBJECT TO A MINIMUM JOB CHARGE* jccf j 6t y - CALIFORNIA -E. N IO L Cfry —. INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: During installation of the Bio-Retention Box on 18th Street curb/gutter, cross gutter and sidewalk adjacent to the improvements needed to be replaced. Under direction of the Engineer the Contractor proceeded with removing and replacing curb/gutter, cross gutter and sidewalk. CHANGE ORDER NO. 31 March 30, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with removing and replacing curb/gutter and sidewalk. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 16.37% Submitted by: $ 1,495,889.00 242,477.92 %% City'Engineer Date 1,738,366.92 2,351.00 1,740,717.92 City Manager, required for Change Orders>S24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally. Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment, materials. labor, supervision. overhead, fees, bonds. insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by New Century Construction, Inc.: 7 Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 Nationallity Boulevard, National City, CA 91950 Telephone 1'619T336-4380 CALIFORNIA NATIONAL C rTy anti INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: March 30, 2016 CHANGE ORDER NO.31 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Remove and replacing curb/gutter and sidewalk ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Wage Total 1) 2) 3) 4" sidewalk R&R 110 SF Cross Gutter 50 SF Curb and Gutter 10 LF LS LS LS 1.00 1.00 1.00 1,495.00 442.00 414.00 1,495.00 442.00 414.00 $ 2,351.00 Sub -Total: GRAND TOTAL: $ 2,351.001 CALIFORNIA NATIONAL CITY :I;i / INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: During installation of the Bio-Retention Box on 18th Street it was discovered that the flow line of the storm drain that the box was connecting into was shallower than the box. Under direction of the Engineer the Contractor proceeded under time and materials with removing the soil median and placing a false concrete bottom to raise the flow line of the box. CHANGE ORDER NO. 32 April 1, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed removing the soil median and placing a false concrete bottom to raise the flow line of the box. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders Subtotal 1,495,889.00 244,828.92 1,740,717.92 Amount of this change order 2,035.79 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 16.50% Submitted by: Approved by: ityngineer 11/1r6/; Date Date 1,742,753.71 ;City Manager, requred for change Orders >s24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds. insurance. profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agree to by New Century Construction Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1213 National City Bou evard, NationarCliy, CA'g1950 Telephone (619T33-6-4380 CALIFORNIA NATIONAL CIT Inv INCORPORATED - D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: April 1, 2016 CHANGE ORDER NO. 32 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Remove median and pour false bottom to adjust flow ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) Laborer - Victor Lind Laborer - Marvin Dupree Operator - Carl Brown Hour Hour Hour 8.00 8.00 2.00 57.85 57.85 77.39 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): 462.80 462.80 154.78 $ 1,080.38 $ 129.65 $ 242.01 TOTAL LABOR: MATERIALS Unit Qty Rate Total 1) 2) Dump Fee Concrete LS YD 0.25 2.50 250.00 150.00 62.50 375.