HomeMy WebLinkAbout2016 CON Fordyce Construction - Las Palmas Pool / Camacho Gym / Fire Station 31 improvement Project SP 16-02 - Change Order #5L City. INOOAPORAT'E$ Las Palmas Pool, Camacho Gym and Fire Station 31 Specification #16-02 Contractor: Fordyce Construction, Inc. CHANGE ORDER NO. 5 July 28, 2016 Reason/Purpose for this Change Order: Upon direction from the City, the contractor was asked to provide a proposal to furnish and install sleeves for a volleyball court at the Gym. The City also requested a hazardous materials survey be conducted at the bungalows at Pepper Park. In addition, it was determined that a sewer cleanout was present at the planter box at FS 31 where the parking lot was to be expanded. A cover is needed for this cleanout which the City requested. Also, the City requested additional electrical outlets at the pool office as well as repairs to the roofs above the main entry doors. Lastly, it was found that added electrical was required to power the lights being installed at FS 31. Please see change order requests 1.1, 4.2, 10.1,16, 17 and 19, attached. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Exhibit "A" for the lump sum price of $ 15,488.00 Original Contract Amount $ Net change by previously authorized Change Orders ... Subtotal Amount of this change order New contract amount $ Working days added: 0 /bm onager Approved by: Working days subtracted: 0 Date -7%r4 Cit ngineer / Date City Manager, required for Change odes>szasss Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, tenns and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the tenns and conditions of the original contract documents are incorporated herein. Accepted and agreed to byFORDYCE CONSTRUCTION Inc. 325,285.00 70,099.00 395,384.00 15,488.00 Percent change in Contract to date 26.31% 410,872.00 Resident En ineer Date 7-ZS-/(o Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA Las Palmas Pool, Camacho Gym and Fire Station 31 Specification #16-00 -NATI AL Cirri, INCORPORATED CHANGE ORDER NO. 5, Attachment "A" DATE: July 28, 2016 WORK PERFORMED BY: FORDYCE CONSTRUCTION, INC DESCRIPTION OF WORK: Volleyball court inserts, electrical, sewer cleanout, roofing, lighting power ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Electrical outlets at pool office and pool deck 2,664.00 2 Roof repair at main entrances to pool building 6,655.00 3 Volleyball court inserts $2,677.00 4 Power for lights at FS 31 $967.00 5 Asbestos and lead paint survey $2,121.00 6 Sewer cleanout box with lid $404.00 Subtotal 15,488.00 Subtotal $ TOTAL $15,488.00 CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 Project: Description of Work: Contractor: COR #: COST ESTIMATE SUMMARY SHEET for EXTRA WORK Las Palmas Pool,Camacho Gym and Fire Station 31 1.1 Added electrical outlets in pool office and cocnrete pedestals both sides of pool Fordyce Construction Spec No: 16037 Date: 7/21/2016 1 Prime Contractor (Includes Prime Contractor Mark Up) $0.00 2 Sub -Contractor (Includes Prime Contractor Mark Up) $2,625.00 Subtotal: $2,625.00 1.5% BOND: $39.38 GRAND TOTAL : $2,664.00 ORDYCE • CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No. Description of Work 1.1 Added electrical outlets in pool office and cocnrete pedestals both sides COR: of pool Contractor: Fordyce Construction Inc. Prepared By: Amy Crandall Date: 07/21/16 Project No. 14002 Item Description Qty Unit Materials Unit Cost Total Man Hours Labor Labor Rate Total Base Labor Equipment Unit Cost Total Sub- contractor Cost Labor 1 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 Equipment 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Materials 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Subcontractor Costs Tim Morfitt Electrical 2,500.00 SUBTOTAL $0.00 $ - $0.00 $2,500.00 Sales Tax/Labor Burden 8.75% $0.00 34.32% $ _ $0.00 Total Without Mark Ups $0.00 $ - $0.00 $2,500.00 Mark -Up Percentages 15% $0.00 20% $ - 15% $0.00 5% $ 125.00 Total with Mark -Up * Mat'I ' $0.00 * Labor $ - * Equip. $0.00 *Subcont. $2.625.00 Grand Subtotal: $2,625.00 BOND @: 1.50%I I $39.38 GRAND TOTAL : $2,664.00 PROPOSAL For Electrical