HomeMy WebLinkAbout2016 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #5Net change by previously authorized Change Orders
Subtotal
Amount of this change order
-a-- CALIFORNIA
NATIONAL envy
rr 13All
MCORPORATEO
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 5
August 8, 2016
Reason/Purpose for this Change Order:
Additional traffic control, signing and striping was required to accommodate two lanes in the west bound direction
from 1-805 to Palm Avenue (Stage 1A per Dokken Revised Plan). Under direction of the Engineer the Contractor
,is to proceed with additional signing and striping from Palm Avenue to 1-805.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with additional signing and striping from 1-
805 to Palm Avenue. The agreed upon price for all costs associated with this work is as stated on this Change
Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
17,327.70
1,911,825.80
19,046.72
New contract amount $ 1,930,872.52
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 1.92%
Submitted by:
81211/4
Cingineer ,/ Date City Manager, required for CharseOrders >S24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
me: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, NationaVCity, CA 91950 Te ep one (619 936-4380
CALIFORNIA
NATIONAL CITAT
m
1
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
CHANGE ORDER NO. 5
DATE: July 14, 2016
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Revised Traffic Control Plan (Stage 1A)
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
2)
3)
Foreman
Laborer
Laborer
Hour
Hour
Hour
8.00
8.00
8.00
80.20
57.63
57.63
641.60
461.04
461.04
$ 1,563.68
Sub -Total Labor:
Labor Markup (20%):
TOTAL LABOR:
$ 312.74
$ 1,876.42
Unit
Qty
Rate
Total
1) 48" Aluminum Sign EA
2) 4"x4" Posts for Sign EA
3) R3-2 "No Left Turn" Signs EA
4) Arrow Board MO
5) Cancelled K-Rail LS
1.00
2.00
18.00
2.00
1.00
122.99
10.00
31.50
450.00
265.13
122.99
20.00
567.00
900.00
265.13
$ 1,875.12
$ 150.01
$ 281.27
2:0 .40
EQUIPMENT
Unit
Qty
Rate
Total
1) Utility Truck
Hour
8.00
50.00
400.00
Sub -Total Equipment: $ 400.00
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 60.00
46
SUBCONTRACTOR
1)
Statewide - Install New Stage
1A Striping per revised Traffic
Control Plan
Unit
LS
Qty
1.00
Rate
7,250.00
Total
7,250.00
2)
Glue Down Delineators
EA
154.00
42.00
6,468.00
$ 13,718.00
Sub -total Subcontractor:
Prime Contractor Markup (5%):
TOTAL SUBCONTRACTOR:
BOND AND INSURANCE (1%):
$ 685.90
$14,403.90
$ 190.47
GRAND TOTAL:
$19,046.72
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
PROJECT PROFESSIONALS CORPORATION'
TRANSMITTAL COVER
To: National City Engineering Department
Project Name: Plaza Blvd Widening "N" Avenue to 1-805,
Spec No 16-01
ITEMS DELIVERED:
Change Order #5
Delivered by:
Received by:
Project Professionals Corporation
Date: 9lzN/l6
.OVA ._CITY"°
••k�Y1kATED A')
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
DICK MILLER, INC.
Change Order #5
Plaza Blvd. Widening "N" Avenue to 1-805
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Dick Miller, Inc.