HomeMy WebLinkAbout2016 CON M.A. Stevens Construction - Library Improvements SP 15-08 - Change Orders #3 through #6National City Library Remodel
CIP #15-08
Contractor: M.A. Stevens Construction, Inc.
Reason/Purpose for this Change Order:
Various Changes to Contract Scope
CONTRACT CHANGE ORDER NO. 3
January 6, 2016
The City of National City and Contractor agree to the following change to the original Contract:
1. Provide all labor, equipment and material required for CHANGE SOIL PREPARATION
REQUIREMENTS PER SUBMITTAL #22R dated 12-9-15 and MA Stevens Construction
PCO #7 dated 12-22-15 =
2. Provide all labor, equipment and material required for DISCONNECT/RECONNECT
CABLES AT 33 ROUND TABLES per RFI #17 and MA Stevens Construction PCO #8
dated 12-22-15 =
$996.98
$13,165.89
3. Delete all labor, equipment and material required for DELETE BID ITEM #8
INSTALLATION OF OWNER FURNISHED SECURITY CAMERAS per MA Stevens
Construction PCO #9 dated 12-22-15 =
($13,231.00)
4. Delete all labor, equipment and material required for DELETE SHELF END PANELS
per MA Stevens Construction PCO #10 dated 12-22-15 =
5. Delete all labor, equipment and material required for DELETE RFID INSTALLATION
per MA Stevens Construction PCO #12 dated 12-29-15 =
($173.42)
1
($3,642.00)
6. Provide all labor, equipment and material required for REMOVE EXISTING LIGHT
FIXTURE AT CONCRETE BENCH per RFI #19 Response dated 12-18-15 and MA
Stevens Construction PCO #13 dated 12-30-15 =
7. Provide all labor, equipment and material required for REMOVE CONCRETE LUG AT
LANDSCAPING per MA Stevens Construction PCO #14 dated 12-31-15 =
8. Provide all labor, equipment and material required for REPAIR EXISTING PLASTIC
LAMINATE AT LOW WALL per RFI#22 Response dated 12-24-15 and MA Stevens
Construction PCO #15 dated 12-30-15 =
9. Provide all labor, equipment and material required for REPAIR EXISTING PLASTIC
LAMINATE AT STOREFRONT DOOR per RFI#21 Response dated 12-24-15 and MA
Stevens Construction PCO #16 dated 12-30-15 =
10. Provide all labor, equipment and material required for WALL COVERING IN
COUNCIL CHAMBERS PER ASI #1 and MA Stevens Construction PCO #17 dated 1-5-
16 =
11. Provide all labor, equipment and material required for CHANGE RFID WALL
OPENING per RFI #29 Response dated 12-28-15 and MA Stevens Construction PCO
#18 dated 1-5-16 =
12. Delete all labor, equipment and material required for DELETE BID ITEM #5 ART
FENCE EXTENSION AND ART TILES =
$813.34
$962.54
$11,460.75
$2,305.65
($50,000.00)
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
Library Remodel-CIP 15 08 CCO#3 dated 1-6-16 Page 2 of 2
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0 Working days subtracted: 0
Prepared by: DUDEK-CM Eric Honour
Construction Manager
Approved by:,
40,
Date
$829,232.00
$73,638.75
$902,870.75
($36,708.15)
Percent change in Contract to date 4.45%
$866,162.60
City Project Manager
Date
Cry Engine 1 Date
City Manager, required for Change Orders >$24,999 Date
Bsigning this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by M.A. Stevens Construction, Inc.
.._.._...__� Date ri Y<f
Name.
Note to Contractor: If you do not agree wi this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
National City Library Remodel
CIP #15-08
Contractor: M.A. Stevens Construction, Inc.
Reason/Purpose for this Change Order:
Modify door and frame design to accommodate existing conditions.
The City of National City and Contractor agree to the following change to the original Contract:
1. Provide all labor, equipment and material required for CHANGE STOREFRONT
DOOR AND FRAME per RFI #34 Response dated 1-15-16 and MA Stevens
Construction PCO #22 dated 1-20-16 =
Original Contract Amount
CONTRACT CHANGE ORDER NO. 4
January 27. 2016
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Contract days added: 0
$11,751.88
$829,232.00
$36,930.60
$866,162.60
$11,751.88
$877,914.48
Prepared by: DUDEK-CM Eric Honour
Construction Manager
Approved by:
Percent change in Contract to date 5.87%
"1 (4
Date City Project Manager Date
-7- «O
C i y Engineer Date City Manager, required for Change Orders>S?4,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved. Contractor will provide al of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work. including but not limited to all equipment, materials. labor:
supervision, overhead, fees. bonds, insurance. profit. etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by M.A. Stevens Construction. inc.
Name:1
//Zpate/�
Note to Contractor If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
REQUEST FOR INFORMATION
RFI No. 34
SUBJECT: Storefront Door Header
PROJECT: National City Library Remodel
TO: Eric Honour
FROM: Mark Stevens
Drawing Reference: N/A
Specification Reference: N/A
Cost/Schedule Impact: Yes/Yes
DATE:
12/30/15
Response Needed by: URGENT
Contractor is requesting Clarification: Please provide a detail for the storefront door header and how it is to
mate with the existing curtain wall. Please also provide waterproofing details based on patio door installation
sketch 12/28/15.
