HomeMy WebLinkAbout2016 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #1-*CALIFORNIA -- TIONAL L- •NCORPORATEP ) PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 1 May 10, 2016 Reason/Purpose for this Change Order: The original plans did not account for the relocation of backflow preventers and removing a tree at 1539 E Plaza Blvd. Under direction of the Engineer the Contractor is to proceed with relocating 3 backflow preventers and removing and disposing of a cupania tree. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with relocating 3 backflow preventers and remove and dipose of a cupania tree at 1539 E Plaza Blvd. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders Subtotal Amount of this change order 1,894,498.10 5,181.84 New contract amount $ Working days added: 0 Working days subtracted: 0 Submitted by: s/1/1t ect ManDate 'Approved by: id n ineer Date ICity Manager, required for Change Orders S24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Percent change in Contract to date 0.27% 1,899,679.94 Accepted and agreed to by Dick Miller, Inc.: SI1c�Jt Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Tefephone(619) 336-4380 CALIFORNIA NATIONAL TIONAL CI'!'y INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification # 16-01 DATE: May 10, 2016 CHANGE ORDER NO. 1 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: Relocate 3 backflow preventers and remove and dispose of a cupania tree at 1539 E Plaza Blvd ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) 4) 5) Foreman Laborer - Dig and Backfill Laborer - Dig and Backfill Laborer - Install Concrete Pad Laborer - Set enclosure and connect existing valves Hour Hour Hour Hour Hour 8.00 8.00 8.00 4.00 6.00 80.20 55.52 55.52 57.63 57.63 641.60 444.16 444.16 230.52 345.78 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ 2,106.22 $ 421.24 $ 2/527.46,, MATERIALS Unit Qty Rate Total 1) Pipe Materials LS 1.00 785.33 785.33 2) Concrete CY 0.50 100.00 50.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 835.33 $ 125.30 EQUIPMENT Unit Qty Rate Total 1) Chevy Truck with Tools Hour 8.00 50.00 400.00 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 400.00 $ 60.00 SUB TOTAL: $ 960.63 I $ 460.00 $ 3,948.09 CALIFORNIA+ NATIONAL CM INCORPORATED SUBCONTRACTOR Unit Qty Rate Total 1) 1) Remove and dispose Tree Grind stump in place LS LS 1.00 1.00 800.00 375.00 Sub -total Subcontractor: Prime Contractor Markup (5%): 800.00 375.00 $ 1,175.00 58.75 TOTAL SUBCONTRACTOR: $ 1,233.75 GRAND TOTAL: $5,181.84 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk DICK MILLER, INC. Change Order #1 Plaza Blvd. Widening "N" Avenue to 1-805 Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Dick Miller, Inc.