Kimball, El Toyon and Kimball Skate Park Improvements CHANGE ORDER NO. 21
CIP No: 15-04 September 22, 2016
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
To replace old and corroded wiring and meet new electrical codes needs at El Toyon's newly constructed
Sand Pit Restrooms building.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to purchase and install as needed new #8 CU stranded wire, #4 stranded
wire, and two (2) 70A, 250V bolt on circuit breakers to meet electrical needs at El Toyon Park's Sand Pit
restroom.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
196, 962.50
3,649,305.48
1,359.75
New contract amount $ 3,650,665.23
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 5.74%
Submitted by:
Project Manager Date City Project Manager Date
Approved by:
City'Engineer Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and co fete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supe on, overhad,` fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of th on s' al con, act • ocuments are incorporated hereih. (2 originals: 1 for City Clerk, 1 for Contractor)
ed to b
(Contractor's name):
WY
c�It7t t...
ame: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
�- CALIFORNIA
Clry
Kimball, El Toyon and Kimball Skate Park Improvements
CIP No: 15-04
Contractor: Western Rim Constructors, Inc.
CHANGE ORDER NO. 22
September 22, 2016
Reason/Purpose for this Change Order.
To increase erosion control and pedestrian -safety near the field at El Toyon Park by installing a concrete curb
at the toe of the slope.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to add 425 LF of 8" G-1 curb. This work includes removal of existing
asphalt and disposal as needed, grade, installation of new curb, patch back of asphalt trench and backfill curb
and grade as needed.
Original Contract Amount $ 3,452,342.98
Net change by previously authorized Change Orders 198,322.25
Subtotal
Amount of this change order
New contract amount
Working days added: 5 Working days subtracted: 0 Percent change in Contract to date 6.30%
3,650,665.23
19,253.00
Submitted by:
Project Manager
Approved by:
$ 3,669,918.23
1011( (.La
Date
City Project Manager Date
/o/1,4
City'Engineer Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represe re all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, i u
of the origins co ract documents ar: in
Accepted d . • reed to b • • n
nee, profit, etc. and that there will be no further compensation. All of the terms and conditions
rporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
actor's name):
........A i 10
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
CALIFORNIA -�
NATIONAL c�
( INCORPORATED -�
Kimball, El Toyon and Kimball Skate Park Improvements CHANGE ORDER NO. 24
CIP No: 15-04 September 22, 2016
Contractor: Western Rim Constructors, Inc.
Reason/Purpose for this Change Order:
Install multiple receptacle outlets in the utility rooms of the newly constructed Restrooms and Team Room
facility as requested by city staff. Electrical outlets were not called for on the original plans.
The City of National City and Contractor agree to the following change to the original Contract:
The contractor has been directed to purchase, install additional conduit, breakers and connect multiple single
and double electrical outlets within the utility rooms at the two Kimball Park and El Toyon restrooms, and
multiple outlets within the Team Room facility as directed by city park staff during a field walk through.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal .
Amount of this change order
New contract amount . $ 3,709,204.88
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.44%
Submitted by:
$ 3,452,342.98
253,404.25
3,705,747.23
3,457.65
[Project Manager
(01115tilst
Date
City Project Manager Date
Approved by:
Cit n ineer Date City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervi _on, overhead, f e bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the . i. al contract d
Cu
Acce•►= nd a • re: d t
me:
ents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
by (Contractor's name):
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor
1243 National City Boulevard, National City, CA 91950
cc: Engineering project file, Project Manager
Telephone (619) 336-4380
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
WESTERN RIM CONSTRUCTORS
Change Order #21, #22, #24
Kimball Park, El Toyon Park and Kimball Skate Park Improvements
Judy Hernandez (Engineering/Public Works) Forwarded
Copy of Change Orders to Western Rim Constructors