Contractor's Recommendation and Reason for Changes: Please provide.
CM's Response/Direction:
Please see attached revised sketches.
DUDEK-CM
1-15-16
Response By:
Date:
E. Smalley & Company
1,34 !, 1
Cccf t
tacC&
se...oktatE`
craic
ktJ
‘41
tstto-\F
tli,k-q005‘(
Since 1967
C ,
A
Coatings Concrete Restoration
Fire coping' Seaerts Waterproofing
Altouquenzue
;KA,
—71
i3V1 77-Wei
tukkrom
,,W5tt
Oncwie Ph
ID,915454, eu:.27,7).att
Ia. 1 T.,%,;`Er•
SItLICy
i41, 24-
135e-571.124
9,5!.
Van Nuys
www.smalleyandcompany.com
EA Smalley & Complany since
m
w nOnzontai header mu8
railel in front of new heador
41
ad
ght of ttonaontoilO
-
n7 panel
ew nonmr.tat Mottler rriMO^ fl
ex7511719 vertiCa: muMM system,'
cxT.ting honzomai
muE,m7,"?
L ,
77777 777 7 7-'7 n42
7,1 7 7
0,1,t1-1A'
tf.kr,7,7k,
4
t,77.777
t L.
Coatings Concrete Restoration Firestopping* Sealants Waterproofing
I
n.--.!..-.;..,.,.. 77.4 117,47 ''.' '7, 'CZ ,39-81.37 m 78S717805450 la. ,sc,:77,2a7773co77. in.
1
'77 ' 77 VW, tiVt 7i7t5 V: t -.7.4a 97,77, 3X-7 3(77.7 0,83.18.7.7 ,U.g..` 912.90.7
173-777777 3715 7,4c7-71,00 V/ 75i t88,10 01 4770 8071-8543 643-384,71713 8
U0V01718 Ontario 1 Pheeen Bak La
-4i
Dewy Merlon
,FIX!,,i7 SiF.
:57M-737,77777 4.
www.smalleyandcompany.com
cy
vim
858- 37 8167,4,37773
:77Mtstin, 1777,717.7 77.3.
fal 4,3757.14% fto 7,37n,"7% 7- 77 t
M.A. STEVENS
CONSTRUCTION
125 E 17th Street
National City, CA 91950
Office: (619) 477-7893
Fax: (619) 477-7895
License No.: 504693
CIP No. 14-08 National City Library Remodel Project
1401 National City Blvd., National City, CA 91950
Owner:
City of National City
1243 National City Blvd.
National City, CA 91950
i
i
Construction Manager:
DUDEK Construction Management
1645 S. Rancho Santa Fe Rd., Ste. 201
San Marcos, CA 92078
i
PCO #: I 22 CONTRACT EXTENSION: ITBD
DATE: 1/20/16 'REVISED: I 'REVISED:
DESCRIPTION: I Furnish and Install additional curtain wall framing, break metal, flashing, and
sealant.
1. GENERAL CONTRACTOR MATERIAL
SUBTOTAL
$
OH&P 15%
2. GENERAL CONTRACTOR LABOR
Supervision -
2 days x $80 per hour =
SUBTOTAL
OH&P 20%
$ 1,280.00
$ 1,280.00
$ 256.00
3. GENERAL CONTRACTOR EQUIPMENT
SUBTOTAL
OH&P 15%
TOTAL GENERAL CONTRACTOR
SUBCONTRACTOR MATERIAL
Sun Pacific Glazing -
See attached
SUBTOTAL
$ 1,536.00
SUBCONTRACTOR LABOR
Sun Pacific Glazing -
See attached
OH&P 15%
SUBTOTAL
$ 4,520.10
$ 4,520.10
$ 678.02
SUBCONTRACTOR EQUIPMENT
OH&P 20%
SUBTOTAL
$ 3,776.08
$ 3,776.08
$ 755.22
TOTAL SUBCONTRACTOR
GRAND TOTAL
OH&P 15%
GC OH&P 5%
9,729.41
486.47
11,751.88
APPROVED:
COMPANY
DATE
i
SUN PACIFIC GLAZING, INC.
747 Grand Ave
Spring Valley, CA 91977
Date: 1/14/2016 Change Order #01
To: MA Stevens
Attn: Dawn A.
Project: National City Library
Ref: Change Order #01: New curtain wall frame
Change Request
LICENSE NO. 777178
Phone # 619-303-7182
Fax # 619-303-7212
For Changes resulting from:
Patio door installation sketch
Description of work:
Cost to furnish and install additional curtain wall framing, break metal, flashing, and sealant.