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 56.25 $ 431.25 EQUIPMENT Unit Qty Rate Total 1) 2) Dump Truck 334 EX Hour Hour 1.00 2.00 63.97 34.32 63.97 68.64 $ 132.61 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 19.89 $ 152.501 GRAND TOTAL: $2,035.79 $ 375.00 - CALIFORNIA NATIONAL CT y T 31 INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: During installation of the Bio-Retention Box on west side of D Avenue an unforeseen electrical conduit had to be relocated. This Change Order also includes taking down and putting up new cameras at the memorial. Under direction of the Engineer the Contractor proceeded under time and materials with relocating the electrical conduit around the Bio-Retention Box. CHANGE ORDER NO. 33 April 1, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed relocating the electrical conduit around the Bio-Retention box on the west side of D Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount 1,495,889.00 Net change by previously authorized Change Orders 246,864.71 $ Subtotal 1,742,753.71 Amount of this change order 4,212.31 New contract amount $ 1,746,966.02 Working days added: 0 Working days subtracted: 0 Submitted by: Approved by: Date Percent change in Contract to date 16.78% ,.r/7,/ Cityyngineer Date City Manager, requredfor Change Orden >:u.99e Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally. Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment. materials. labor, supervision. overhead, fees, bonds, insurance, profit. etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by New Century Construction, Inc.: s--7—(-4,, 4, l't '4//4//6 Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Bou evara, National CT, CA 91950 TeTephoneT619) 336-4380 CALIFORNIA NATIONAL Clinr INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: January 18, 2016 CHANGE ORDER NO. 33 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Relocate electrical conduit around Bio-retention box ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) 4) Operator - Todd Perry Operator - Eric Schuler Tech 3 - Nate Helton Tech 1 - Tim Peterson Hour Hour Hour Hour 7.50 7.50 7.50 6.00 74.94 67.78 30.99 41.12 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): 562.05 508.35 232.43 246.72 $ 1,549.55 $ 185.95 $ 347.10 TOTAL LABOR: $ 2,082.60 MATERIALS Unit Qty Rate Total 1) 2) 3) 4) Concrete #3 Pullbox 120' #8 THW PVC Pipe and Fittings LS LS LS LS 1.00 1.00 1.00 1.00 13.05 50.96 39.14 42.48 13.05 50.96 39.14 42.48 $ 145.63 $ 21.84 $ 167.47 EQUIPMENT Unit Qty Rate Total 1) 2) 3) 4) 5) Dump Truck Utility Truck Bobcat Compressor Bucket Truck Hour Hour Hour Hour Hour 7.50 7.50 7.50 7.50 6.00 63.97 33.06 29.13 21.00 71.36 479.78 247.95 218.48 157.50 428.16 $ 1,531.87 $ 229.78 $ 1,761.65 $ 4,011.72 $ 200.59 GRAND TOTAL: $4,212.31 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: SUBTOTAL: PRIME CONTRACTOR MARKUP (5%): Dixieline Lumber Company 409 3950 Highland Ave. National City, CA 91950 Store Phonell 619-425-6660 Customer: 4000001 CASH SALE Date Time Ticket Number Salesperson 1/15/16 10:23 7680035-000 9117 Register PS0901 CARL THOMAS Description Amount CASH TICKET 13.05 1 1.00 @ 13.05 OP Cash Ticket 71093 Subtotal Tay 9.0000•r, Total Payment Summar: Date : 1/15/16 Visa ************6387 13 05 00 13.05 13.05 Total Items Sold : 1.00 I agree to pay the above total amount according to card issuer agreement. .77 Dixieline ProBuild San Diego's Home Improvement Store since 1913 Shop Local, Shop Dixieline!!! III1111111111111111 I I I I I 111111 007680035001 r I 3 o m og 2* _ O 3 11.1 m z m m A a al CED ***ORIGINAL*** CATIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 SOLDTO: ***US -MAIL*** T & M ELEC/DBA PERRY PO BOX 710130 SANTEE, CA 92071 INVOICE NO. i INVOICE DATE 1069-701978 11/23/15 PLEASE SHOW =NVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 T:858 451-7090 F:858 451-7094 SHIP TO: T & M ELEC/DBA PERRY 1011 BAY BLVD. CHULA VISTA, CA 91911 ACCOUNTNO. KY-92765 JOB #650 D AVE & 12TH J0B NAME AND ADDRESS DAVE & 12TH CUSTOMER ORDER t 650-978 SALESPERSON 1448 2PH SHIPPING INFORMATION PREPAID QUANTITY ORDERED PRODUCT CODE DESCRIPTION 20 PVC SCH4OELL1X90 50 PVC SC840-1 50 PVC BELL END1 40 PVC BELL END2 2 SDPREEO3119BOX 2 SDPREE03119ELEC SHIP VIA WILL CALL QUANTITY SHIPPED PRICE " DiSC. SHIP DATE 11/20/15 EXTENSION COD 90D PVC ELL CONDUIT PLASTIC BELL END ADAPT 3EBOX 10"X15" PULL BOX 3ECOVER/ELECT - AND RISK OF LOSS OR 33M>Cv TO MERCHANDISE ?ASSES AT POINT OF SHIPMENT. CLAIMS FOR S30P. OR IAMAOED MERCHA`.DISE SHOULD 3E MADE TO CARRIER. v0: .,'E HERC:A`.'DISE RETURNED WITHOUT OWILL _. CONSENT WILL E ON SE ACCEPTED. A RESTOCKING CHAR RETURNED GOODS UNLESS DEFECTIVE OR THRU ERROR CN OUR PART. x SERVICE CHARGE OF 1.5A PER MONTH, BUT NOT TO EXCEED :HE HIGHEST AMOUNT LAWFULLY ALLOWED BY CONTRACT IN :HIS STATE, WILL BE `LAZE ON ALL PAS? DUE ACCOUNTS. :HIS SALE IS SUBJECT TO OUR TERNS LOCATED AT :A'cS.OUR-TER:'S.COM., H'HICH WE MAY CHANGE FROM TIME .0 TIME WITHOUT PRIOR NOTICE. 20 50 50 40 2 2 x \.L9 CODE: TO ADVISE YOU PROMPTLY CODE IS USED ON OUR INVOICES 3 - BACK ORDERED. WILL SHIP INSTRUCTED TO CANCEL. - CANCELLED. NOT IN STOCK. 66.28 41.54 128.47 175.69 26.97 20.21 CONCERNING YOUR ORDER, THIS AS SOON AS RECEIVED UNLESS NET PAYMENT IS DUE B THE MONTH FOLLOWING i'NA3LE TO PURCHASE Yr.-."'Y. Y THE 15TH OF PURCHASE MERCHANDISE SALES TAX 8.000 SHIPPING CHARGE TOTAL DUE 13.26 20.77 64.24 70.28 53.94 40.42 262.91 21.03 .00 283.94 EED SOLD TO: ***ORIGINAL*** CALIFOR2iIA ELECTRIC SUPPLY - CHULA VISTA 1011 RAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 ***US -MAIL*** T & M ELEC/DBA PERRY PO BOX 710130 SANTEE, CA 92071 INVOICE NO. INVOICE DATE 10669-702220 11/30/15 PLEASE SHOW INVOICE NO. AND REMIT TO: P.O. 30X 509079 SAN DIEGO, CA 92150 T:858 451-7090 F:858 451-7094 SNIP TO: T & M ELEC/DRA PERRY 1011 BAY BLVD. CHULA VISTA, CA 91911 ACCOUNTNO. KY-92765 JOB i;:650 D AVE & 12TH JOB NAME AND ADDRESS CUSTOMER ORDERi 650-310 SALESPERSON 1448 RB SHIPPING INFORMATION PREPAID SHIP VIA WILL CALL SHIP DATE 11/25/15 QUANTITY ORDERED PRODUCTCOOE DESCRIPTION 2000 2000 2500 100 1 1 19 1 2 2 1 5 2 2 10 WIRE THWBBLAC%STR WIRE 75538STRGREEN WIRE THW10BLACYSTR FLEX XMLT3/4 CES LS7X4A TORR 1101 ARL DOT HAL HAL PVC CH PVC DOT HAL NMSC75 CN200 01920E 75220E TA2 SR120 FAA R354 61207E WIRE WIRE WIRE NON METALIC SEALTITE 4 POLE CONT 120V SPST 120V 40A TIME SWITCH 3/4 ST CONN 2-IN CONDUIT NIPPLE 2-IN DC LOCXNUT 2-IN 105D PLSTC BUSH TERM ADAPTER 20 AMP 1 POLE CIRCUIT BREAD FEM ADAPTER 1X3/4 RED BUSHING 3/4 RIDGID 2 HOLE STRAP :TIE AND RISK OF :ASS OR DAMAGE TO MERCHANDISE ASSES AT POINT OF SHIPMENT. CLAIMS FOR SHORT CR ?'.AD MERCHANDISE SHOULD BE MADE TO CARRIER. RCHA`.DISE RETURNED WITHOUT OUR CONSENT WILL NOT BE TCEPTED. A RESTOCXING CHARGE WILL BE MADE ON TURNED GOODS UNLESS DEFECTIVE OR THRU ERROR ON OUR ART. SERVICE CHARGE OF 1.5% PER MONTH, BUT NOT TO EXCEED E HIGHEST AMOUNT LAWFULLY ADO BY CONTRACT IN 92S STATE, WILL BE MADE ON ALL PAST DUE ACCOUNTS. HIS ¢P'T IS SUBJECT TO OUR TERMS LOCATED AT TS.OUR-TERMS.COM., WHICH WE MAY CHANCE FROM TIME TIME. WITHOUT PRIOR NOT/OE. QUANTITY 3 ° SHIPPED 2000 2000 2500 100 1 1 19 1 2 2 1 5 2 2 10 PRICE ' DISC. EXTENSION 289.55 302.00 186.00 79.89 70.00 60.63 185.53 426.62 54.07 42.64 69.09 4.13 56.5E 122.02 8.94 1..1 LI 0 X X 579.10 604.00 465.00 79.89 70.00 60.63 35.25 4.27 1.08 0.85 0.69 20.65 1.13 2.44 0.89 \Q C2_ . X ,Tzfl \LA - CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE :S USED ON OUR INVOICES. - RW'K ORDERED. W:LL SHIP AS 500N AS RECEIVED LESS IUN INSTRUCTED TO CANCEL. - CANCELLED. NOT :N STOCK. UNABLE TO PURCHASE NET PAYMENT IS DUE BY THE 15T5 O.. THE MONTH FOLLOWING PURCHASE MERCHANDISE SALES TAX 8.000 SHiPP3G CHARGE CID 1925.87 154.07 .00 TOTAL DUE 1 