HomeMy WebLinkAbout2016 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #5Net change by previously authorized Change Orders Subtotal Amount of this change order -a-- CALIFORNIA NATIONAL envy rr 13All MCORPORATEO PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 5 August 8, 2016 Reason/Purpose for this Change Order: Additional traffic control, signing and striping was required to accommodate two lanes in the west bound direction from 1-805 to Palm Avenue (Stage 1A per Dokken Revised Plan). Under direction of the Engineer the Contractor ,is to proceed with additional signing and striping from Palm Avenue to 1-805. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with additional signing and striping from 1- 805 to Palm Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 17,327.70 1,911,825.80 19,046.72 New contract amount $ 1,930,872.52 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 1.92% Submitted by: 81211/4 Cingineer ,/ Date City Manager, required for CharseOrders >S24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: me: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, NationaVCity, CA 91950 Te ep one (619 936-4380 CALIFORNIA NATIONAL CITAT m 1 INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 CHANGE ORDER NO. 5 DATE: July 14, 2016 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: Revised Traffic Control Plan (Stage 1A) ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) 3) Foreman Laborer Laborer Hour Hour Hour 8.00 8.00 8.00 80.20 57.63 57.63 641.60 461.04 461.04 $ 1,563.68 Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ 312.74 $ 1,876.42 Unit Qty Rate Total 1) 48" Aluminum Sign EA 2) 4"x4" Posts for Sign EA 3) R3-2 "No Left Turn" Signs EA 4) Arrow Board MO 5) Cancelled K-Rail LS 1.00 2.00 18.00 2.00 1.00 122.99 10.00 31.50 450.00 265.13 122.99 20.00 567.00 900.00 265.13 $ 1,875.12 $ 150.01 $ 281.27 2:0 .40 EQUIPMENT Unit Qty Rate Total 1) Utility Truck Hour 8.00 50.00 400.00 Sub -Total Equipment: $ 400.00 Equipment Markup (15%): TOTAL EQUIPMENT: $ 60.00 46 SUBCONTRACTOR 1) Statewide - Install New Stage 1A Striping per revised Traffic Control Plan Unit LS Qty 1.00 Rate 7,250.00 Total 7,250.00 2) Glue Down Delineators EA 154.00 42.00 6,468.00 $ 13,718.00 Sub -total Subcontractor: Prime Contractor Markup (5%): TOTAL SUBCONTRACTOR: BOND AND INSURANCE (1%): $ 685.90 $14,403.90 $ 190.47 GRAND TOTAL: $19,046.72 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: PROJECT PROFESSIONALS CORPORATION' TRANSMITTAL COVER To: National City Engineering Department Project Name: Plaza Blvd Widening "N" Avenue to 1-805, Spec No 16-01 ITEMS DELIVERED: Change Order #5 Delivered by: Received by: Project Professionals Corporation Date: 9lzN/l6 .OVA ._CITY"° ••k�Y1kATED A') CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk DICK MILLER, INC. Change Order #5 Plaza Blvd. Widening "N" Avenue to 1-805 Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Dick Miller, Inc.