Cost Break Down:
Material:
$2,387.88
Curtain wall material $273.88
Flashing and break metal $1,050.00
Paint setup fee and paint $78.00
Caulk $260.00
Freight $98.00
Glazing Tape, backing rod, alcohol, and rags 4,146.88
Subtotal $
Tax 0.900% $373.22
Subtotal $4,520.10
Labor:
$1,618.32
Fabrication (24) Hours $1,618.32
Installation (24) Hours $539.44
Additional Site Visits and Design Work (8)
Overhead 15%
Subtotal
Total
By signing below, I approve Change Order #01 for the stated amount and authorize Sun
Pacific Glazing, Inc. to proceed with the ordering of materials and installation and
this change order will be incorporated into the subcontract Agreement.
x
Signature
$3,776.08
$1,244.43
$9,540.61
Date
National City Library Remodel
CIP #15-08
Contractor: M.A. Stevens Construction, Inc.
Reason/Purpose for this Change Order:
Modify door and frame design to accommodate existing conditions.
CONTRACT CHANGE ORDER NO. 5
March 7, 2016
The City of National City and Contractor agree to the following change to the original Contract:
1. Provide all labor, equipment and material required for ADD CHAIRS AT COUNCIL
CONFERENCE ROOM per MA Stevens Construction PCO #34 dated 3-4-16 =
$13,895.73
2. RETURN SPECIFIED STAIR TREADS FOR CREDIT per MA Stevens Construction
PCO #24 dated 1-20-16 =
($2,403.37)
3. Delete all labor, equipment and material required for DELETE ORIGINALLY
SPECIFIED STOREFRONT DOOR per MA Stevens Construction PCO #25 dated 2-1-16
4. Provide all labor, equipment and material required to REPAIR CARPET AND
JUNCTION BOX AT COUNCIL DIAS per MA Stevens Construction PCO #27 dated 2-1-
16 =
L
($2,700.00)
$667.48
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Contract days added: 60 Working Days
New Completion Date = May 3, 2016
Prepared by: DUDEK-CM Eric Honour
Construction Manager
Approved by:
7
CitydEngineer
$829,232.00
648,682.48
$877,914.48
$9,459.84
Percent change in Contract to date 7.01 %
Date C. Project nager
$887,374.32
Date City Manager, required for Change Orders >$24.999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by M.A. Stevens Construction, Inc.
(411 I ILA/
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
M.A. STEVENS
CONSTRUCTION
125 E 17th Street
National City, CA 91950
Office: (619) 477-7893
Fax: (619) 477-7895
License No.: 504693
CIP No. 14-08 National City Library Remodel Project
1401 National City Blvd., National City, CA 91950
Owner:
City of National City
1243 National City Blvd.
National City, CA 91950
Construction Manager:
DUDEK Construction Management
1645 S. Rancho Santa Fe Rd., Ste. 201
San Marcos, CA 92078
PCO #:
34
CONTRACT EXTENSION:
TBD
DATE:
3/4/16 REVISED:
REVISED:
DESCRIPTION: Purchase and delivery of of additional chairs
1. GENERAL CONTRACTOR MATERIAL
$ 12,083.24
GM Interiors -
See attached
SUBTOTAL
$ 12,083.24
OH&P 15%
$ 1,812.49
2. GENERAL CONTRACTOR LABOR
SUBTOTAL
$ -
OH&P 20%
$ -
3. GENERAL CONTRACTOR EQUIPMENT
SUBTOTAL
$ -
OH&P 15%
$ -
TOTAL GENERAL CONTRACTOR
$ 13,895.73
SUBCONTRACTOR MATERIAL
SUBTOTAL
$ -
OH&P 15%
$
SUBCONTRACTOR LABOR
SUBTOTAL
$ -
OH&P 20%
$ -
SUBCONTRACTOR EQUIPMENT
$
;UBTOTAL
$ -
OH&P 15%
$ -
TOTAL SUBCONTRACTOR
$ -
GC OH&P 5%
$ -
GRANDTOTAL
$ 13,895.73
APPROVED:
DATE
COMPANY
. 3/2/2016 Webmail 6.0- Inbox
From: "Eric Honour" <eric.honour@hotmail.com>
Subject: Library Remodel -City Hall Conference Room Chair
Sent date: 03/01/2016 05:32:22 PM
To: "mastevensinc@sbcglobal.net"<mastevensinc@sbcglobal.net>,
"gneville@mastevensconstruction.com"
<gneville@mastevensconstruction.com>, "Dawn Andalora"
<d a nd al o ra @mastevensconstruction.com>,
"dstevens@mastevensconstructi on.com"
<dstevens@mastevensconstruction.com>
Cc: "jlopez@nationaicityca.gov" <jlopez@nationalcityca.gov>, "Nick Minicilli"
<nick.minicilli@stctraffic.com>, "Jason M. Linsdau" <jlinsdau@dudek.com>,
Inline content has been blocked for your safety.
Show content
Mark,
Please see the following email and attached quote from GM Interiors for the new chairs in the large city
council conference room.
Please provide a cost proposal for purchase and delivery of the chairs as indicated.