20i9.94 CED ***ORIGINAL*** CALIFORNIA ELECTRIC SUPPLY - CHUI.A VISTA 1011 BAY BLVD. Ci3ULA VISA, CA 91911 T:619 427-2370 F:619 427-5416 SOLD TO: ***US -MAIL*** T & M ELEC/DBA PERRY PO BOX 710130 SANTEE, CA 92071 ACCOUNT NO. xY-92778 JOB 4625 GENESEE AVE JOB NAMEAND ADDRESS TO SITE T SALESPERSON 1448 KS SHIPPING INFORMATION PREPAID QUANTITY ORDERED PROOUCTCOOE DESCRIPTION 2800 PVC TWO 80 PVC 80 PVC 30 PVC SCH40-2 LIFTS OF 10-FOOTERS COUP2 BELL END2 SCH4OELL2X90 CONDUIT PVC COUPLING BELL END ADAPT 90D PVC ELL TITLE AND RISX OF LOSS OR DAMAGE TO MERCHANDISE PASSES AT POINT Or SHIPMENT. CLAMS FOR BE mADE TO SH SHORTTR OR DAMAGED NSRCHANCISE SHOULD' OUR CONSENT WILLNOT SE 2RCHAWD:SE RETURNED ACCEPTED. A RESTOCKING CHARGE NILL SE MADE ON ;ETUR1.'ED GOODS UNLESS DEFECTIVE OR THRU ERROR ON OUR PART. A SERVICE CHARGE OF 1.::% PER MONTH, BUT NOT TO EXCEED INE HIGHEST AMOUNT LAWFJL:.Y ALLOWED BY CONTRACT IN rH:B STATE, RILL BE MADE ON ALL PAS' ODE ACCOUNTS. THIS SALE :S SUBJECT TO OUR TERMS LOCATED AT 1ALES.011R-TERMS.CCM, W3ICH WE MAY CHANGE FROM. TIME IO TIME WITHOUT PRIOR NOTICE. .rlacc-3 3 INVOICE NO. ! INVOICE DATE 1069-702568 12/08/15 PLEASE SHOW INVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 T:858 451-7090 F:858 451-7094 SHIP TO: T & M ELEC/DBA PERRY TO JOB SITE GENESSE AVE SAN DIEGO, CA 92117 SHIP VIA OUR TRUCK QUANTITY SHIPPED PRICE ' DISC_ 2800 63.40 C. 80 i" 37.50 C --,80 175.69 C 172.47 C c�\ CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE IS USED ON OUR INVOICES. B - BACK ORDERED. WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CANCEL.-rnt•Y. C - CANCELLED. NOT IN STOCK. UNA3:.E TO PURCHASE NET PAYMENT IS DUE BY THE 15TE OF THE MONTH FOLLOWING PURCHASE CUSTOMER ORDERI 626-'1t1 SHIP DATE 12/03/15 - EXTENSION 1,775.20 30 00 140.55 51.74 VD -0c7(5� f-\ QL\ MERCHANDISE SALES TAX 8.000 SHIPPING CHARGE TOTAL DUE 1997.49 159.80 .00 2157.29 CALIFORNIA NATI01 `A.L, C f "y-,r l3f1 INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: During excavation of the Bio-Retention Boxes on the West and East sides of D Avenue an unforeseen old concrete road with curb/gutter was encountred. Under direction of the Engineer the Contractor proceeded time and materials with removing sections of the unforeseen concrete road, curb and gutter. CHANGE ORDER NO. 34 April 22, 2016 under The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with removing sections of the unforeseen old concrete road, curb and gutter to properly install the Bio-Retention boxes. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order 1,495,889.00 251,077.02 1,746,966.02 944.77 New contract amount $ Working days added: 0 Submitted by: Pro' t Manag Approved by: City engineer Working days subtracted: 0 Percent change in Contract to date 16.85% 1,747,910.79 Date City Manager, required for Change Orders 424,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment materials. labor, supervision, overhead, fees, bonds. insurance. profit. etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to New Century Construction, Inc.: Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 NationTCity Boulevard, National City, CA 91950 TelephoneT619T336-4380 Date CALIFORNIA NATIONAL CiTy liCAV INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: 1/13/16 and 1/26/16 CHANGE ORDER NO. 34 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Remove sections of old concrete road, curb and gutter ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) 4) 5) Laborer - Victor Lind Laborer - Carl Brown Laborer - Lenny Hebert Operator - Victor Lind Operator - Carl Brown Hour Hour Hour Hour Hour 1.00 1.00 1.00 2.00 2.00 57.85 57.85 57.85 77.39 77.39 57.85 57.85 57.85 154.78 154.78 $ 483.11 $ 57.97 MATERIALS N/A 1) Unit