Loading...
HomeMy WebLinkAbout2016 CON Western Rim Constructors - Parks Improvements Project - Change Order #23OC RECEIVED OCT 272016 CITY OF NATIONAL CITY CITY MANAGER'S OFFICE Kimball, El Toyon and Kimball Skate Park Improvements CIP No: 15-04 Contractor: Western Rim Constructors, Inc. Reason/Purpose for this Change Order: To improve the pedestrian ADA path of travel by installing an ADA-Compliant at El Toyon Park between the main park and field parking lot. CHANGE ORDER NO. 23 September 22, 2016 pedestrian crossing/speed table The City of National City and Contractor agree to the following change to the original Contract: The contractor will field design, layout and install an ADA-compliant speed table/pedestrian crossing on U Ave, between El Toyon main park and El Toyon field parking lot eight feet in width with three foot wings, tactile, domes, clean out grate and all necessary signage and striping. This work also includes widening the existing parking lot driveway, connecting sidewalk from the restroom building and the crossing and modifying the existing sidewalk landing as needed. Original Contract Amount $ 3,452,342.98 Net change by previously authorized Change Orders 217,575.25 Subtotal 3,669,918.23 Amount of this change order 35,829.00 New contract amount $ 3,705,747.23 Working days added: 5 Working days subtracted: 0 Submitted by: Project Manager Approved by: 7 City'Engineer Date Percent change in Contract to date 7.34% City Project Manager Date /od(r/� to%a-)hz.,. Date City Manager required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the origfNI contract do > ments are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) ceptci d agre o by (Contractor's name): Name: i L [ Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk WESTERN RIM CONSTRUCTORS Change Order #23 Kimball Park, El Toyon Park and Kimball Skate Park Improvements Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Order to Western Rim Constructors