Thank You,
DUDEK-CM
Eric Honour
760-798-9095 Office
760-889-7429 cell
From: Jose Lopez <jlopez@nationalcityca.gov>
Sent: Tuesday, March 1, 2016 5:12 PM
To: Eric Honour
Cc: Nick Minicilli; Jason M. Linsdau; glitzinger@dudek.com; chorwat@fpbarch.com
Subject: City Hall Conference Room Chair
Eric,
The City has selected the attached chair and "Chinchilla" color(dark grey) to be used in the Large Conference Room.
Please request a cost proposal from MA Stevens to purchase these chairs.
httpifwww.krug.ca/pdf/Luxe Card.pdf
LUXE -
<rug
www.krug.ca
LUXE WhiteCream FL3822 FL6003 Parchment Sandstone Vanilla FL0605 FL0608 FL0061 Taupe Tan
Mocha ChocolateChestnutBlack Bisque FL3948 FL0808 FL0802 FL0087 ...
httpsJ/websitesmai I .att.comt#/mail/
1/2
CIM
Business Interiors
"Elevate ,your Workplace`
Project ID / Who & Where
KUNA MUTHUSAMY
TO:
CITY OF NATIONAL CITY
1243 NATIONAL CITY BLVD
ACCOUNTS PAYABLE
NATIONAL CITY
KUNA MUTHUSAMY
Product Counts:
Systems
CA 91950
Phone: (619)336-4383
Fax:
0 Desk Units 0 Tables
3/1/2016
Quotation
121218
NATIONAL CITY (CITY OF NATIONAL CITY)
1243 NATIONAL CITY BLVD
NATIONAL CITY CA 91950
KUNA MUTHUSAMY Phone: (619)336-4383
Fax:
t; Files Chairs 1f' Storage
Ancillary
Product Summary / Scope of Work
QUOTE FOR: KRUG CADENCE TASK CHAIRS
FOR: KUNA MUTHUSAMY
LEAD-TIME: 4-6 WEEKS
SCOPE OF WORK:
1) G/M TO RECEIVE AND INSPECT.
2) G/M TO SET INTO PLACE.
3) PLEASE CONTACT KUNA MUTHUSAMY TO SCHEDULE SERVICES.
Who/What/Where
LOT 1 SEATING
(18) EA KRUG CADENCE TASK CHAIRS
Mt See Attached till of Materials
List List Ext Sell Sell Ext
19,710.00 19,710.00 10,532.52 10, 532.52
Non -Tax Srvcs. Taxable Srvcs. Freight Design Fee
.00 .00 .00 .00
Account Executive: Josh Nottingham (/nottingham@gmbi.net)
AMA: EIIe Warehall (ewarehalln,_gmbi.net)
800-686-6583 619-236-0500 Fax: 619-236-0550
G/M Business Interiors
110 W. A Street, Suite 140, San Diego CA, 92101
Project PAS:
Page: 1 of 1
G/M
Quotation #..121218
LOT
Who/What/Where
1 Z G/M Services
G/M Furniture Planning Services, if applicable, include field
measurements, drawing AutoCAD building shells, developing
typical workstations and private office standards, space
planning typicals into the floorplan, developing furniture color
schemes, order specifications and receiving client approvals for
all drawings and color schemes for order entry.
G/M Project Management Services include drawings and field
measure checks, order scheduling & routing, electrical
consulting with contractors,field checks,monitoring construction
progress along with delivery, assembly, punchlist coordination
through final completion.
G/M Project Services include receiving and inspecting of each
product, shipping damage adjudication with vendors,
transporting product if applicable, staging of products, delivery,
setting in place of all furniture, level clean and polishing of all
items, vacuum floors and recycling of all waste products
associated with the furniture project.
G/M Punchlist Services include formulation of the project
punchlist, ordering and receiving of punchlist products, and
delivery and assembly to finalize the punchlist and project.
G/M Warranty Services Department is provided to offer clients
our no -charge warranty service work for all furniture protected
under valid factory warranties. G/M maintains electronic copies
of our Client's invoices for warranty enforcement. For service
requests, our Warranty Department may be contacted via e-mail
at warranty@gmbi.net
List List Ext
.00 .00
Sell Sell Ext
.00 .00
Non -Tax Srvcs. Taxable Srvcs. Freight Design Fee
463.58 127.72 .00 .00
Account Executive: Josh Nottingham (jnottinghamAgmbi.net)
AMA: Elle Warehall (ewarehalt(gmbi.net1
800-686-6583 619-236-0500 Fax: 619-236-0550
G/M Business Interiors
110 W. A Street, Suite 140, San Diego CA, 92101
http riwww m ;
Project PAS:
Page: 2 of 2
G/M Quotation # 121218
•
t1l'1'I'1'1'
1111IIiI, IIII
'1',11p
'II
Mirr III III
III II
1iII 1111
Entire Quotation Valid for 60 Days
Services (Taxable)
Freight (Taxable)
Services (Non -Taxable)
Project App. Spec. (Non -Taxable)
Taxable u
Non -Taxable Subtot
Sales Tax (9.000%)
Total:
$10,532.52
$127.72
$0.00
$463.58
$0.00
$10,660.24
$463.58
$959.42
$12,083.24
Net 30 Days Terms with Purchase Order 100% $12,083.24
I have reviewed the quote, the bill of materials, the drawings (if applicable), the color cards (if applicable), and other
associated exhibits for my order. Color Selection = Chinchilla FL6009
• I approve the colors, fabrics, and finishes as previously selected and correct as shown on the attached exhibit.
