Las Palmas Pool, Camacho Gym and Fire Station 31
Specification #16-02
Contractor: Fordyce Construction, Inc.
CHANGE ORDER NO. 2
June 27, 2016
Reason/Purpose for this Change Order:
Upon direction from the City, the contractor was asked to provide a proposal to conduct an initial mold
investigation at Fire Station 31 (COR 02), additional soffit repairs at the Las Palmas Pool office area (COR 03).
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor will provide all the services described in Exhibit "A" for the
lump sum price of $7,459.
Original Contract Amount $ 325,285.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $
Working days added: 0
rroject Manager Date
Working days subtracted: 0
proved by:
t En•Ine:r
/Z -7// co
7 �2
ate ! City Manager, required for Change Orders >$24,999 Date
44,255.00
369,540.00
7,459.00
Percent change in Contract to date 15.90%
376,999.00
gineer Date
B signing this 1 hange Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its •rice, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by FORDYCE CONSTRUCTION, Inc.
Na
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
- CALIFORNIA
Las Palmas Pool, Camacho Gym and Fire Station 31
Specification #16-00
NATIONAL ay
INCORPORATED
CHANGE ORDER NO. 2, Attachment "A"
DATE: June 27, 2016
WORK PERFORMED BY: FORDYCE CONSTRUCTION, INC
DESCRIPTION OF WORK:
Mold investigation
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1
Provide mold investigation at FS 31
$1,060.00
2
Added soffit repairs
$6,399.00
Subtotal
$7,459.00
Subtotal I $
TOTAL $7,459.00
CONSTRUCTION
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
COST ESTIMATE SUMMARY SHEET for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31
Description of Work: Mold Inspection at Fire Station 31
Contractor: Fordyce Construction
COR #:
Spec No: CIP 16-02
Date: 6/16/2016
Worksheet
Description
Totals
1
Prime Contractor (Includes Prime Contractor Mark Up)
$0.00
2
Sub -Contractor (Includes Prime Contractor Mark Up)
$1,044.75
Note: No design engineering and permit fees Included
Subtotal:
$1,044.75
1.5% BOND:
$15.67
GRAND TOTAL :
$1,060.00
ORDYCE
• CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No.
Description of Work: Fire Station 31 Mold Inspection Prepared By: Amy Crandall
COR: 2.1
Contractor: Fordyce Construction Inc.
Date: 06/16/16
Project No. CIP 16-02
Item
Description
Qty
Unit
Materials
Unit Cost
Total
Man
Hours
Labor
Labor
Rate
Total Base
Labor
Equipment
Unit Cost
Total
Sub-
contractor
Cost
Labor
0
hr
50.13
0.00
0
hr
50.13
0.00
0
hr
50.13
0.00
0
hr
50.13
0.00
0
hr
50.13
0.00
0
hr
50.13
0.00
0
hr
50.13
0.00
quipmen
0.00
0.00
0.00
0.00
0.00
Materials
0.00
0.00
0.00
0.00
0.00
0.00
0.00_
Subcontractor Costs
EnviroCheck
995.00
SUBTOTAL
$0.00
$ -
$0.00
$995.00
Sales Tax/Labor Burden
8.75%
$0.00
34.32%
$ _
$0.00
---
Total Without Mark Ups
$0.00
$ -
$0.00
$995.00
Mark -Up Percentages
15%
$0.00
20%
$ -
15%
$0.00
5%
$ 49.75
Total with Mark -Up
* Mat'I
$0.00
* Labor
S
*Equip.
$0.00
*Subcont.
$1,044.75
Grand Subtotal:
$1,044.75
BOND @:
1.50%1 I $15.67
GRAND TOTAL :
$1,060.00
DocuSign Envelope ID: 01 DBE575-2693-48EA-A45C-
' ENV/ROCHECK''" Work Order
www.envirocheckinc.com 800-665-7586
1-160609-3592-12969
Date
Time
Tech
14-Jun-16
12-12:30p
MB
Called In By:
Date Called In:
Referred By:
Vinh Pham
9-Jun-16
Fordyce Construction
Phone #:
Email:
Vince Crisci
vcrisci@fordyceconstruction.com
619-820-7832
Billing Information:
Company: Fordyce Construction
Job Information:
Building Owner: Fire Station #31
Service Requested:
Contact: Vince Crisci
Contact:
r Asbestos
r Lead ri Mold
Address: 9932 Prospect Avenue,
Address: 2333 Euclid Avenue
r Air
r Bacteria r CBP
# 138
r Meth r Re- r Job Walk
City: Santee State: CA
City: National City State: CA
r P.R.V. r ATP r TO-15NO
Zip: 92071
Zip: 91950
r Allergens r Other r XRF
r Initial r Clearance
Phone #: 619-820-7832
LOCKBOX COMBO:
Fax #: (619) 449-1930
Email: vcrisci@fordyceconstruction com
Asbestos Information: r Reno
r Fire r Water r Demo
Service Information:
Time & Date Requested:
Suspect Materials:
Purpose of inspection:
r Acoustic r Drywall r Plaster
r Stucco r Roofing r Siding
Area of Concern:
r Pipe Ins. r Attic Ins. r Transite
r Ducting r Flooring r Brake
E Other
Access to Property:
Special Notes:
Sq. footage of property/Year Built:
Scope of Work:
Envirocheck will perform a limited inspection relating to the services listed in the products and services section for the
purpose described herein in the areas of concern listed above. The inspection will include a visual assessment, sampling -
and analysis of applicable and accessible materials and a written report.