Qty Rate Total Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) 2) 3) Dump Truck 334 EX Bobcat Hour Hour Hour 1.00 3.00 3.00 63.97 34.32 30.00 63.97 102.96 90.00 $ 256.93 $ 38.54 $ 295.47 GRAND TOTAL: $ 944.77 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): $ 108.22 TOTAL LABOR: CALIFORNIA NATIONAL CITY INco po ATED - D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order. During excavation of the Bio-Retention Box on the South side of 12th St and C Avenue an unforeseen water line had to be relocated around the box. Under direction of the Engineer the Contractor proceeded under time and materials with relocating the unforeseen water line. CHANGE ORDER NO. 35 April 22, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with relocating the unforeseen water line to install the Bio-Retention box per plans. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Submitted by: 1,495,889.00 252,021.79 1,747,910.79 1,627.80 Working days subtracted: 0 Percent change in Contract to date 16.96% Y/t/fib._ ......... Pct Managdf Date Approved by: 1,749,538.59 City Engineer Date C' Mana er, required for chance orders S24 999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally. Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment. materials. labor, supervision, overhead, fees. bonds. insurance. profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by New Century Construction, Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, Nation f'tity, CA 91950 Tee hone (6191336-4180 CALIFORNIA - NATIONAL C'I,_�'V INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: January 19, 2016 CHANGE ORDER NO. 35 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Relocate water line around Bio-Retention box ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer - Marvin Dupree Hour 2.00 57.85 115.70 2) Laborer - Victor Lind Hour 1.00 57.85 57.85 3) Laborer - Carl Brown Hour 4.00 57.85 231.40 4) Operator - Lenny Hebert Hour 2.00 77.39 154.78 $ 559.73 $ 67.17 $ 125.38 $ 752. MATERIALS Unit Qty Rate Total 1) Pipe Materials LS 1.00 462.05 462.05 $ 462.05 EQUIPMENT' Unit Qty Rate Total 1) 2) 3) 4) 5) Lumber Truck 710 Backhoe Bobcat w/ Breaker Rotor Hammer Demo Saw Hour Hour Hour Hour Hour 1.50 2.00 2.00 2.00 2.00 21.50 81.88 30.00 15.63 6.00 32.25 163.76 60.00 31.26 12.00 Sub -Total Equipment: Equipment Markup (15%): $ 299.27 $ 44.89 TOTAL EQUIPMENT: 344.1E GRAND TOTAL: $1,627.80 Sub -Total Materials: Materials Markup (15%): $ 69.31 TOTAL MATERIALS: Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: CONTRACT NO. ;15 FERGUSON° v e rtimedan aertcl t.com moneyouse /thee itemto #'s below (;i.;SO'ef EiNITPRPCMIE tf Y2 NUOt)Y TTEET ORDER NO. CUSTOMER NO. S8-27TI-j3JA.2 REQUIRED DATE SHIP WI -IS. SELL WHS. CUSTOMER ALPHA ALa fj NOT °LUIGI ;L.L POYMEK 'WW1, :IUSTOMER P.O. NO. ORDER QTY. SHIPOTY. BID NO. ITEM CODE , . CI -RETURNS ALLOWED WITHOUT PROPER AITHORIZATION. RETURNED MATERIALS MCI TO HANDLING CHARGES. E REVERSE SIDE RJR IMPORTANT TERMS AND CONDITIONS OF SALE AND LIMITATIONS WARRANTY. STOMER'S NATURE: ORDER DATE ORDERED BY UP Dra,O, c1211! DATE: SUBTOTAL INBOUNO I OUTBOUND FREIGHT SHIPPING L a ti R k. R 0 n 0,,, INSTRUCTIONS SHIP VIA 'CS SHIP WT. TERMS:' RAGS BOXES UNIT PRICE CRATES SHIP DATE LENGTHS WRITER TAG PO. NO. OML CONTACT VENDOR VENDOR P.O. NO. ROUTE NO. BUNDLES ROUTE DESC. DELIVERED BY TOTAL PACKED BY SALESMAN 'If RUN NO DEPART TB CHECKED By AISLE LOC CALIFORNIA - NA.TIONAL CITY / CORPORAIED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction. Inc. Reason/Purpose for this Change Order: During installation of the bus pad on D avenue asphalt adjacent to the work had failed and had to be replaced. Under direction of the Engineer the Contractor proceeded under time and materials with grinding and replacing the asphalt section. CHANGE ORDER NO. 36 April 22. 