• I am satisfied that the product I have selected is the correct size and is suitable and will perform for its indended
purpose.
• I am aware this product is manufactured to order and is not returnable to G/M or to the manufacturer.
• I understand that legal title to the product will transfer upon delivery to my commercial or residential location and all
associated labor is taxable until title transfers.
• I am aware additional costs charged for inside delivery, staging, setting in place, assembly, leveling, cleaning, polishing,
recycling of waste materials are separately stated and are elected as an additional contract option.
I I am aware of the grand total price of this contract as shown on this quote.
Approved by:
Signature
Print Name/Title Date
Account Executive: Josh Nottingham (jnottingham(a�gmbi.net)
AMA: Elle Warehall (ewarehallAgmbi.net)
800-686-6583 619-236-0500 Fax: 619-236-0550
G/M Business Interiors
110 W. A Street, Suite 140, San Diego CA, 92101
http://www.gmbi.net
Project PAS:
Page: 3 of 3
2A
0
CITY OF NATIONAL CITY 3/1/2016
KUNA MUTHUSAMY 11:09:52 AM
Quote # 121218
Department: SEATING
PO #
Sales Order # Discount %
Item
Qty Product
List Price Sell Price
Unit Extended Unit Extended
SEATING
KRUG
1
18 CAD1MW21B 1,095.00 19,710.00 585.14 10,532.52 46.56 %
Cadence Tilter with fixed urethane arms, Adjustable height back,
Medium Frame,
Casters • • Standard
Base and Frame • • Medium Black
Upholstery • • Grade 2 Luxe Vinyl, Black Chinchilla FL6009
Tag: SEATING
Product Subtotal: $10,532.52
Account Executive: Josh Nottingham Project PAS: Page: 1
AMA: Elle Warehall
M.A. STEVENS
CONSTRUCTION
125 E 17th Street
National City, CA 91950
Office: (619) 477-7893
Fax: (619) 477-7895
License No.: 504693
CIP No. 14-08 National City Library Remodel Project
1401 National City Blvd., National City, CA 91950
Owner.
City of National City
1243 National City Blvd.
National City, CA 91950
Construction Manager:
DUDEK Construction Management
1645 S. Rancho Santa Fe Rd., Ste. 201
San Marcos, CA 92078
PCO #:
24
CONTRACT EXTENSION:
TBD
DATE:
1/20/16 'REVISED:
REVISED:
DESCRIPTION:
Credit for original stair treads that were returned to the manufacturer
1. GENERAL CONTRACTOR MATERIAL
SUBTOTAL
$ -
OH&P 15%
$ -
2. GENERAL CONTRACTOR LABOR
SUBTOTAL
$ -
OH&P 20%
$ -
3. GENERAL CONTRACTOR EQUIPMENT
SUBTOTAL
$ -
OH&P 15%
$ -
TOTAL GENERAL CONTRACTOR
$ -
SUBCONTRACTOR MATERIAL
$ (3,204.50)
$ 801.13
A & S Flooring-
- Credit for stair treads
Restocking fee
SUBTOTAL
$ (2,403.37)
OH&P 15%
SUBCONTRACTOR LABOR
SUBTOTAL
$ -
OH&P 20%
$ -
SUBCONTRACTOR EQUIPMENT
SUBTOTAL
$ -
OH&P 15%
$ -
TOTAL SUBCONTRACTOR
$ (2,403.37)
GC OH&P 5%
GRAND TOTAL
$ (2,403.37)
APPROVED:
COMPANY
DATE
1/20/2016
Webmail6.0- Inbox
From:
Subject:
Sent date:
To:
Attachments:
"Steve Harmon" <steve@asflooring.com>
National City Library, stair treads
01/19/2016 09:55:39 AM
"Dawn Andalora"<dandalora@mastevensconstruction.com>
Burke strair tread credit.jpg [ 408 KB ]
Dawn -
See attached Burke invoice for the stair treads with the total credit, $2,403,38, with the 25% restocking charge.
The stair nosing, tile and risers have been ordered, just waiting for confirmation so we can start pushing to move
production up.
State qvwkok
A and S Flooring
2461 Fenton St.
Chula Vista, Ca. 91914
tele 619-585-8057
fax 619-585-7055
There is a big image in the attachments: Burke strair tread credit.jpg, size: [ 408 KB J. Please choose an
action:
en scaled image preview. Open non -scaled image preview.
Mips://websitesmail.att.com/#k/mail!