Installation Provided By Tim Morfitt Electric 2514 Jamacha Rd. STE 502-135 El Cajon CA. c1201c1 License Number 7c1267S Provided for Project Name Project Address Proposal Date Fordyce Construction Las Palmas Pool National City 7/lq/2016 I propose to install all electrical devices and wiring in compliance with the 2011 National Electric code. Specific Inclusions Add 2 outlets surface mount in metal EMT conduit in the lifgaurd office. Add 2 GFI protected outlets near the pool, 1 on each side in the concrete wall thing. Power pulled from eleectric pan& Add quad outlet under main counter. Power brought from an existing outlet in the overhead space and down from ceiling through 3/4" EMT conduit with flange fitting secured to the ceiling and the desk. See sketch. Specific Exclusions Repair or unclogging conduits that run under the pool deck. Permits Payment Schedule When Complete Tim Morfitt `Electric x Signature of Acceptance Date Total Job Cost $2,500.00 T1144/ Morf 4i- Signature of Contractor 7/lq/2016 Date FORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 Project: COST ESTIMATE SUMMARY SHEET for EXTRA WORK Las Palmas Pool,Camacho Gym and Fire Station 31 Description of Work: r' remove and replace damaged roof at Las Palmas pool Contractor: COR #: 04 Roof repair at entries and mens restroom Spec No: 14002 Date: 7/15/2016 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $2,220.63 2 Sub -Contractor (Includes Prime Contractor Mark Up) $4,336.50 Exclude: Stucco repair and paint Subtotal: $6,557.13 1.5% BOND: $98.36 GRAND TOTAL : $6,655.00 O RDYC E CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Description of Work: remove and replace damaged roof at Las Palmas pool COR: 04.2 Roof repair at entries Contractor: Fordyce Construction Inc. Contract No. Prepared By: Amy Crandall Date: 07/15/16 Project No. 14002 Item Description Qty Unit Materials Unit Cost Total Man Hours Labor Labor Rate Total Base Labor Equipment Unit Cost Total Sub- contractor Cost Labor 1 Demo sheathing at entries 12 hr 12 50.13 601.56 Repair sheathing at entries 12 hr 12 50.13 601.56 hr 0.00 0.00 Equipment 0.00 Truck and trailer 1 ea 120.00 Materials 2- 3'-6"x10' entries - 3/4" plywood sheathing 3 ea I 25.00 75.00 ea 0.00 0.00 0 ea 0.00 0.00 dump fee 1 ea 30.00 30.00 Subcontractor Costs C&I Roofing 4,130.00 SUBTOTAL $105.00 $ 1,203.12 $120.00 $4,130.00 Sales Tax/Labor Burden 8.75% $9.19 34.32% $ 412.91 $10.50 --- Total Without Mark Ups $114.19 $ 1,616.03 $130.50 $4,130.00 Mark -Up Percentages 15% $17.13 20% $ 323.21 15% $19.58 5% $ 206.50 Total with Mark -Up " Mat'I $131.32 * Labor $ 1,939.24 " Equip. $150.08 `Subcont. $4,336.50 Grand Subtotal: $6,557.13 BOND @: 1.50%I $98.36 GRAND TOTAL : $6,655.00 Project. Las Palmas Pool 1om.=xr.1=-L roc Ir, Commercial & Industrial Roofing Change Order Request PCO# 2 Revised PCC CE NO. XXX RFI DATE: 10-Jun-2016 SUBCONTRACTOR C & I Roofing Co., Inc. SPECIFIC DESCRIPTION: Reroof 2 small lower roof decks ADDITIONAL DESCRIPTION: Demo by others; Install new 4 ply capsheet roof, new roof edge, new open top scupper outlets and new counter flashing. 1. LABOR DESCRIPTION OF LABOR TRADE HOURS RATE/HR TOTAL a. Roofing Field Labor 16.00 X 75.00 = 1,200 b. Supervision too x 95.00 = 95 C. Project Manager 0.50 X 150.00 = 75 d. x = o e. x = o Labor Total: 1,370 2. MATERIALS DESCRIPTION OF MATERIALS QTY UNIT PRICE TOTAL a. Roofing materials 1.00 X 360.00 = 360 b. Roof edge & counter flashing too x 540.00 = 540 c. Open top scupper outlets 2.00 X 150.00 = 300 d. Freight too X 150.00 = 150 e. x = o Sales Materials Subtotal: Tax @ 9.000% 1,350 122 Materials Total: 1,472 3. EQUIPMENT & OTHER DESCRIPTION OF EQUIPMENT UNIT DURATION RATE / UNIT TOTAL a. Separate trip charge to return to the site per Vince too x 750.00 = 750 b. x = o c. x = 0 d. X = 0 e. X = 0 Equipment & Other Total: 750 4. TOTAL LABOR, MATERIALS & EQUIPMENT 5. SUBCONTRACTOR MARKUP @ 15% bonds, the like, 3,592 539 (including but not limited to overhead, general and administrative cost, insurance, site overhead, miscellaneous costs such as small tools and all other indirect and direct costs) 6. SUBCONTRACTOR TOTAL 