Loading...
HomeMy WebLinkAbout2016 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #8CALIFORNIA --4, NATIONAL Cfl y INCORPORATYO PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 8 September 26, 2016 Reason/Purpose for this Change Order: Additional traffic control, signing and striping was required to accommodate two lanes in the west bound direction from 1-805 to N Avenue (Stage 2 per Dokken Revised Plan). Under direction of the Engineer the Contractor is to proceed with additional signing and striping from N Avenue to 1-805. [The City of National City and Contractor agree to the following change to the original Contract: ;The City and the Contractor agree that the Contractor shall proceed with additional signing and striping from I- 1805 to N Avenue. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 Submitted by: 40,947.06 1,935,445.16 2,464.80 $ 1,937,909.96 Percent change in Contract to date 2.29% Date CitManager,required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: erne: P• u NALryc.v.(PRO-Sear MAr., o.C,ESZ Date teir ire Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 -- CALIFORNIA_ INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification # 16-01 DATE: September 6, 2016 CHANGE ORDER NO. 8 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: Revised Traffic Control Plan (Stage 2) ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) N/A Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: $ MATERIALS Unit Qty Rate Total 1) Additional Traffic Control Signs EA 5.00 31.50 157.50 2) Additional Plastic K-Rail - 2 Each ($108/EA/MO) EA 2.00 216.00 432.00 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: $ 589.50 $ 47.16 $ 88.43 $ 725.09 EQUIPMENT Unit Qty Rate Total 1) Arrow Board, trailer mounted MO 2.00 480.00 960.00 Sub -Total Equipment: $ 960.00 Equipment Markup (15%): TOTAL EQUIPMENT: $ 144.00 1,104.00 SUBCONTRACTOR Unit Qty Rate Total 1) Invoice for actual stage 2 Traffic Control LS 1.00 8,857.20 8,857.20 2) Quote for plan stage 2 Traffic Control LS 1.00 (8,275.00) (8,275.00) Sub -total Subcontractor: Prime Contractor Markup (5%): TOTAL SUBCONTRACTOR: BOND AND INSURANCE (1%): $ 582.20 $ 29.11 $ 611.31 $ 24.40 GRAND TOTAL: $2,464.80 Statewide Stripes, Inc. P.O. Box 600710 San Diego, CA 92160-0710 ««««««««««c«««««»»»»»»»»»»»»»»»» 858.560.6887 858.560.0158 fax Tax ID #33-0915254 Class: C32 MB/SB# 40421 DBE# 32232 PW Contractor Reg# 1000001334 CA Lie. #788286 ESTIMATE DATE 9/1/2016 NO. 15568 Customer Info Exp: 12/31/2016 Since 1990 Dick Miller, Inc. 930 Boardwalk, Ste. H San Marcos, CA 92078 760.471.6842 x471.6178 PROJECT REP SWS NO. Stage II traffic control 9/1/16 BB QTY DESCRIPTION COST TOTAL 2,300 Ln. Ft. Detail-27B 4" Right Edgeline 0.39 897.00 1,780 Ln. Ft. Detail-8 Skip Line Stripe .� w° _, 0.35 623.00 800 Ln. Ft. Double Yellow 0.54 432.00 1,180 Ln. Ft. Double Yellow Island No Reflectors 0.54 637.20 800 Detail-38A 8" Solid White 0.54 432.00 1 Black Out Stage I Striping v 1,200.00 1,200.00 85 R & R Yellow Delineators (portable and glue down class 1) 38.00 3,230.00 37 R & R White Delineators (portable and glue down class 1) 38.00 1,406.00 TOTAL $8,857.20 EXCLUDES: Prepatory work,Waiver of Subrogation on Worker's Comp per party/policy @ $150.00 ea., Additional Insured Endorsements on Auto Liability @ $75.00 ea., mast arm signs, electrical or FLASHING BEACON SIGNS, bonds, notary, night work, prevailing wages (unless included above). Not responsible for A.D.A. compliance. Items not specifically included are excluded and require an additional bid. STATEWIDE STRIPES INC. REQUIRES TWO WEEKS WRITTEN NOTICE PRIOR TO SCHEDULING. Acceptance of Estimate and Agreement The undersigned hereby contracts for the services noted above and agrees to pay for the services upon completion and receipt of an invoice. The undersigned agrees to pay reasonable attorneys' fees and costs if incurred in the enforcement of this contract. Co. Name: Date: By: Signature: (Print Name anti Title) Statewide Stripes, Inc. P.O. Box 600710 San Diego, CA 92160-0710 858.560.6887 858.560.0158 fax Tax ID #33-0915254 Class: C32 MB/SB# 40421 DBE# 32232 PW Contractor Reg# 1000001334 CA Lic. #788286 ESTIMATE DATE 1/12/2016 NO. 14915 Customer Info Ex!): 12/31/2016 Since 1990 ESTIMATING DEPARTMENT PROJECT REP SWS NO. Plaza Blvd Widen 1/12/16 BB QTY DESCRIPTION COST TOTAL 1 1 Bid Item 2 Striping Portion of Traffic Control (Install Stage II Striping Only) Bid Item 45 Striping,Markings and Signs Base Bid Optional Additional: Remove Stage II Striping and install Final striping configuration in temporary paint for stage III @ $7,965.00 Includes: Items as listed, Prevailing Wages, Traffic control for our operations and Waterblasting per specs. , Excludes: Traffic Control plans, Permits and "Mast Arm" Signs 8,275.00 8,275.00 TOTAL EXCLUDES: Prepatory work,Waiver of Subrogation on Worker's Comp per party/policy @ $150.00 ea., Additional Insured Endorsements on Auto Liability @ $75.00 ea., mast arm signs, electrical or FLASHING BEACON SIGNS, bonds, notary, night work, prevailing wages (unless included above). Not responsible for A.D.A. compliance. Items not specifically included are excluded and require an additional bid. STATEWIDE STRIPES INC. REQUIRES TWO WEEKS WRITTEN NOTICE PRIOR TO SCHEDULING. Acceptance of Estimate and Agreement The undersigned hereby contracts for the services noted above and agrees to pay for the services upon completion and receipt of an invoice. The undersigned agrees to pay reasonable attorneys' fees and costs if incurred in the enforcement of this contract. Co. Name: Date: By: Signature: (Print Name and Titlel CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk DICK MILLER, INC. Change Order #8 Plaza Blvd. Widening "N" Avenue to 1-805 Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Order to Dick Miller, Inc.