Reason/Purpose for this Change Order:
The City requested a proposal from the contractor to replace the ballasts for all non-functioning lights in the
building. The City also requested a proposal from the contractor to provide waterproofing of the parking deck in
areas where it has failed.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for
the price of $19,187.13 and as further described in change order requests 26 and 29, attached.
Original Contract Amount . $ 768,463.00
Net change by previously authorized Change Orders 247,894.75
Subtotal
Amount of this change order
1,016,357.75
19,187.13
New contract amount $
Working days added: 0
Working days subtracted: 0
Percent change in Contract to date 34.76%
1,035,544.88
'mi d y:
P anager
7(Z 06
Date
Resident Engineer
Date
Approved by:
/..
Cit Engineer
7-7& (
Date
City Manager, required for Change Orders>$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by KINSMAN CONSTRUCTION, Inc.
Name:
gd �r ? 7/,Z 4 /2-b/
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
�- CALIFORNIA —0
NATIONAL CITY POLICE DEPARTMENT UPGRADES
Specification #15-06
NATIONAL CiTir
C' aiii
INCORPORATED
CHANGE ORDER NO. 13, Attachment "A"
DATE: July 25, 2016
WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC
DESCRIPTION OF WORK: lighting, waterproofing of parking deck
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1
Replace ballasts at various locations
$ 3,263.08
2
Patch waterproofing at failed areas
$ 15,924.05
3
TOTAL
$ 19,187.13
TO:
KINSMAN CONSTRUCTION, INC
Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
Change Order Request #
PHONE:
JOB NAME:
029
(DATE:
858-634-8180 07/01/16
National City Police Department
LOCATION
1200 Notional City BIM
JOB NUMBER.:
CONTRACT NUMBER:
S5-029
Change Order Request #029
FAX
858-634-8184
Amount
Item No. Description
1. Per David Reed recommendation, patch deck waterproofing at failed areas $11,763.00
$2,084.00
2. Supervision
OH&P
$2,077.05
NOTE: This Change Order becomes part of and in conformance with ii;e existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
DATE
07/01/16
BASE CONTRACT AMOUNT:
(original contract amount)
INCREASE CONTRACT AMOUNT BY:
AUTHORIZED SIGNATURE (CONTRACTOR)
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted.
All work to be performed under same terms and conditions DATE OF ACCEPTANCE
as specified in original contract unless otherwise SIGNATURE (OWNER)
stipulated.
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
$15,924.05
$0.00
$15,924.05
ACS
atihr.ia mint "Na..
CALIFORNIA SEALANT SOLUTIONS, INC.
Office: 619-596-5863 i Fax: 619-596-5867
469 Vernon Way, Et Cajon, CA 92020
www.calsealants.com
PROJECT NATIONAL POLICE STATION EVIDENCE ROOM
CONTRACTOR KINNSMAN CONSTRUCTION
ARCHITECT
DAVID REED CONSULTING
PROJECT No. 15-053
ATTENTION GERARD SHULTZ
DATE
6/23/16
CONTRACT CHANGE ORDER REQUEST NO. 06
No.
Descr
la
Parking deck expansion joint:
install Sika 2CNS u
prep and
r'
Labor = $35
0
lb
z
Materials (Sika 2C
1c
OH&
1d
3a
Parking deck coating that is d
Grind and feather edges and
Primer and then base coat wit
Vulkem 951 in Grey color wit
REPAIR IN DE
N
z
Labor = $3!
3b
3c
Materials (Vulkem Epoxy I
consi.
OH&
3d
Execution of this change order represents a lump
ption
: Remove all (E) joint sealant,
rethane joint sealant. 455 SF
.15 x 100 hrs
and consumables)
P (15%)
amaged down to bare concrete:
then prime with Vulkem Epoxy
h Vulkem 360 and top coat with
h sand broadcasted. NO CRACK
CK. 49 Locations
.15 x 120 hrs
rimer, Vulkem 360/951 and
mables)
P (15%)
TOTAL CONTRACT CHANGE
sum cost for the scope of services
Extra
$5,192.00
$ 3,515.00
$ 1,000.00
$ 677.00
$6,571.00
$4,218.00
$1,496.00
$ 857.00
$11,763.00
Credit
Days
Ext.
5
7
12
identified hereon unless noted otherwise.