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with grinding and replacing the asphalt adjacent to the new bus pad on D Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 17.26% Submitted by: Projt Manage Approved by: Gl/f/1b Date 253,649.59 1,749,538.59 4,546.78 $ 1,754,085.37 1 City ngineer / Date 1City Manager, required for Change Orders>524,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and cond,tions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work. including but not limited to all equipment. materials. labor, supervision, overhead, fees, bonds. insurance, profit. etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to,by New Century Construction, Ina: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevar7, Natiorial-City, CA 91950 Telephone (619j 336-4380 CALIFORNIA m NATIONAL TONAL CIT'V INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification #15-02 DATE: March 11, 2016 CHANGE ORDER NO. 36 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Grind and replace AC adjacent to bus pad ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer - Victor Lind Hour 8.00 57.85 462.80 2) 3) Operator - Carl Brown Operator - Lenny Hebert Hour Hour 8.00 8.00 77.39 77.39 619.12 619.12 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 1,701.04 $ 204.12 $ 381.03 $ 2,2 MATERIALS Unit Qty Rate Total 1) Asphalt/ Tack LS 1.00 541.91 541.91 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 541.91 $ 81.29 623. EQUIPMENT Unit Qty Rate Total 1) Cat with Grinder Hour 8.00 100.00 800.00 2) Sweeper Hour 4.00 30.00 120.00 3) Dump Truck Hour 6.00 63.97 383.82 4) 763 Bobcat Hour 4.00 30.00 120.00 $ 1,423.82 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 213.57 $ 1,637.39 GRAND TOTAL: $4,546.78 �uS California Mailing Address: P.O. Box 1840, Poway, CA 92074 Commercial Corporate Address: Asphalt Enterprises, LLC ACCOUNT NO. NEWCENT 13025 Danielson Street, Suite 260, Poway, CA 92064 (858) 513-0611 SOLD TO NEW CENTURY CONSTRUCTION, INC. 9119 EMERALD GROVE AVE. LAKESIDE , CA 92040 INVOICE 162434 PAGE 1 DATE 3/11/16 TERMS: ACCOUNTS DUE AND PAYABLE ON DELIVERY Accounts are past due after 30 days. Interest will be charged on past due accounts. Delinquent accounts are subject to the maximum charges and interest permitted by applicable law. Job Name: D AVE & E AVE -12TH ST ROUNDAB Job Number: 15-02 12TH & D, NATIONAL CITY PO # Ticket Date Order Loc Product Qty Material Tax Rate/Amt Amount Total 122643 03/11/16 151494 OTAY 1/2 TYPE III C3 PG64-10 9.09 53.00 38.54 520.31 481.77 Subtotal 151494 112 TYPE III C3 PG64-10 9.09 Ton $481.77 $38.54 $520.31 Invoice Total 9.09 Ton $481.77 $38.54 $520.31 Freight Total Invoice $0.00 $520.31 It is agreed between the buyer and seller that sale is consumated and title passed at the plant site. The price of this material has been quoted F.O.B. our plant and -Subject to sales tax on material only. Transportation charge for this material is made by licensed independent truck operators at Public Utility Commission rates and subject if applicable to transportation tax only. We make deliveries inside curb line and on the lot at customer's risk only and accept no responsibility whatsoever for damages resulting from such deliveries. Under the Mechanic's Lien Law (California Code of Civil Procedure, Section 1181 et seq.), any Contractor, Subcontractor, laborer, supplier or other person who helps to improve your property but is not paid for his work or supplies, has a right to enforce a claim against your property. This means that, after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your own contractor in full if the subcontractor, laborer, or