CHANGE ORDER NO. 14
August 29, 2016
Reason/Purpose for this Change Order:
The City requested a proposal from the contractor to repair additional waterproofing around the perimeter of the
building.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for
the price of $19,153.00 and as further described in change order request 31.1, attached.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
768,463.00
267,599.13
1,036,062.13
19,153.00
New contract amount $
Working days added: 0
Working days subtracted: 0
Percent change in Contract to date 37.32%
1,055,215.13
ubmitt_ d y:
1. 4
- rotect Manager Date
7
71/ 4'
Re ide
f
t Engineer
e
Approved by:
2
Cit ngineer
.
Date
City Manager, required for Change Orders>$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by KINSMAN CONSTRUCTION, Inc.
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
CALIFORNIA
NATIONAL CITY POLICE DEPARTMENT UPGRADES
Specification #15-06
NATIONAL, ci-Tv
i — a 3'3V —==�
- INCORPORATED
CHANGE ORDER NO. 14, Attachment "A"
DATE: August 29, 2016
WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC
DESCRIPTION OF WORK: waterproofing around building
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1
Repair waterproofing around building perimeter
$ 19,153.00
2
3
TOTAL
$ 19,153.00
KINSMAN CONSTRUCTION, INC
TO: Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
Change Order Request #
31r.1
PHONE.
858-634-8180
DATE:
08/17/16
JOB NAME:
National City Police Department
LOCATION:
1200 Notional City Blvd
JOB NUMBER:
S5-029
FAX
858-634-8184
CONTRACT NUMBER:
Change Order Request #031 r.1
Item No. Description Amount
1. Additional Waterproofing per David Reed Recommendations $16,655.00
2.
OH&P $2,498.00
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
$19,153.00
DATE
08/17/16
BASE CONTRACT AMOUNT:
(original contract amount)
$0.00
- > ,_ _ _
INCREASE CONTRACT AMOUNT BY:
$19,153.00
AUTHORIZED SIGNATURE (CONTRACTOR)
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted.
All work to be performed under same terms and conditions
as specified in original contract unless otherwise
stipulated.
DATE OF ACCEPTANCE
SIGNATURE
(OWNER)
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228 phone / 619-336-4229 fax
Michael R. Dalla, CMC - City Clerk
KINSMAN CONSTRUCTION
Change Order #14
Police Department Building Improvements
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Kinsman Construction