CHANGE ORDER AGREEMENT
The undersigned hereby agrees to the above -described amendment of the contract.
David A. Felix
Printed Name of Authorized Representative (California Sealant Solutions, Inc. (CSSI))
Manager 6/23/16
SIGNATURE
TITLE DATE
Printed Name of Authorized Representative (Contractor)
SIGNATURE
TITLE DATE
Original Contract = $48,500.00
Approved Change Orders:
CO#01 = ($11,650.00)
CO#02 = $61,000.00
CO#03 = $35,500.00
CO#04 = $2,350.00
CO#05 = $3,568.00
CO#06 = $2,500.00
Change Order Requests:
COR#06 = $11,763.00
Total Contract w/COs = $141,768.00
OTHER NOTES:
240 LF
Caulking
ROOSEVEL.T AvENUE
49 locations to
prep, base and
top coat with
Vulkem deck
coating
u R 1 1
Raise WP level 6"
NATIONAL CITY BOULEVAIVI
215 LF
Caulking
Hedges need to be
removed for proper
excavation depth.
Lower soil level
as indecated
Where not indicated
soil to be approximately
6" below top of waterproofing
-184
er soil 6"-12"
Soil is to be
approximately
6" below top of
waterproofing
Coating
Height
6" —
12" MEM
1 8"
24" ��
TO:
KINSMAN CONSTRUCTION, INC
Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
st #
026
PHONE:
858-634-8180
DATE:
06/15/16
JOB NAME:
National City Police Department
LOCATION:
1200 National City Bend
JOB NUMBER:
S5-029
I
IFAN:
858-634-8184
CONTRACT NUMBER:
Change Order Request #026
Item No. Description
1. Ballast replacement various locations previously identified and
throughout building
OH&P
Amount
$2,837.46
$425.62
NOTE: This Change Order becomes poi i of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
$3,263.08
DATE
06/15/16
BASE CONTRACT AMOUNT:
(original contract amount)
AUTHORIZED SIGNATURE (CONTRACTOR)
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted.
All work to be performed under same terms and conditions
as specified in original contract unless otherwise
stipulated.
INCREASE CONTRACT AMOUNT BY:
DATE OF ACCEPTANCE
SIGNATURE
$0.00
$3,263.08
(OWNER)
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
SUBCONTRACTOR COST PROPOSAL SUMMERY SHEET -FORM II
Subcontractor Name: K.A. ELECTRIC
REPLACE BALLAST
Cost Proposal Order No. K. A. # 10
NET COSTS: Attach supporting documentation for each line item
COSTS ( 1 )
1. TOTAL NET COSTS ( From Form III)
$2,803.81
2. Royalities, Premits, Utilities, Etc.:
$0.00
3. SUBTOTAL LINES 1 & 2
$2,803.81
4. Insurance: Rate 1.2 % of Line 3
$33.65
5. COST OF EXTRA WORK: This Subcontractor Only. Total Lines 3 & 4
$2,837.46
6. MARKUP FEE: for actual work preformed - 10% of line 5 This Subcontractor Only( 7.3)
$0.00
7. SUBTOTAL THIS SUBCONTRACTOR - Lines 5 & 6
$2,837.46
8. SUMMARY OF COSTS: Lower Tier Subcontractors - Sub - subcontractors ( From Form II Subcontractors
$0.00
$0.00
$0.00
9. SUBTOTAL LINE 8
$0.00
10. HANDLING FEE: Maximun of Line 9
$0.00
11. TOTAL THIS SUBCONTRACTOR: Total Lines 7, 9, & 10 ( carry to line 8 Gen. Contractor Summary Sheet - Forr
$2,837.46
COST BREAKDOWN - Form III
NATIONAL CITY POLICE DEPT
CONTRACTOR OR SUBCONTRACTOR NAME:
•
K.A. ELECTRIC
Prime Contractor
X Sub -Contractor
Sub -Sub Contractor
COST PROPOSAUFIELD ORDER NO. K.A. # 10
JOB/CONTRACT NOS.:
DATE: 3/1/2016
ITEM NO.
DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
TOTAL COST
AMT
UNIT
COST
COST
HOUR
EACH
HRS
LABOR
RATE
COST
HRS
EQ
RATE
COST
ADD
DEDUCT
PROPOSED
COST
ORG. BID COST
1
GYM ROOM 173 1 LAMP T-8
BALLAST
1
$45.00
$45.00
0.5
0.5
$69.98
$34.99
$0.00
2
REPORT WRITING ROOM
143 T-8 2 LAMP BALLAST
1
$45.00
$45.00
0.6
0.6
$69.98
$41.99
$0.00
3
MAIN EVIDENCE 1 LAMP T-8
BALLAST
1
$45.00
$45.00
0.5
0.5
$69.98
$34.99
$0.00
4
PARKING STRUCTURE 2
LAMP T-5 BALLAST
11
$166.54
$1,831.94
0.6
6.6
$69.98
$461.87
$0.00
5
GUN RANGE 2 LAMP T-8
BALLAST
1
$45.00
$45.00
0.6
0.6
$69.98
$41.99
$0.00
6
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
7
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
8
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
9
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
10
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
11
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
12
0
$0.00
$0.00
0
0
$69.98
$0.00
$0.00
TOTAL PAGE 1
$2,011.94
TOTAL PAGE 1
$615.82
TOTAL PAGE 2
$0.00
TOTAL PAGE 2
$0.00
SUB TOTAL
$2,011.94
$0.00
SALES TAX
$176.04
$0.00
TOTAL MATERIAL COST
$2,187.98
LABOR
$615.82
TOTAL $2,803.81
2 OF 6
Exhibit 8
TRA-SERr
TRA-SER Supplier Xchange Productivity Center Downloads
TRA-SER > Search Results > Item Details
Search in:
Main Database
All
for
Help I Alerts ( Bookmark Us ( Contact Us I Loa Out
User: Jeff Howie
Search
Quick Links Saved Searches
Item Details for: IOPA1P32N35M
Manufacturer: PHILIPS ADVANCE
Mfr Brand PHILIPS ADVANCE
Name:
Catalog No.: IOPA1P32N35M
UPC: 781087-08678
GTIN: 00781087086780
TRA-SER PIK: 123716543
Product Name: ELECTRONIC LINEAR FLUORESCENT
BALLAST
Description: F32T8 ELEC BLST
Commodity: 73112 - Electronic Linear
Fluorescent Ballasts
Long HIGH FREQUENCY TYPE; 9.5 INCH L X 1.3 INCH W X 1 INCH H SIZE; -20 DEG F MIN.
Description: STARTING TEMPERATURE; 10 PERCENT MAX. THD; 50/60 HZ FREQUENCY RATING;
UL, CSA APPROVAL; 1 LAMP(S); F32T8 LAMP TYPE; 32 W LAMP WATTAGE; 120 TO
277 V INPUT VOLTAGE; 0.25 AMPERE INPUT CURRENT; PARALLEL WIRING; 32 W
INPUT POWER; INSTANT STARTING TYPE; 0.99 POWER FACTOR; 0.91 BALLAST
FACTOR; ADVANCE[T], OPTANIUM[R] BRAND; USED ON LAMP F17T8, F25T8, F32T8,
F32T8/ES; EFFICIENCY FACTOR 3.25; LEAD LENGTH 35 INCH; TOP MODEL
Mfr ELE BALLAST (I) F32T8 120-277V
Description:
Country Of United States
Origin:
Country of origin information is based on information provided by product manufacturers. Trade service has not
independently verified this information and does not warrant its accuracy.
Last Update: 2013-12-03
Price Status: Active
Issue: 13-48 Symbol: X
Pricing
United States
List:
CoI1:
CoI2: $119.70 Qty2:
Co13: $98.17 Qty3:
Average Market
Price: $18.01
Resale: $88.35
NECA Labor Rates
1
UOM Qty: 1
UOM: EA
Legacy UOM: E
Currency: USD
Pkg Weight: .8 LB
You are not currently authorized to view the NECA labor rates.
Please click here or contact NECA at 301-215-4504 to learn more about NECA labor rah! and/or to
subscribe to the information.