4,130 7. EQUIPMENT MARK UP 8. SUBCONTRACTOR LESS MARKUP 9. PRIME CONTRACTOR MARKUP 10. SUBTOTAL 11. BOND COST TOTAL Last Modified February 7, 2011 Page 1 PERFORMANCE! FORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 Project: COST ESTIMATE SUMMARY SHEET for EXTRA WORK Las Palmas Pool,Camacho Gym and Fire Station 31 Description of Work: 10.1 furnish and install 5 volleyball sleeves Contractor: Fordyce Construction COR #: Spec No: 16037 Date: 6/16/2016 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $0.00 2 Sub -Contractor (Includes Prime Contractor Mark Up) $2,637.18 Subtotal: $2,637.18 1.5% BOND: $39.56 GRAND TOTAL : $2,677.00 O RDYC E CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No. Prepared By: Amy Crandall Description of Work COR: 10.1 furnish and install 5 volleyball sleeves Contractor: Fordyce Construction Inc. Date: 07/22/16 Project No. 14002 Item Description Qty Unit Materials Unit Cost Total Man Hours Labor Labor Rate Total Base Labor Equipment Unit Cost Total Sub- contractor Cost Labor 1 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr - 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 quipmen 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Materials 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Subcontractor Costs Western flooring 2,511.60 SUBTOTAL $0.00 $ - $0.00 $2,511.60 Sales Tax/Labor Burden 8.75% $0.00 34.32% $ - $0.00 --- Total Without Mark Ups _ $0.00 $ - $0.00 $2,511.60 Mark -Up Percentages 15% $0.00 20% $ - 15% $0.00 5% $ 125.58 Total with Mark -Up * Mat'I $0.00 * Labor ' $ - * Equip. $0.00 *Subcont. $2,637.18 Grand Subtotal: $2,637.18 BOND @: 1.50°/01 1 $39.56 GRAND TOTAL $2,677.00 PROPOSAL Western Flooring, Inc. P.O. Box 323, Pine Valley, CA 91962 Ph: 858-560-5557 Fax: 858-560-5558 Lic. 790953 Bonded/Insured DIR #1000003175 Fordyce Construction 9932 Prospect Ave. #138 Santee, Ca. 92071 Attn: Vince Crisci Job Name: Las Palmas Park Municipal Pool Camacho Gym - Fire Station 31 Improvements 1810 E. 22nd St. National City, Ca. 91950 DATE: 7/21/16 Quantity Description Unit Price Amount 3 each 5 each 5 each Furnish three sets of BNS volleyball sleeves for 3" posts and BNS volleyball lids. Core five, 6" holes in concrete. Labor and materials to route new volleyball lids and set new sleeves in concrete. $285.99 + tax $150.00 $150.00 $926.60 $750.00 $750.00 Sub Total: $2,426.60 Freight/Delivery Charge: $85.00 Total Bid Amount: $2,511.60 Alt: N/A $0.00 Items not specifically mentioned above are considered to be expressly excluded. Additional items will be considered as extras to the above scope of work, thus necessitating a price adjustment. Payment in full is due upon completion. In some cases, projects may be invoiced for work complete and are due & payable upon receipt. WARNING DRILLING, SAWING, SANDING OR MACHINING WOOD PRODUCTS GENERATES WOOD DUST, A SUBSTANCE KNOWN TO THE STATE OF CALIFORNIA TO CAUSE CANCER. AVOID INHALING WOOD DUST OR USE A DUST MASK OR OTHER SAFEGUARDS FOR PERSONAL PROTECTION.---CALIFORNIA HEALTH AND SAFETY CODE SECTION 25249.6 www.western-flooring.com Page 1 of 2 Commercial Residential * Repairs * Sanding * Refinishing Western Flooring, Inc. P.O. Box 323, Pine Valley, CA 91962 Ph: 858-560-5557 Fax: 858-560-5558 Lic. 790953 Bonded/Insured Warranties and exclusions: If a dispute arises as a result of this proposal, prevailing party shall be awarded reasonable attorney's fees. Western Flooring, Inc. will not be liable for movement of wood flooring (i.e. cupping or cracking) due to excessive or diminished humidity levels. Western Flooring will not be liable for sanding through veneer when sanding engineered floors. Western Flooring does not guarantee color matching. Unless otherwise stated, there is no warranty offered on the process of screening and re -finishing wood floors. Any changes requested by customer after installation will be billed to customer on a time and materials basis. Price assumes one mobilization; if jobsite is not ready when scheduled and materials and/or labor are delivered to site, a $300.00 trip charge will be charged per mobilization. All work to be completed in