1/1
_trt_ib la AN IVIlit.t
R Funsten & Co. TOM D OF FY COMPANY
Wink:sale Flooring Pnuloccs wiiou.3 ALE 11.00P-ING PRODUCTS
Corporate headquarters
b2tto watt coin Suitt B • Patrol cattforma 94534
Row Ail IVO3 • Far 707.86'3.8339
DATE
1/04/16
SHIP
/04 IF
SHIP VIA
Manteca Ulstrihotton Centel-
1 05 Uslushial P Driw • Manteca, CA 95337
Pk= (2091 425-5375 • Ffac (20% 825-491E
Southwest Diviston
400 E Ball Road • Arab* a. CA 928C5
Phone M21484-7900 • Fax 456784044311
F.O.B. ACCOUNT YOUR P) JOS TERMS
.t 10 DAYS, NE731
I
OUR OR PE ft
REF #
1 -e
LP/SWD/V10 J4 1
BILL TO:
E rlooRINO, INC
2461 FENTON ST
A.:,PWWS0 GOITERREZ
DEULA VISTA
P
001i,
00-21
0
LC
IMO-56993R
l736R
CU 91614_
nESCPIPTITJ",4
Saiesperson: ,XEL SNOON
SHIP TO:
S ST,CORING, rEIC
2461 FE3TOM ST
ALP,HOME0 SOITERE.EZ
euttLas VIEDA
CA 91914
OTV. ORO QTY.
Si) PR 'ICE
5018 AV1 SCULPT MACK 1.04- 110.00
STEP '517R SIDLE (IZA1.
NSERT GREY
50:00 S LPT aECK 20.03
SICR atiALE GRi'a
••••.*••PLAARR rosomoT RED V T STP/P***v**
240.00
20.00
granct 6WD
REMIT $ 4424.27 IF PAID BY 2/02716,1ET /S DOE ST 2/04/16
r
No Seiner/ass! If you would like to receive your invoicesda1y via
e-mall, please call May Nelson at 209-824-710A or e-mail her et
mnelsonabrfunsteb.com to be set up for daily invoices by e-tail.
ZAMMIABW1401911114117:
•Faireisia. CUarekile
Ptaae TO/.1',0-1301! • .- 7C11.36.1t;:e2g
REMITTO:
dFUNSTEN DUFFCO
q34426
PO BOX 39000
BAN FRANCISCO
WtiOt.ESAIE 1COUN PRODUCTs
Sas= Oisabstioa Caller
ley Word Pat ()give • Alipateca. CA 95.337
moo au% L.7,-5375 • Fat Mg art-491A
StID
CA 94139-0300
SNMwaiti7Wsion
*) 4al! Raul • km•aa4. C,s; ;.•;-.;Tgi
n.r.4 amqmps•Elor ;567, 40,44
Remit $
LE
4.650
AW140,47
.4.650
451;7171T1
13
eco
1Rts-Tc4-- te..,:ixt
T.
es:arts .• 2,40 , 38
TOTAL ?RICE "4
SALES ThX ...414.4.11;10
TOTA1, 7O4OSNT DUE $ Worr044.46
ACCT INVOICE GATE
300591
138143
1/04/16
TOTAL PRVCE $ •Wwitiloiwitta•-•
SALES TAX
TrT.EAF., AMOUNT Di3R $ •;4941114Priarp.
4424.27 IF PAID DV 2/03/IS,NET IS DOE BY 2/04/16
M.A. STEVENS
CONSTRUCTION
125 E 17th Street
National City, CA 91950
Office: (619) 477-7893
Fax: (619) 477-7895
License No.: 504693
CIP No. 14-08 National City Library Remodel Project
1401 National City Blvd., National City, CA 91950
Owner
City of National City
1243 National City Blvd.
National City, CA 91950
Construction Manager.
DUDEK Construction Management
1645 S. Rancho Santa Fe Rd., Ste. 201
San Marcos, CA 92078
PCO #:
25
CONTRACT EXTENSION:
TBD
DATE:
1/28/16 !REVISED:
REVISED:
DESCRIPTION:
Credit for Original Storefront Doors
1. GENERAL CONTRACTOR MATERIAL
$
2,347.83
Credit for Original Storefront Doors
SUBTOTAL
$
2,347.83
OH&P 15%
$
352.17
2. GENERAL CONTRACTOR LABOR
SUBTOTAL
$
-
OH&P 20%
$
-
3. GENERAL CONTRACTOR EQUIPMENT
SUBTOTAL
$
-
OH&P15%
$
-
TOTAL GENERAL CONTRACTOR
$
2,700.00
SUBCONTRACTOR MATERIAL
SUBTOTAL
$
-
OH&P 15%
SUBCONTRACTOR LABOR
SUBTOTAL
$
-
OH&P 20%
$
-
SUBCONTRACTOR EQUIPMENT
SUBTOTAL
$
-
OH&P 15%
$
-
TOTAL SUBCONTRACTOR
$
-
GC OH&P 5%
GRAND TOTAL
$
2,700.00
APPROVED:
COMPANY
DATE
M.A. STEVENS
CONSTRUCTION
125 E 17th Street
National City, CA 91950
Office: (619) 477-7893
Fax: (619) 477-7895
License No.: 504693
CIP No. 14-08 National City Library Remodel Project
1401 National City Blvd., National City, CA 91950
Owner:
City of National City
1243 National City Blvd.
National City, CA 91950
Construction Manager:
DUDEK Construction Management
1645 S. Rancho Santa Fe Rd., Ste. 201
San Marcos, CA 92078
PCO #:
27
CONTRACT EXTENSION:
TBD
DATE:
1/28/16 'REVISED:
REVISED:
DESCRIPTION:
Time and Material - Remove
float existing floor to cover existing floor data boxes.
