HomeMy WebLinkAbout2016 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #3 #4CALIFORNIA NATIONAL Cin ,� INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 3 August 1, 2016 Reason/Purpose for this Change Order: To accommodate the next phase of traffic control the #2 westbound lane on Plaza Blvd from Palm Avenue to N Avenue had to be edge grind to smooth for traffic. Under direction of the Engineer the Contractor proceeded with an edge grind on the #2 lane under time and materials. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with an edge grind on the #2 westbound lane on Plaza Blvd from Palm Avenue to N Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount ... $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount 1,894,498.10 15,142.20 1,909,640.30 1,036.82 $ 1,910,677.12 Working days added: 1 Working days subtracted: 0 Percent change in Contract to date 0.85% Submitted by: ager Date Approved by: Cit ngineer Fit te City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: 'Rut— elitLeSE<::.i'd\frQl.PKACL- D tks,./.4.k. Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL CM y INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification # 16-01 DATE: July 7, 2016 CHANGE ORDER NO. 3 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: Grind uneven pavement #2 lane North side of Plaza Blvd. from Palm Avenue to N Avenue ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 1.00 80.20 80.20 2) 3) Operator Teamster Hour Hour 2.00 1.00 77.60 57.77 155.20 57.77 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ 58.63 $ 351.80 MATERIALS Unit Qty Rate Total 1) Dump Fees LS 1.00 140.00 140.00 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): $ 140.00 $ 11.20 21.00 TOTAL MATERIALS: 72.20 EQUIPMENT Unit Qty Rate Total 1) Bobcat w/ Grinder w/ Sweeper Hour 3.00 43.00 129.00 2) Sweeper attachment Hour 3.00 35.00 105.00 3) Utility Truck Hour 1.00 50.00 50.00 4) Super 10 Wheel Dump Truck Hour 1.00 72.00 72.00 5) Water Truck Hour 1.00 81.00 81.00 $ 437.00 $ 65.55 $ 502.55 $ 10.27 GRAND TOTAL: $1,036.82 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: BOND AND INSURANCE (1%): $ 293.17 4- CALIFORNIA -4- NATIONAL env _. INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 4 August 1, 2016 Reason/Purpose for this Change Order: At the NE corner of Palm Avenue and Plaza Blvd a Palm Tree had to be removed to accommodate the new traffic signal equipment and sidewalk. Under direction of the Engineer the Contractor proceeded under time and materials. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with removing the Palm Tree at the NE Corner of Palm Avenue and Plaza Blvd. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders Subtotal Amount of this change order 16,179.02 1,910,677.12 1,148.68 New contract amount $ 1,911,825.80 Working days added: 1 Working days subtracted: 0 Percent change in Contract to date 0.91% Submitted by: _.__. 97/17/ Date Approved by: rAt-//‘ Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.. .. i t 6 ................... Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL ,Ii, V INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 CHANGE ORDER NO. 4 Specification #16-01 DATE: July 28, 2016 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: Remove and haul off Palm Tree at NE Corner of Palm Avenue ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman Hour 1.00 80.20 80.20 2) Operator Hour 2.00 77.60 155.20 3) Teamster Hour 2.00 57.77 115.54 4) Laborer Hour 2.00 57.63 115.26 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ 93.24 $ 559.44 MATERIALS Unit Qty Rate Total 1) Dump Fee LS 1.00 79.00 79.00 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): 79.00 $ 6.32 11.85 TOTAL MATERIALS: 9 17 EQUIPMENT Unit Qty Rate Total 1) 138 Excavator Hour 2.00 137.00 274.00 2) Super 10 Wheel Dump Truck Hour 2.00 72.00 144.00 Sub -Total Equipment: Equipment Markup (15%): $ 418.00 $ 62.70 TOTAL EQUIPMENT: BOND AND INSURANCE (1%): $ 480.70 $ 11.37 GRAND TOTAL: $1,148.68 $ 466.20 off-`► oir,4f`4; kAFFF, CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk DICK MILLER, INC. Change Orders #3 and #4 Plaza Blvd. Widening "N" Avenue to 1-805 Judy Hernandez (Engineering/PW) Forwarded Copy of Change Orders to Dick Miller, Inc.