a workmanlike manner according to standard practices. All agreements contingent upon strikes, accidents or delays beyond our control. No two floor boards will be identical. Variations in appearance are completely normal. Hardwood flooring is a beautiful product of nature, which is characterized by distinctive variations in grain and color. These variations in color and grain should not be seen as flaws, but embraced as nature showcases its beauty and uniqueness. Hardwood Floorings are manufactured according to accepted industry standards, which permit a defect tolerance of 5%. Color variations, graining ranges & moisture affect wood flooring, and controlled environment should be maintained (60 to 80f and 35 to 50rh respectfully) before, during and after the installation of wood flooring. Flooring inspectors recommend inspecting the floor from a standing position in normal lighting to identify irregularities. Respectfully Submitted by: Duane Johnson, President By signing below, I acknowledge that I accept, understand and received the all of the terms and conditions of this proposal. Name and Title www.western-flooring.com Page 2 of 2 Commercial Residential * Repairs * Sanding * Refinishing FORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 COST ESTIMATE SUMMARY SHEET for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Description of Work: 16 Supply Power for 7 lights Fire Station 31 Contractor: Fordyce Construction COR #: Spec No: 16037 Date: 6/29/2016 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $0.00 2 Sub -Contractor (Includes Prime Contractor Mark Up) $953.10 Subtotal: $953.10 1.5% BOND: $14.30 GRAND TOTAL : $967.00 ORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No. Description of Work Prepared By: Amy Crandall COR: 16 Supply Power for 7 lights Fire Station 31 Contractor: Fordyce Construction Inc. Date: 06/29/16 Project No. 14002 Item Description Qty Unit Materials Labor Equipment Unit Cost Total Man Hours Labor Rate Total Base Labor Unit Cost Total Sub- contractor Cost Labor 1 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 Equipment 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Materials 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 Subcontractor Costs 0.00 Cacy Electric 907.71 SUBTOTAL $0.00 $ - $0.00 $907.71 Sales Tax/Labor Burden 8.75% $0.00 34.32% $ $0.00 -- Total Without Mark Ups $0.00 $ - $0.00 $907.71 Mark -Up Percentages 15% $0.00 20% $ - 15% $0.00 5% $ 45.39 Total with Mark -Up * Mat'I $0.00 * Labor $ - * Equip. $0.00 *Subcont. $953.10 Grand Subtotal: $953.10 BOND @: 1.50%1 I $14.30 GRAND TOTAL : $967.00 Page 1 of 2 HD' ELECTRIC Proposed Change Order 10744 Prospect Ave, Ste B Santee, California 92071 Phone: (619) 938-2839 Fax: 619-938-0831 06/29/2016 Fordyce Construction 9932 Prospect Ave Suite 136 Santee, California 92071 Phone: 619-449-4272 Fax: 619-449-1930 Attn: Amy Crandall Project Name: Las Palmas Park Municipal Pool/Camacho Gym/Fire Station 31 Project Number: 16-114 Description: Additional Light Connection Subject: Las Palmas Park Municipal Pool/Camacho Gym/Fire Station 31 PCO No.: 03 RE: Cacy Electric has reviewed the above referenced change(s) and we have determined that our work is impacted as follows: Net Amount of this Proposed Change: $907.71 Schedule Impact: 1 Days Proceeded with proposed work: No Response due date: 07/09/2016 This proposal is based on the Terms and Conditions as follows: Description of work: Cacy Electric proposed to provide labor and material to install additional light connections Inclusions: Installation of MC cable in hard lid to supply power to the (7) lights that didn't have their own power feed. Exclusions: Anything not specifically stated. If you have any questions, please contact Cacy Electric as soon as possible. This proposal remains in effect for 30 days. Sincerely, Evan Finnegan https://cacy.constructjob.trimble.com/change orders/pcos_view. cfm? CFID=3140660&CF... 6/29/2016 FORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 COST ESTIMATE SUMMARY SHEET for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Description of Work: COR 17 Asbestos Survey & Lead