and replace carpet tile at floor data boxes,
1. GENERAL CONTRACTOR MATERIAL
SUBTOTAL
$
-
OH&P 15%
$
-
2. GENERAL CONTRACTOR LABOR
$
199.11
3 hours x $66.37 per hour (Labor, Group #1)
See attached extra work ticket / daily
SUBTOTAL
$
199.11
OH&P 20%
$
39.82
3. GENERAL CONTRACTOR EQUIPMENT
SUBTOTAL
$
-
OH&P 15%
$
-
TOTAL GENERAL CONTRACTOR
$
238.93
SUBCONTRACTOR MATERIAL
$
81.10
A & S Flooring -
See attached.
SUBTOTAL
$
81.10
OH&P 15%
$
12.17
SUBCONTRACTOR LABOR
$
262.40
A & S Flooring -
See attached.
SUBTOTAL
$
262.40
OH&P 20%
$
52.48
SUBCONTRACTOR EQUIPMENT
SUBTOTAL
$
-
OH&P 15%
$
-
TOTAL SUBCONTRACTOR
$
408.15
GC OH&P 5%
$
20.41
GRAND TOTAL
$
667.48
APPROVED:
COMPANY
DATE
A&S Flooring
Request For Change Order
1/21/2016 10:01
GENERAL CONTRACTOR: M A Stevens Construction
ATTN: Dawn Andaiora
DESCRIPTION:National City, city hall council chamber and conference room.
Remove and replace carpet tile at floor data boxes, float existing floor to cover existing floor data boxes.
See attached signed field work authorization.
LABOR
'R1-NUMBER LABOR HOURS HOURLY
CLASSIFICATION X1.0 XI.5 X2 0 RATE
LABOR
COST
journeyman
5 I
52.48
$ 262 40
5
$
TOTAL LABOR
20% OVERHEAD/PROFIT
SUBTOTAL
MATERIALS
MATERIAL DESCRIPTION
QTY
UNITS
UNIT
COST
MA: ERIAL
COST
Webcrete 95
1
bag
$ 16.80
$ 16.80
atex primer
1
gaL
$ 57.60
5 57.60
c _
5
$
TOTAL MATERIAL
9 % SALES TAX
15% OVERHEAD/PROFIT
SUBTOTAL
OTHER COSTS
1REF
DESCRIPTION QTY
UNITS
unity
COST
OTHER COST
1
$
_, I J
r -
I
j $
SUBCONTRACTS
OTHER COSTS:
15% OVERHEAD/PROFIT
SUBTOTAL:
'REF +SUBCONTRACTOR(DESCRIPTION
1
SUBCONTRACT COST
Submitted by: Steve Harmon
ACCEPTED BY:
SUBCONTRACT COST:
5% OM:
TOTAL SUBCONTRACT COST:
$ 262.40
$ 52.48
$ 314.88
5
5
NA
NA
NA
BOND 1% NA
GRAND TOTAL: $ 408.14
DATE:
i
Job Name
C.r+' &tad
Job Address Job Contact
/ z5 eQ,-t (1 54. Felipe .fibL,'L.
1V 01-41-ongu\ C,' -iy M. A. S -1-ealee el.5 Cc,r' 4 .
Specific location of work being done (i.e. building, floor, room, area of room, etc.):
P' Hoor erWe- C.."+c tr CQ,,wc.'i CkcAw,bcr5
Field Work Authorization Form
Job#
2461 Fenton Street
Chula Vista, Ca. 91914
Phone (619) 585-8057
Fax ( 619 ) 585-7055
uC# 801134
Description of work to be performed: C t, Ti (e z Y e F a % y ?c t vv-f T i (LS
rcP!gc-e . F-(caa.-E ar-o wtd 44,.e., ale c4rfcs. P lI gs M
Materials used: a- ba v Pa 4-c L Q4e X f a rio ies
Authorization work
Performed by:
tk. Perez
2. <J
3.
RegularHours
Overtime Hours
Customer Comments
4.
5.
6.
7.
8.
I certify that I hold Authorization to order or change as stated above by the persons contracting the above job with no penalty to
A&S Flooring; payment therefore will be made upon submission of the appropraite billing.
Authorized Customer Signature
Uei . 1`ere�
Form Comp
FP4Ca, O (
Date
i0 .OtL
'Fr-elev.(
# ike/cibis
Customer pproval R erence Number
01 108101.Ot(0
Date Completed
ASI # 1 National City Council Chambers
M.A. STEVENS
CONSTRUCTION
Super: Felipe Soliz
Today's Date: 1 /8/2016
Date of Week: Friday
Report #:
Weather Condition clear
IYVIC.