Custom Fields
User
Description:
User Code:
Footnote:
Edit
Price History
United States
Date Coll CoI2 Co13 List Resale AMP UOM
2012-06-06 $119.70 $98.17 $88.35 $18.01 E
2011-05-04 $119.70 $98.17 $196.34 $18.01 E
2011-05-04 $119.70 $98.17 $ $196.34 $18.01 E
2010-09-29 $117.36 $96.25 $192.50 $17.66 E
2010-07-28 $117.36 $96.25 $192.50 $90.48 E
2010-07-28 $117.36 $96.25 St $192.50 $90.48 E
2010-05-19 $113.40 $93.00 $186.00 $87.42 E
UPC Change History
Date From UPC
To UPC
• ,� Catalog Page
• ' installation Instructions
• Product Specification
Data Sheet
•
BIM Objects
This item has no BIM objects associated with it.
TRA-SER'
TRA-SER Supplier Xchange Productivity Center Downloads
TRA-SER> Search Results > Item Details
Search in:
Main Database
All
for
Ede j Alerts j Bookmark Us j Contact Us I Loci Out
User: Leff Howie
Search
Quick Links Saved Searches
Item Details for: ICN2S5490C35M
Manufacturer: PHILIPS ADVANCE
Mfr Brand PHILIPS ADVANCE
Name:
Catalog No.: ICN2S5490C35M
UPC: 781087-02490
GTIN: 00781087024904
TRA-SER PIK: 119227244
Product Name: ELECTRONIC LINEAR FLUORESCENT
BALLAST
Description: 2-F54T5H0 277V BL
Commodity: 73112 - Electronic Linear
Fluorescent Ballasts
Long HIGH FREQUENCY TYPE; 16.7 INCH L X 1.18 INCH W X 1 INCH H SIZE; -20 DEG F
Description: MIN. STARTING TEMPERATURE; 10 PERCENT MAX. THD; 50/60 HZ FREQUENCY
RATING; UL, CSA APPROVAL; 2 LAMP(S); F54T5/HO LAMP TYPE; 54 W LAMP
WATTAGE; 120 TO 277 V INPUT VOLTAGE; 1 AMPERE INPUT CURRENT; SERIES
WIRING; 120 W INPUT POWER; PROGRAMMED STARTING TYPE; 0.98 POWER
FACTOR; 1 BALLAST FACTOR; ADVANCE[T], CENTIUM[R] BRAND; PACKAGING TYPE
MID PACK; ICN MODEL
Mfr ELE BALLAST (2) F54T5/HO 120-277V
Description:
Country Of United States
Origin:
Country of origin information is based on information provided by product manufacturers. Trade Service has not
independently verified this information and does not warrant Its accuracy.
Last Update: 2015-09-02
Price Status: Discontinued
Issue: 15-36 Symbol: *
Pricing
United States
List: UOM Qty: 1
Coll: UOM: EA
Co12: $203.34 Qty2: Legacy UOM: E
Col3: $166.54 Qty3: Currency: USD
Average Market
Price: $54.58 Pkg Weight: 1 LB
Resale: $149.89
NECA Labor Rates
You are not currently authorized to view the NECA labor rates.
Please click here or contact NECA at 301-215-4504 to learn more about NECA labor rates and/or to
subscribe to the information.
Custom Fields
User
Description:
User Code:
Footnote:
Edit
Price History
United States
Date Coll Col2 Col3 List Resale AMP UOM
2012-06-06 $203.34 $166.54 $149.89 $54.58 E
2011-05-04 $203.34 $166.54 $333.08 $54.58 E
2011-05-04 $203.34 $166.54 St $333.08 $54.58 E
2010-09-29 $196.45 $160.91 $321.82 $52.73 E
2010-07-28 $196.45 $160.91 $321.82 $54.36 E
2010-07-28 $196.45 $160.91$^ $321.82 $54.36 E
2010-06-02 $189.81 $155.47 $310.94 $52.52 E
2010-05-26 $189.81 $155.47 $310.94 $49.75 E
2010-05-19 $189.81 $155.47 $310.94 $52.52 E
2008-08-13 $189.81 $155.47$^ $310.94 $49.75 E
2008-07-11 $182.53 $149.50 $299.00 $46.35 E
• "a► Catalog Page
• , Installation Instructions
• Data Sheet
BIM Objects
This item has no BIM objects associated with it.
art ��' C*r
;w' r{
Hf."1,17 II A U
wntnl\\\����\`
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
KINSMAN CONSTRUCTION
Change Order #13
Police Department Building Improvements
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Kinsman Construction
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
KINSMAN CONSTRUCTION
Change Order #13
Police Department Building Improvements
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Kinsman Construction