HomeMy WebLinkAbout2016 CON Just Construction - Paradise Valley Rd Pedestrian and Drainage Enhancements - Change Orders #3 through #6CALIFORNIA $ 201,000.00 24,711.80 225, 711.80 Amount of this change order 800.00 New contract amount. Working days added: 0 Working ds subtracted: 0 Percent change in Contract to date 12.69% Submi ed by7 7 Project Manager Approved by. City gin er City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and repre ents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bond insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract do umen are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) ;Accepted and agr ed b,� (Contractor's name Date City Project Manager $ 226,511.80 Date Date NATIONAL CITY. 1J:3fl 1NC0R1'0RATE.r) Paradise Valley Road Pedestrian and Drainage Enhancements CHANGE ORDER NO. 3 CIP No: 15-03 Contractor: Just Construction, Inc. Reason/Purpose for this Change Order: The city diiected the contractor to install additional chain link fence on the existing concrete wing walls adjacent to the project headwall fence. March 21, 2016 The City of National City and Contractor agree to the following change to the original Contract: The contractor shall install approximately 21' of additional chain link fence at the wing walls originally not called for on the plans. Due to the angle of the headwalls and fence additional labor was needed. This includes additional labor costs and will be paid in addition to the contract unit cost for the additional fence installed. Original Contract Amount .. Net change by previously authorized Change Orders Subtotal ¥. zip --1 60 Name: f %ci Toles.. ! f L _K46)y26'1 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA --- NATIONAL CiTp .Ljj1J INCORPORATED Paradise Valley Road Pedestrian and Drainage Enhancements CHANGE ORDER NO. 4 CIP No: 15-03 Contractor: Just Construction, Inc. Reason/Purpose for this Change Order: The city directed the contractor to re-route the sidewalk around an existing City of San Diego vault with grade elevations conflicts to the new city sidewalk being installed. March 21, 2016 The City of National City and Contractor agree to the following change to the original Contract: The contractor shall route the city sidewalk as directed around the existing vault per the attached drawing. The value for the sidewalk was paid under the contract unit price, however, due to a delayed response by the City of San Diego the contractor incurred additional costs and is now being compensated for those cost. This change order includes all additional labor costs and will be paid in addition to the contract unit cost for sidewalk. Original Contract Amount $ 201,000.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Wor g days added: 0 Working days subtracted: 0 Percent change in Contract to date 13.42% Sub it -d by: t Manager oved by: cf—z-7-/L Date 25,511.80 226, 511.80 1,463.00 $ 227,974.80 City Project Manager Date City.Engineer Date City Manager, required for Change orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract dojuments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepteded to by (Contractor's name): -4 Nae re2e_A. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 L WWII* 4.0101•11110 ©AD SIGN VENT® +91.60, 35.91' LT FS: (164.32) +96.23, 36.09' LT FS: (164.33) PVI: +04.28 TC, 32.69' LT 184 00 FG: (164.28)± +33. EX I +09.27, 32.84' LT TC: (164.15)± +09.27, 32.60' LT FL: (163.72)± +09.27, 30.34' LT FG: (163.79)± 6 ►^ CALIFORNIA -- NATIONAL CITY i 1: i;i :/ iICORPORATED Paradise Valley Road Pedestrian and Drainage Enhancements CIP No: 15-03 Contractor: Just Construction, Inc. CHANGE ORDER NO. 5 March 21, 2016 Reason/Purpose for this Change Order. The city directed the contractor to hydro -seed the disturbed areas on the plans noted within the grading limits, an additional slope repair location and misc. locations for a total of 45,000 sf of disturbed area. The City of National City and Contractor agree to the following change to the original Contract: The contractor shall hydro -seed as directed the area located behind the new city sidewalk labeled grading limits (8,500 sf), the slope behind the new sidewalk at the slope repair (1,500 sf), and approximately 20,000 sf of additional misc. area. The contractor is responsible to hydro -seed at his expense an additional 15,000 sf of area disturbed during his grading operation on the site. This change order includes all labor, equipment and materials needed to complete all work described above and as detailed in the attached exhibit. Original Contract Amount $ 201,000.00 Net change by previously authorized Change Orders 26,974.80 Subtotal 227,974.80 Amount of this change order 2,738.15 New contract amount Working days added: 10 [Submed by: $ 230,712.95 Working days subtracted: 0 Percent change in Contract to date 14.78% City Project Manager Date ECityngineer Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents .II costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, onds, in u -nce, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract docents aO< corporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted fandiagn ontractor's name): Name: .ec -zw /49/7te.40 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 Part of area disturbed by contractor either by storing equipment, spoils or debris. Approx. 15,000 sf Additional area to be sprayed and compensated by city. Area undisturbed with existing vegetation will not need to be sprayed. Approx. 20,000 sf Hydro -seed approximately 5' behind SW and in the SD area will be paid by city under a change order and shown on the plans as grading limits. Approx. 8,500 sf Hydro -seed in this area will be paid by city under a change order. Approx. 1,500 sf This area delineated as grading limits on plans will be paid by the city. Part of the approx. 8,500 sf This area will need to be hydro -seeded as your electrical contractor removed all existing vegetation during his electrical excavation in lieu of trenching along the back of sidewalk. Part of the 15,000 sf to be paid by contractor. JUST CONSTRUCTION, INC. 3103 Market Street San Diego, CA 92102 Phone: 619-702-7220 Fax: 619-702-7110 License # 968910 ATTN: Sean Gill, ICCS TO: City of National City 1243 National City Boulevard National City, CA 91950 TRANSMITTAL LETTER Contract No. Date: 04/26/2016 CIP 15-03 Paradise Valley Road Pedestrian & Ref: Drainage Enhancements CIP 15-03 Subject: Signed CCO#03, #04 & #05 WE ARE SENDING YOU: ®Attached ®Delivered via: Hand Delivered THE FOLLOWING: ❑Copy Of Letter ❑Plans ❑Specs ❑Other FOR YOUR: ❑Information ®Review & Comment ['Distribution As Requested COPIES DATE DESCRIPTION Original 04/26/16 Signed Contract Change Orders No. 03, 04, and 05 REMARKS ❑No Response Required Should you have any questions concerning the above, please contact Sonia Garcia at (619) 702-7220. Received By: Title cc: ❑Jobsite ❑Office ❑Other: ❑ File CALIFORNIA — NATIONAL CfT) IT`CORPORATED Paradise Valley Road Pedestrian and Drainage Enhancements CIP No: 15-03 Contractor: Just Construction, Inc. Reason/Purpose for this Change Order. CHANGE ORDER NO. 6 April 29, 2016 Per the contractor specifications the contractor is entitled to his Bond Cost. The City of National City and Contractor agree to the following change to the original Contract: 1 % bond cost on $29,712.95 of cumulative change orders for a total of $297.13. Original Contract Amount $ 201,000.00 Net change by previously authorized Change Orders ... 29,712.95 Subtotal Amount of this change order New contract amount...... 230,712.95 297.13 $ 231,010.08 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 14.93% S bml ed by: Citngineer Date City Manager, required for Change Orders>$24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents le incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and ag edContractor's name): Name: „4047eic ,4- g9iX.67lee Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 ole..:4E HPokATEII CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk JUST CONSTRUCTION Change Order #3 - #6 Paradise Valley Road Pedestrian and Drainage Enhancements Judy Hernandez (Engineering/PW) Forwarded Copy of Change Orders to Just Construction