supplier remains unpaid. California Mailing Address: P.O. Box 1840, Poway, CA 92074 Commercial Corporate Address: 13025 Danielson Street, Suite 260, Poway, CA 92064 (858) 513-0611 Asphalt Enterprises, LLC ACCOUNT NO. NEWCENT SOLD TO NEW CENTURY CONSTRUCTION, INC. 9119 EMERALD GROVE AVE. LAKESIDE , CA 92040 INVOICE 162433 PAGE 1 DATE 3/11/16 TERMS: ACCOUNTS DUE AND PAYABLE ON DELIVERY Accounts are past due after 30 days. Interest will be charged on past due accounts. Delinquent accounts are subject to the maximum charges and interest permitted by applicable law. Job Name: D AVE & E AVE -12TH ST ROUNDAB Job Number: 15-02 12TH & D, NATIONAL CITY PO # Ticket Date Order Loc Product Qty Material Tax Rate/Amt Amount Total 122640 03/11/16 151494 07 EMULSION SS-1H 5.00 2.40 0.96 12.96 12.00 Subtotal 151494 EMULSION SS•1H ' 5.00 Gallons $12.00 $0.96 $12.96 122641 03/11/16 151494 07 TACK BUCKET Subtotal 151494 TACK BUCKET 1.00 8.00 8.00 1.00 TON $8.00 0.64 8.64 $0.64 $8.64 Invoice Total 6.00 TON $20.00 $1.60 $21.60 Freight $0.00 Total Invoice > $21.60 D It is agreed between the buyer and seller that sale is consumated and title passed at the plant site. The price of this material has been quoted F.O.B. our plant and subject to sales tax on material only. Transportation charge for this material is made by licensed independent truck operators at Public Utility Commission rates and subject if applicable to transportation tax only. We make deliveries inside curb line and on the lot at customer's risk only and accept no responsibility whatsoever for damages resulting from such deliveries. Under the Mechanic's Lien Law (California Code of Civil Procedure, Section 1181 et seq.), any Contractor, Subcontractor, laborer, supplier or other person who helps to improve your property but is not paid for his work or supplies, has a right to enforce a claim against your property. This means that, after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your own contractor in full if the subcontractor, laborer, or supplier remains unpaid. -- CALIFORNIA NATIONAL CITY I.3.3`/ INCORPORATED D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: The Military Seals arrived onsite with dimensions larger than specified, additional grinding was required to set into the concrete pedestals. Under direction of the Engineer the Contractor proceeded under time and materials with additional grinding to set the Military Seals. CHANGE ORDER NO. 37 April 22, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with additional grinding to set the Military Seals. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders 258,196.37 Subtotal Amount of this change order 1,754,085.37 1,318.96 New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: Approved by: Percent change in Contract to date 17.35% 1,755,404.33 City2'n ineer g Date _IClty Manager, required for Change Orders >524,999 Dat@ � 1 By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price. terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally. Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment. materials. labor, supervision. overhead, fees, bonds. insurance. profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Neyv Centuryfonstruction Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 3r6-4380 \1I/ CALIFORNIA — NATIONAL My y O e c A INCORPORATED — %\ D AVENUE AND E 12TH STREET ROUND -A -BOUT CHANGE ORDER NO. 37 Specification #15-02 DATE: December 2, 2016 WORK PERFORMED BY: New Century Construction, Inc. DESCRIPTION OF WORK: Additional grinding to set Military Seals ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Laborer - Victor Lind Hour 8.00 57.85 462.80 2) Laborer- Marvin Dupree Hour 5.00 57.85 289.25 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 752.05 $ 90.25 $ 168.46 MATERIALS Unit Qty Rate Total 1) N/A Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: EQUIPMENT Unit Qty Rate Total 1) Generator Hour 8.00 11.00 88.00 2) 3) Rotor Hammer Compressor Hour Hour 8.00 8.00 6.00 16.50 48.00 132.