Las Palmas Pool, Camacho Gym and Fire Station 31
Specification #16-02
Contractor: Fordyce Construction, Inc.
Reason/Purpose for this Change Order:
CHANGE ORDER NO. 8
September 29, 2016
Upon direction from the City, the contractor was asked to provide a proposal to replace kitchen cabinets and to re-.
'tile the shower at Fire Station 31. (COR 22, 23 and 24).
The City of National City and Contractor agree to the following change to the original Contract:
'The City and the Contractor agree that the Contractor will provide all the services described in Exhibit "A" for the
lump sum price of $13,367.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $
325,285.00
152, 320.00
477, 605.00
13,367.00
Working days added: 20 Working days subtracted: 0 Percent change in Contract to date 50.94%
I Projectanager
Approved by:
City�Engineer
sldent Engir)feer
// 3 id
490, 972.00
Date City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and greed to by FORDYCE CONSTRUCTION, Inc.
Name:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
�-CALIFORNIA .{+
Las Palmas Pool, Camacho Gym and Fire Station 31
Specification #16-00
NATIONAL, envy
no
- INCORPORATED
CHANGE ORDER NO. 8, Attachment "A"
DATE: September 29, 2016
WORK PERFORMED BY: FORDYCE CONSTRUCTION, INC
DESCRIPTION OF WORK:
itchen cabinets, bathroom tile
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1
Kitchen Cabinets
3,588.00
2
Kitchen Cabinets
3,956.00
3
Tile Shower
$5,823.00
4
5
Subtotal 13,367.00
FORDYCE
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
COST ESTIMATE SUMMARY SHEET for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31
Description of Work: 22 new tile at fire station mens shower
Contractor: Fordyce Construction
•
Spec No: 16037
Date: 6/16/2016
Worksheet
Description
Totals
1
Prime Contractor (Includes Prime Contractor Mark Up)
$385.74
2
Sub -Contractor (Includes Prime Contractor Mark Up)
$5,350.80
Subtotal:
$5,736.54
1.5% BOND:
$86.05
ORDYCE
• CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No.
Description of Work Prepared By: Amy Crandall
COR: 22 new tile at fire station mens shower
Contractor: Fordyce Construction Inc.
Date: 09/06/16
Project No. 14002
Item
Description
Qty
Unit
Materials
Labor
Equipment
Unit Cost
Total
Man
Hours
Labor
Rate
Total Base
Labor
Unit Cost
Total
Sub-
contractor
Cost
1
Install Shower drain
4
hr
4
50.13
200.52
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
Equipment
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
Plumbing drain
1
50.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
Subcontractor Costs
Valley Floor covering
Interior of shower only
5,096.00
SUBTOTAL
$50.00
$ 200.52
$0.00
$5,096.00
Sales Tax/Labor Burden
8.75%
$4.38
34.32%
$ 68.82
$0.00
Total Without Mark Ups
$54.38
$ 269.34
$0.00
$5,096.00
Mark -Up Percentages
15%
$8.16
20%
$ 53.87
15%
$0.00
5%
$ 254.80
Total with Mark -Up
* Mat'I
$62.53
* Labor
$ 323.21
* Equip.
$0.00
*Subcont.
$5,350.80
Grand Subtotal:
$5,736.54
BOND @:
1.50%I I $86.05
GRAND TOTAL :
$5,823.00
VALLEY FLOOR COVERING,INC.
PROPOSAL
9945 PROSPECT AVE.
SANTEE, CA 92071
619 449-5222 ; FAX 619 449-0540
Submitted To : FORDYCE CONSTRUCTION
Attention : VINCE CRISCI
Phone:
Phone : 619 449-4272
Fax :
Address : 9932 PROSPECT AVE.
Proposal Date : 9/5/2016
SANTEE, CA 92071
Job Name :
Bennis@valley-floor.com
FIRESTATION 31
We hereby submit specifications and estimates for :
Item Description $ Price
TO FURNISH & INSTALL DAL TILE 1"X1"
2"X2" FOR THE SHOWER WALLS - GROUP
WE WILL FLOAT & WATERPROOF THE
WE WILL FURNISH & INSTALL 1/2" DENSHIELD
ONE SOAP DISH & ONE SHAMPOO SHELF
FIGURING STANDARD GROUT
FOR THE SHOWER PAN &
2 PRICING
PAN
FOR THE WALLS
IS INCLUDED
NOTE :This proposal may be withdrawnedogeepted by :
11 YYJJ
We PROPOSE hereby to furnish materials and labor —complete in accordance
With above specifications, for the sum of : $ 5096.00
Our terms are net 30 days. Customer will be responsible for any costs
And fees incurred in the collection of any past due invoices and understands
That a 1.5% monthly finance charge will be billed on invoices that are 30 days old.
All work is guaranteed to be as specified. Al! work to be
Workmanlike manner according to standard practices.
From above specs involving extra costs will be executed
And above the estimate. Charges for labor are quoted for
Increased labor rates.
