Loading...
HomeMy WebLinkAbout2016 CON Kinsman Construction - Police Department Building Improvements - Change Order #14-- CALIFORNIA --4- NATIO ALCflV - I �� INCORPORATED NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 Contractor: KINSMAN CONSTRUCTION, INC. CHANGE ORDER NO. 14 August 29, 2016 Reason/Purpose for this Change Order: The City requested a proposal from the contractor to repair additional waterproofing around the perimeter of the building. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the price of $19,153.00 and as further described in change order request 31.1, attached. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order 768,463.00 267,599.13 1,036,062.13 19,153.00 New contract amount $ Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 37.32% 1,055,215.13 ubmitt_ d y: 1. 4 - rotect Manager Date 7 71/ 4' Re ide f t Engineer e Approved by: 2 Cit ngineer . Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by KINSMAN CONSTRUCTION, Inc. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL CITY POLICE DEPARTMENT UPGRADES Specification #15-06 NATIONAL, ci-Tv i — a 3'3V —==� - INCORPORATED CHANGE ORDER NO. 14, Attachment "A" DATE: August 29, 2016 WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC DESCRIPTION OF WORK: waterproofing around building ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Repair waterproofing around building perimeter $ 19,153.00 2 3 TOTAL $ 19,153.00 KINSMAN CONSTRUCTION, INC TO: Derrick Anderson PPC 4499 Ruffin Road, Suite 250 San Diego CA 92123 Change Order Request # 31r.1 PHONE. 858-634-8180 DATE: 08/17/16 JOB NAME: National City Police Department LOCATION: 1200 Notional City Blvd JOB NUMBER: S5-029 FAX 858-634-8184 CONTRACT NUMBER: Change Order Request #031 r.1 Item No. Description Amount 1. Additional Waterproofing per David Reed Recommendations $16,655.00 2. OH&P $2,498.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WE AGREE hereby to make the change(s) specified above at THIS price $19,153.00 DATE 08/17/16 BASE CONTRACT AMOUNT: (original contract amount) $0.00 - > ,_ _ _ INCREASE CONTRACT AMOUNT BY: $19,153.00 AUTHORIZED SIGNATURE (CONTRACTOR) ACCEPTED - The above prices and specifications of the Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated. DATE OF ACCEPTANCE SIGNATURE (OWNER) Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950 CONTRACTORS LICENSE: CA #955119 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk KINSMAN CONSTRUCTION Change Order #14 Police Department Building Improvements Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Kinsman Construction