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 268.00 $ 40.20 $ 308.20 GRAND TOTAL: $1,318.96 CALIFORNIA NATIONAL CIi'y .. INCORPORATED-- D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: The original contract did not include the maintenance for the additional landscaping added to the contract per Kimley-horns revised plans. Under direction of the Engineer the Contractor proceeded with the additional landscape maintenance. The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with the additional landscaping maintenance. The agreed upon price for all costs associated with this work is $250 dollars per month. For a total of $1,000 for 4 month maintenance period. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders 259,515.33 Subtotal are incorporated herein. CHANGE ORDER NO. 38 April 22, 2016 1,755,404.33 Amount of this change order 1,000.00 New contract amount $ 1,756,404.33 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 17.42% . ................ Submitted by: Approved by: )--- City_ ngineer Date Manager,Change.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents at costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents Accepted and areedt Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619T336-4380 by New Century Construction, Inc.: 1243 NationaTCity Boulevard, National City, CA 91950 CALIFORNIA --,- NATIONAL c1 " ('- INCORPORATED • D AVENUE AND E 12TH STREET ROUND -A -BOUT Specification No. 15-02 Contractor: New Century Construction, Inc. Reason/Purpose for this Change Order: The pedestrian bollards on the NE Corner of D Ave and 12th Street were damaged from a vehicle accident. Under direction of the Engineer the Contractor proceeded with repairing and resetting the damaged pedestrian bollards. The work consists of repairing the damaged concrete, repairing a damaged bollard and resetting 3 bollards with chain. CHANGE ORDER NO. 39 April 22, 2016 The City of National City and Contractor agree to the following change to the original Contract: The Contractor and the City agree that the Contractor shall proceed with the repairing and resetting the damaged pedestrian bollards. The agreed upon price for all costs associated with this work is a lump sum price of $1,800.00. Original Contract Amount $ 1,495,889.00 Net change by previously authorized Change Orders Subtotal Working days added: 0 Working days subtracted: 0 Submitted by: Prot Man Approved by: Date 260,515.33 1,756,404.33 Amount of this change order 1,800.00 New contract amount $ 1,758,204.33 Percent change in Contract to date 17.54% City.En sneer Date -City Manager, required for Change Orders>S24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed t ' by Alety''C tiny Construction, Inc.: / i'l�C Name: Note to Contractor: If you do not agree with this Change Order you may be directed to and you may proceed under protest. You must comply with the contract requirements Originals: City Clerk, Contractor 1243 NationaTCity Bouleval3c, National City, CA 91950 Date proceed with this work under the terms of the contract of submitting a written protest to protect your claim. cc: Engineering project file, Project Manager Telephone (6191336-4380 ry�R�l>< MD 0i///1I11„n����D1111\\\�\�`` r� CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk NEW CENTURY CONSTRUCTION Change Order #14 - #39 D Avenue and East 15t Street Roundabout Judy Hernandez (Engineering/PW) Forwarded Copy of Change Orders to New Century Construction