Testing Contractor: Fordyce Construction COR #: Spec No: 16037 Date: 7/21/2016 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $0.00 2 Sub -Contractor (Includes Prime Contractor Mark Up) $2,089.50 Subtotal: $2,089.50 1.5% BOND: $31.34 GRAND TOTAL : $2,121.00 ORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No. Description of Work Prepared By: Amy Crandall COR: COR 17 Asbestos Survey & Lead Testing Contractor: Fordyce Construction Inc. Date: 07/21 /16 Project No. 14002 Item Description Qty Materials Labor Equipment Unit _ Unit Cost Total Man Hours Labor Rate Total Base Labor Unit Cost Total Sub- contractor Cost Labor 1 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 Equipment 0 0.00 0 0 0.00 0.00 0 0.00 0 0.00 Materials 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Subcontractor Costs ESC Environmental 1,990.00 SUBTOTAL $0.00 $ - $0.00 $1,990.00 Sales Tax/Labor Burden 8.75% $0.00 34.32% $ - $0.00 -- Total Without Mark Ups $0.00 $ - $0.00 $1,990.00 Mark -Up Percentages 15% $0.00 20% $ - 15% $0.00 5% $ 99.50 Total with Mark -Up * Marl $0.00 * Labor $ - * Equip. $0.00 *Subcont. $2,089.50 Grand Subtotal: $2,089.50 BOND @: 1.50%I I $31.34 GRAND TOTAL : $2,121.00 ECS Environmental, Inc. 4876 Santa Monica Avenue, #172 San Diego, CA 92107-2811 (800)511-6364 info@ecs-environmentalservices.com http://ecs-environmentalservices.com ESTIMATE ADDRESS Fordyce Construction 9932 Prospect Avenue Santee, CA 92071 ESTIMATE # 1152 DATE 07/21/2016 EXPIRATION DATE 07/20/2017 DATE ACTIVITY QTY RATE AMOUNT 08/01/2016 Asbestos and Lead -Based Paint Testing - 2 995.00 1,990.00 Pepper Park, National City, CA - Demo of 2 Bungalows 08/01/2016 Asbestos PLM Samples, Lead Paint Chip 0.00 0.00 Sampling and Laboratory Processing Fees (Non-Rush/24-48 Hour Turnaround Time) (Included) 08/01/2016 Reports (Included) 2 0.00 0.00 08/01/2016 TTLC (Total Threshold Limit Concentration) 2 150.00 300.00 Sample Collection and Laboratory Processing (If Needed) (Pricing Based Upon ECS Conducting Initial Testing) 08/01/2016 STLC (Soluable Threshold Limit Concentration) 2 250.00 500.00 Sample Collection and Laboratory Processing (If Needed) (Pricing Based Upon ECS Conducting Initial Testing) Please call our office at 800-511-6364 or email info@ecs- TOTAL environmentalservices.com to schedule our services. Thank You! Accepted By Accepted Date $2,790.00 FORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 COST ESTIMATE SUMMARY SHEET for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Spec No: 16037 Description of Work: 19 - Fire station 31 Install clean out box with lid at planter Contractor: Fordyce Construction COR #: Date: 7/21/2016 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $398.24 2 Sub -Contractor (Includes Prime Contractor Mark Up) $0.00 Subtotal: $398.24 1.5% BOND: $5.97 GRAND TOTAL : $404.00 ORDYCE II CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No. Description of Work Prepared By: Amy Crandall COR: 19 - Fire station 31 Install clean out box with lid at planter Contractor: Fordyce Construction Inc. Date: 07/21/16 Project No. 14002 Item Labor Description Qty Unit Materials Unit Cost Total Man Hours Labor Labor Rate Total Base Labor Equipment Unit Cost Total Sub- contractor Cost 1 Dig and install clean out box and bury irrigation wires 4 hr 4 50.13 200.52 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 quipmen 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Materials Concrete box and lid 1 65 65.00 65.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 uocontractor t;osts SUBTOTAL $60.00 $ 200.52 $0.00 $0.00 Sales Tax/Labor Burden 8.75% $5.25 34.32% $ 68.82 $0.00 Total Without Mark Ups $65.25 $ 269.34 $0.00 $0.00 Mark -Up Percentages 15% $9.79 20% $ 53.87 15% $0.00 5% $ - Total with Mark -Up * Mat'I $75.04 * Labor $ 323.21 * Equip. $0.00 *Subcont. $0.00 Grand Subtotal: $398.24 BOND @: 1.50%I I $5.97 GRAND TOTAL : $404.00 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk FORDYCE CONSTRUCTION Change Order #5 Las Palmas Pool, Camacho Gym & Fire Station 31 Improvement Project Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Fordyce Construction