Kimball, El Toyon and Kimball Skate Park Improvements CHANGE ORDER NO. 21
CIP No: 15-04 September 22, 2016
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
To replace old and corroded wiring and meet new electrical codes needs at El Toyon's newly constructed
Sand Pit Restrooms building.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to purchase and install as needed new #8 CU stranded wire, #4 stranded
wire, and two (2) 70A, 250V bolt on circuit breakers to meet electrical needs at El Toyon Park's Sand Pit
restroom.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders 196,962.50
Subtotal
Amount of this change order
New contract amount
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 5.74%
Submitted by:
112).1..(.(a
Project Manager Date City Project Manager Date
Approved by:
/647//(
Citngineer Date City Manager, required for Change Orders>$24,999 Date
3,649,305.48
1,359.75
$ 3,650,665.23
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and co to and represents at costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overh ad, fees, bonds, insurance. profit, etc. and that there will be no further compensation. All of the terms and conditions
of thei oridipal con act documents are incorporated hereih. (2 originals: 1 for City Clerk, 1 for Contractor)
cceptecl~and grOed to by (Contractor's name):
ame: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
CALIFORNIA
NATIONAL CM"
1NCORPORAT>✓O
Kimball, El Toyon and Kimball Skate Park Improvements
CIP No: 15-04
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
To increase erosion control and pedestrian safety near the field at El Toyon Park by installing a concrete curb
at the toe of the slope.
CHANGE ORDER NO. 22
September 22, 2016
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to add 425 LF of 8" G-1 curb. This work includes removal of existing
asphalt and disposal as needed, grade, installation of new curb, patch back of asphalt trench and backfill curb
and grade as needed.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders
Subtotal
198,322.25
3,650,665.23
Amount of this change order 19,253.00
New contract amount $ 3,669,918.23
Working days added: 5 Working days subtracted: 0 Percent change in Contract to date 6.30%
Submitted by:
Project Manager Date
Approved by:
City'Engineer
City Project Manager Date
/a//94
Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represe all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, ov rhead, fees, bonds, i u nce, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original cor ract documents ar incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted
Name.
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
reed to by (Gpniactor's name):
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
id(1\ RO
Date
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
'►- CALIFORNIA ^�
NATIONAL CITY
LVCORPORAT ED -
Kimball, El Toyon and Kimball Skate Park Improvements CHANGE ORDER NO. 24
CIP No: 15-04 September 22, 2016
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
Install multiple receptacle outlets in the utility rooms of the newly constructed Restrooms and Team Room
facility as requested by city staff. Electrical outlets were not called for on the original plans.
The City of National City and Contractor agree to the following change to the original Contract
The contractor has been directed to purchase, install additional conduit, breakers and connect multiple single
and double electrical outlets within the utility rooms at the two Kimball Park and El Toyon restrooms, and
multiple outlets within the Team Room facility as directed by city park staff during a field walk through.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders
Subtotal
253,404.25
3,705,747.23
Amount of this change order 3,457.65
New contract amount $ 3,709,204.88
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.44%
Submitted by:
Project Manager
proved by:
Date
City Project Manager Date
!o/9/rG
City'Engineer Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervis on, overhead, f es;, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the . rig al contract d curve nts are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Acced tq by (Contractor's name):
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
WESTERN RIM CONSTRUCTORS
Change Order #21, #22, #24
Kimball Park, El Toyon Park and Kimball Skate Park Improvements
Judy Hernandez (Engineering/Public Works) Forwarded
Copy of Change Orders to Western Rim Constructors