Loading...
HomeMy WebLinkAbout2016 CON Portillo Concrete - Highland Avenue Safety Enhancements Project - Change Order #12•'- CALIFORNIA ^-6- NATIO © L CITY `— tV [NCORPORATE HIGHLAND AVENUE SAFETY ENHANCEMENTS Specification No. 13-07 Contractor: Portillo Concrete, Inc. CHANGE ORDER NO. 12 March 1, 2016 Reason/Purpose for this Change Order: At the intersection of Highland Avenue and 8th Street the SW corner pedestrian ramp/ crosswalk did not meet ADA standards for pedestrian push buttons. One type 1A pole with pedestrian push buttons had to be installed at the above location. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall install type 1A pole with pedestrian push buttons at the SW corner of Highland Avenue and 8th Street. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount $ 1,449,000.23 Working days added: 0 Working days subtracted: 0 1,379,220.00 65,314.02 1,444, 534.02 4,466.21 Percent change in Contract to date 5.06% Submitted by: VL V IC• /1,1c, Dat / i Prect Man er Date Resident ngineer Approved by: Ci ngineer / / Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Portillo Concrete, Inc.: Name: g‘ehr,,/fh,61/a Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 2/6 ate 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 \ \ l / `' CALIFORNIA NATIONAL CiTir O PO INCORPORATED HIGHLAND AVENUE SAFETY ENHANCEMENTS Specification #13-07 DATE: March 1, 2016 CHANGE ORDER NO. 12 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Install 1 type 1A pole at SW corner of Highland and 8th ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Tech 1 Hour 16.00 38.79 620.64 2) Tech 3 Hour 8.00 30.22 241.76 3) Operator Hour 8.00 63.78 510.24 4) Tech 1 Hour 16.00 38.79 620.64 Sub -Total Labor: Labor Surcharge (12%): Labor Markup (20%): TOTAL LABOR: $ 239.19 $ 398.66 $ 2,631.13 MATERIALS Unit Qty Rate Total 1) 1A Pole, bolts, sig frame LS 1.00 1,500.00 1,500.00 2) Pipe, concrete, boxes, wire LS 1.00 1,250.00 1,250.00 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 2,750.00 $ 412.50 $ 3,162.50 Unit Qty Rate Total 1) Chev Silvardo Hour 16.00 33.49 535.84 2) Chevy PU Hour 8.00 33.49 267.92 3) 185 CFM Compressor Hour 8.00 21.33 170.64 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: SUBTOTAL: DEDUCTION FROM CO#8: TOTAL: PRIME CONTRACTOR MARKUP (5%): $ 974.40 $ 146.16 $ 1,120.56 $ 6,914.19 $ 4,253.53 $ 212.68 GRAND TOTAL: $4,466.21 $ 1,993.28 ,. es\011t ' CI? l- fD AU ���``s` CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk PORTILLO CONCRETE Highland Avenue Safety Enhancements Change Order #12 Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Portillo Concrete