HomeMy WebLinkAbout2016 CON West Tech Contracting - Paradise Creek Restoration Project - Change Order #6Paradise Creek Restoration CIP No: 15-05 Contractor: West -Tech Contracting, Inc. CHANGE ORDER NO. 6 September 23, 2016 Reason/Purpose for this Change Order: Core concrete footings to replace existing rusted foundations bolts during bridge refurbishment. The City of National City and Contractor agree to the following change to the original Contract: The contractor encountered rusted anchor bolts when removing the pedestrian bridge across Paradise Creek. In order to make sure the bridge was secured correctly the city directed the contractor to drill out the existing rusted foundation bolts and replace them with new bolts during the bridge removal, refurbishment and replacement. Original Contract Amount $ 1,660,922.33 Net change by previously authorized Change Orders Subtotal Amount of this change order (46,970.24) 1,613,952.09 2,760.00 New contract amount $ 1,616,712.09 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date -2.66% Sub � ed by: jectMa.-•er A, proved by: Cit ngineer Date/ 2//6. City ProjectManager Mana er Date Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted - • • . •re= • to b Con - • ' • - Name: ick Date 9/29/2016 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Owner's Reference Number: Work Performed for: WirgTr= TEM o ri t r a. c t i n g, I n c CHANGE ORDER PROPOSAL FORM 2178-806 National City - Paradise Creek Restoration 6/15/2016 Description of Work: Core Drilling Required Due to Bent lnbeds in Bridge Footing HRLY XTNDED MATERIAL & SPECIALTY ITEMS HRLY XTNDED EQUIPMENT HRS RATE AMOUNT DESCRIPTION UNITS COST EXT LABOR HRS RATE AMOUNT 6/27/2016 Casper Core Drilling 1 $ 845.00 $ 845.00 Penhall Core Drilling 1 $ 875.00 $ 875.00 Equipment Manager 1Russ Bennett) 8 $ 85.00 $ 680.00 SUBTOTAL $6.00 SUBTOTAL $2,400ar0 SUBTOTAL $0.00. TOTAL COST OF EQUIP & MATERIALS $2,400.00 Lbr Surcharge 0% [0%-OT] $0.09 TOTAL COST OF LABOR A $0.00 SUBCONTRACTOR NO. COST EXT TOTAL EQUIP, MATERIALS, SPECIALTY B $2,400.00 $0.00 TOTAL SUBCONTRACTOR C $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 % ON LABOR 20% (A) $0.00 TOTAL COST OF SUBCONTRACTOR % EQ, MATLS, SPECIALTY 15% (B) $360.00 Rented Equip & Material Prices Snbj to Change per Final Billing from Supplier % ON SUBS 5% (C) $0.00 CONTRACTOR'S RF:PRESENTnTwF. RESIDENT ENGINEER TOTAL THIS REPORT $2,760.00 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk WEST -TECH CONTRACTING Change Order #6 Paradise Creek Restoration Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Order to West -Tech Contracting