Name of Employee
Contractor 4Hrs Worked
T-}-e_w. t Felipe Soliz
M.A. Stevens 3
[4-€tAk , . Miguel Perez
ABS Flooring
51
Contractor
Work Performed
M.A. Stevens
Cut the metal data box, attach data wires to panel,repair plywood around metal data box
and put the cover on.
A&S Flooring
Floated aroumd the two Electrical abandon floor outlets, replace carpet and
install carpet around the data box.
i
i
I
Was any material received today to be incorporated into this project? Spec Section, Supplier and Material
CONSTRUCTION DELAYS? Pending RF1's Etc? IYES NO
I
WERE THERE ANY LOST -TIME ACCIDENTS THIS DATE?
YES NO
TOOL BOX SAFETY MEETING HELD?
YES NO
Equipment Used
Subcontractor Using Equipment
Model
Hrs Idle
Hrs Worked
1 Gerbil,- That this rennrt is r. mnlete and correct All enuioment and material used and work completed is in compliance with the contract
plans and specifications General descriptions are used in referenced to the trades being performed_ Please refer to certified payrolls for
DIR prevailing wage trades performed.
Signature
Print Name
Felipe Soliz
. ' 2/1/2016 Webmail 6.0- Inbox
From:
Subject:
Sent date:
To:
Cc:
Attachments:
Mark and Dawn
"Felipe Soliz"<fsoliz@mastevensconstruction.com>
Council chambers
01/06/2016 07:38:44 PM
"Mark Stevens"<mastevensinc@sbcglobal.net>
"Dawn Andalora"<dandalora@mastevensconstruction.com>
3 attachments - Download all attachments [ 374 KB ]
IMG_0106.jpg [ 131 KB ], IMG_0102.jpg [119 KB ], IMG_0103.jpg [125 KB ]
This afternoon I had a walked through with the engineer, 1 think Jose Lopez and Paul, at the
Council Chambers.
There is a couple of items that they want us to do on time and material. Please see the attached pictures.
1. A box with data, they want us to cut the metal box and push the wire against the panel and put the cover
on.
2. Abandon two floor outlets and cover them with carpet.
Also there's a couple of items that need to be repaired by the carpet company.
Best Regards,
Felipe Soliz
Carpenter Foreman / Superintendent
Cell: 619/ 210-3721
Office: 619/ 477-7893
Fax: 619/ 477-7895
fsoliz@mastevensconstruction.com
There is a big image in the attachments: IMG_0106.jpg, size: [ 131 KB I. Please choose an action:
Open scaled image preview. Open non -scaled image preview.
There is a big image in the attachments: IMG_0102.jpg, size: [ 119 KB ]. Please choose an action:
Open scaled image preview. Open non -scaled image preview.
There is a big image in the attachments: IMG_0103.jpg, size: [ 125 KB I. Please choose an action:
Ooen scaled image preview. Open non -scaled image preview.
https://websitesmail.att.com/#/maill
1/1
National City Library Remodel
CIP #15-08
Contractor: M.A. Stevens Construction, Inc.
Reason/Purpose for this Change Order:
Various change orders.
CONTRACT CHANGE ORDER NO. 6 - FINAL
June 7, 2016
The City of National City and Contractor agree to the following change to the original Contract:
1. Provide all labor, equipment and material required for CHANGE STOREFRONT
DOOR INCLUDING EXTERIOR PCC PAVING per MA Stevens Construction PCO #33.1
dated 5-5-16 =
$10,525.33
2. Provide all labor, equipment and material required for CHANGE EXISTING LIGHT
SENSOR IN CHILDREN"S RESTROOMS per MA Stevens Construction PCO #35 dated
5-5-16 =
$455.79
3. Delete all labor, equipment and material required for BALANCE OF UNUSED RFID
ALLOWANCE PER BID ITEM #4 and MA Stevens Construction PCO #36 dated 5-5-16 = ($16,805.79)
4. Provide all labor, equipment and material required for SUPERVISION FOR DELIVERY
AND SET UP OF ADDED CHAIRS AT COUNCIL CONFERENCE ROOM per MA $192.00
Stevens Construction PCO #37 dated 5-5-16 =
5. Provide all labor, equipment and material required fpr RE -INSTALL EXISTING DOOR
LOCKSETS AT 1ST FLOOR RESTROOMS PER CITY REQUEST and MA Stevens $337.71
Construction PCO #38 dated 5-5-16 =
6. Delete all labor, equipment and material required for BALANCE OF UNUSED FIELD
ORDER ALLOWANCE PER BID ITEM #3 = ($9,280.81)
Original Contract Amount
Net change by previously authorized Change Orders
$829,232.00
$58,142.32
Subtotal $887,374.32
Amount of this change order ($14,575.77)
New contract amount $872,798.55
Contract days added: NA Percent change in Contract to date 5.25%
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
Prepared by: DUDEK-CM Eric Honour
Construction Manager Date
Approved by:
/.
City 9ineer
City Project Manager Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the puce stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by M.A. Stevens Construction, Inc.
Name:
Date e frn
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
M.A. STEVENS CONSTRUCTION
Change Order #3 - #6
Library Improvements Project
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Orders to M.A. Stevens Construction