E
All windows and doors should be closed at least 8 hours prior to the investigation.
E
Household air filtration device(s) should remain off 8 hours prior to the investigation.
I`
Air / Heating units should remain off indefinitely until the alleged mold and associated problems have been assessed.
PRICE INFORMATION:
Quantity Description Amount Total
1
Mold - Mold Consulting Service
$ 995.00
$ 995.00
Note: Preparation of Procedure 5 Report (SCAQMD Rule 1403), as necessary is $695.00 TOTAL
$ 995.00
Payment Type: Cash Check # Credit Card#
AUTHORIZATION and AGREEMENT:
Submitted herewith is our proposal for rendering services. If the contract terms are acceptable, please sign below. Any requested changes must be
approved by Envirocheck in writing prior to commencement of work. By signing below, Client acknowledges that he/she/it has read the terms and
conditions on the reverse side hereof, and any exhibitions or schedules attached thereto, understands each condition of this Agreement and
Envirocheck's standard fee schedule, and agrees to be bound thereby. Signor/client/insured is aware the he/she/it is responsible for forwarding
payments received from the insurance carrier, regarding work performed by Envirocheck, to Envirocheck immediately upon receipt, and that
he/she/it is ultimately responsible for payment regardless of policy coverage's, as applicable.
,_„„,,,,A,gnAture Print Name Title Date
VITA& Crisci
Vince Crisci
Proj. Manager
6/16/2016
r ae,n0e7n]nArnA1
ORDYCE
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
Project:
COST ESTIMATE SUMMARY SHEET for EXTRA WORK
Las Palmas Pool,Camacho Gym and Fire Station 31 Spec No: 14002
Description of Work: 03 Added Soffit Repair at Las Palmas - Repair at the Easterly
Eave
Contractor: Fordyce Construction
COR #:
Date: 6/2/2016
escr ption
s
1
Prime Contractor (Includes Prime Contractor Mark Up)
$6,304.28
2
Sub -Contractor (Includes Prime Contractor Mark Up)
$0.00
Subtotal:
$6,304.28
1.5% BOND:
$94.56
GRAND TOTAL :
$6,399.00
ORDYCE
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31
Description of Work:
COR: 03 Added Soffit Repair at Las Palmas - Repair at the Easterly Eave
Contractor: Fordyce Construction Inc.
Contract No.
Prepared By: Amy Crandall
Date: 06/02/16
Project No. 14002
Item
Labor
Description
Qty
Unit
Materials
Labor
Unit Cost
Total
Man
Hours
Labor
Rate
Total Base
Labor
Equi ment
Unit CostIP
Total
Sub-
contractor
Cost
1
Demo Rim joist
8
hr
8
50.13
401.04
Demo 2x8x10 joist
12
hr
12
50.13
601.56
Demo roofing and sheathing
12
hr
12
50.13
601.56
Install Rim joist
8
hr
8
50.13
401.04
Install 2x8x10 joist
12
hr
12
50.13
601.56
Install roof sheathing
16
hr
16
50.13
802.08
0
hr
0
50.13
0.00
quipmen
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
Materials
2X6X16' Rim joist
9
ea
12.50
112.50
2x8x10' added joists
6
ea
15.00
90.00
3/4" plywood sheathing
15
ea
25.00
375.00
Nails 16D
1
box
20.00
20.00
Nails 8D
1
box
20.00
20.00
dump fee
1
ea
30.00
30.00
0
0.00
ubcontractor Costs
0.00
SUBTOTAL
$647.50
$ 3,408.84
$0.00
$0.00
Sales Tax/Labor Burden
8.75%
$56.66
34.32%
$ 1.169.91
$0.00
Total Without Mark Ups
$704.16
$ 4,578.75
$0.00
$0.00
Mark -Up Percentages
15%
$105.62
20%
$ 915.75
15%
$0.00
5%
8 -
Total with Mark -Up
* Mat'I
$809.78
* Labor
$ 5,494.50
* Equip.
$0.00
*Subcont.
$0.00
Grand Subtotal:
$6,304.28
BOND @:
1.50%I j $94.56
GRAND TOTAL :
$6,399.00
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
FORDYCE CONSTRUCTION
Change Order #2
Las Palmas Pool, Camacho Gym & Fire Station 31
Improvements Project
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Fordyce Construction