S
a /De L4 11 4
completed nII
Any alteration or deviation
only upon written orders, and will become an extra charge over
normal working hours. Work requested after hours will be at
ACCEPTANCE OF PROPOSAL : The above prices, specs, and conditions are Satisfactory and are hereby
Accepted. You are authorized to do the work as specified.
CUSTOMER NAME :
AUTHORIZED SIGNATURE : BY DATE :
Contractor:
COR #:
CONSTRUCTION
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
COST ESTIMATE SUMMARY SHEET for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31
Description of Work: 23 Install new base cabinets
Fordyce Construction
Spec No: 16037
Date: 6/16; 2016
Worksheet
Description
Totals
1
Prime Contractor (Includes Prime Contractor Mark Up)
$909.59
2
Sub -Contractor (Includes Prime Contractor Mark Up)
$2,625.00
Subtotal:
$3,534.59
1.5% BOND:
$53.02
GRAND TOTAL :
$3,588.00
ORDYCE
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
Project: Las Palmas Pool,Camacho Gym and Fire Station 31
Description of Work
COR: 23 Install new base cabinets
Contractor: Fordyce Construction Inc.
GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK
Contract No.
Prepared By: Amy Crandall
Date: 09/13/16
Project No. 14002
Item
Description
Qty
L Unit
Materials
Unit Cost
Total
Man
Hours
Labor
Labor
Rate
Total Base
Labor
Equipment
Unit Cost
Total
Sub-
contractor
Cost
Labor
1
Supervision
2
hr
2
70.00
140.00
2
trash existing cabinets
2
hr
2
50.13
100.26
3
Remove and reinstall existing hardware
4
hr
4
50.13
200.52
4
Clean up
2
hr
2
50.13
100.26
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
quipment
0.00
0
0.00
0
0.00
0
0.00
0
0.00
Materials
Dump fees
1
ea
30.00
30.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
ubcontractor Costs
CLP
2,500.00
SUBTOTAL
$30.00
$ 541.04
$0.00
$2,500.00
Sales Tax/Labor Burden
8.75%
$2.63
34.32%
$ 185.68
$0.00
Total Without Mark Ups
$32.63
$ 726.72
$0.00
$2,500.00
Mark -Up Percentages
15%
$4.89
20%
$ 145.34
15%
$0.00
5%
$ 125.00
Total with Mark -Up
* Mat'I
$37.52
* Labor
$ 872.07
Equip. q p.
$0.00
*Subcont.
$2,625.00
_
Grand Subtotal:
$3,534.59
BOND @:
1.50%1 I $53.02
GRAND TOTAL :
$3,588.00
ORDYCE
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
COST ESTIMATE SUMMARY SHEET for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31
Description of Work: 24- Additional cabinets replaced Fire station 31
Contractor:
COR #:
Fordyce Construction
Spec No: 16037
Date: 9/26/2016
Worksheet
Description
Totals
1
Prime Contractor (Includes Prime Contractor Mark Up)
$747.99
2
Sub -Contractor (Includes Prime Contractor Mark Up)
$3,150.00
Subtotal:
$3,897.99
1.5% BOND:
$58.47
GRAND TOTAL :
$3,956.00.
ORDYCE
CONSTRUCTION
9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529
GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK
Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No.
Description of Work Prepared By: Amy Crandall
COR: 24- Additional Cabinets Replaced @ Fire station 31
Contractor: Fordyce Construction Inc.
Date: 09/26/16
Project No. 14002
Item
Labor
Description
Qty
Unit
Materials
Labor
Unit Cost
Total
Man
Hours
Labor
Rate
Total Base
Labor
Equipment
Unit Cost
Total
Sub-
contractor
Cost
1
Demo 3 base cabinets an 1 upper cabinet
4
hr
4
50.13
200.52
2
Remove and re install hardware
2
hr
2
50.13
100.26
3
Supervision
2
hr
2
70.00
140.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
0
hr
0
50.13
0.00
Fn, unman+
0
hr
0
50.13
0.00
0
0.00
0
0
0
0.00
0.00
0.00
0
Materials
0.00
D
Dump fees
1
ea
30.00
30.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
Environmental builders
3,000.00
S
SUBTOTAL
$30.00
$ 440.78
$0.00
$3,000.00
Sales Tax/Labor Burden
8,75 %
$2.63
34.32%
$ 151.28
80.00
Total Without Mark Ups
$32.63
$ 592.06
$0.00
$3,000.00
Mark -Up Percentages
15%
$4.89
20%
$ 118.41
15%
$0.00
5%
$ 150.00
Total with Mark -Up
* Mat'I
$37.52
* Labor
$ 710.47
* Equip.
$0.00
*Subcont.
$3,150.00
Grand Subtotal:
$3,897.99
BOND @:
1.50%I I $58.47
GRAND TOTAL :
$3,956.00
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
FORDYCE CONSTRUCTION, INC.
Change Order #8
Las Palmas Pool, Camacho Gym & Fire Station 31
Improvements Project