Loading...
HomeMy WebLinkAbout2016 CON Fordyce Construction - Las Palmas Pool / Camacho Gym / Fire Station 31 improvement Project SP 16-02 - Change Order #6Las Palmas Pool, Camacho Gym and Fire Station 31 Specification #16-02 Contractor: Fordyce Construction, Inc. CHANGE ORDER NO. 6 August 25, 2016 Reason/Purpose for this Change Order: Upon direction from the City, the contractor was asked to provide a proposal to repair stucco and paint the exterior planter at FS 31 (COR 18). The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Exhibit "A" for the lump sum price of $2,194. Original Contract Amount 325,285.00 Net change by previously authorized Change Orders 99,291.00 Subtotal Amount of this change order New contract amount $ Working days added: 20 Working days subtracted: 0 424, 576.00 2,194.00 Percent change in Contract to date 31.20% 426,770.00 Su ' -- ed • fr:'-c /-//(2c Resident Engineer Date Date ' : ager Approved by: C. Engineer / Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by FORDYCE CONSTRUCTION, Inc. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA ^� Las Palmas Pool, Camacho Gym and Fire Station 31 Specification #16-00 NATIONAL L CJ l ZNCORPOR AT CHANGE ORDER NO. 6, Attachment "A" DATE: August 25, 2016 WORK PERFORMED BY: FORDYCE CONSTRUCTION, INC DESCRIPTION OF WORK: stucco repair and paint ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Stucco repair and paint exterior planterbox 2,194.00 2 3 4 5 Subtotal 2,194.00 FORDYCE CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 COST ESTIMATE SUMMARY SHEET for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Description of Work: 18 - Stucco patch and paint at front planter Contractor: Fordyce Construction COR #: Spec No: 16037 Date: 7/21/2016 Worksheet Description Totals 1 Prime Contractor (Includes Prime Contractor Mark Up) $0.00 2 Sub -Contractor (Includes Prime Contractor Mark Up) $2,161.30 Subtotal: $2,161.30 1.5% BOND: $32.42 GRAND TOTAL : $2,194.00 ORDYCE II CONSTRUCTION 9932 Prospect Ave., #138 Santee, CA 92071 Phone (619) 449-4272 Fax (619) 449-1930 License # 608529 GENERAL CONTRACTOR - COST ESTIMATE for EXTRA WORK Project: Las Palmas Pool,Camacho Gym and Fire Station 31 Contract No. Description of Work Prepared By: Amy Crandall COR: 18 - Stucco patch and paint at front planter Contractor: Fordyce Construction Inc. Date: 07/21/16 Project No. 14002 Item Description Qty Unit Materials Unit Cost Total Man Hours Labor Labor Rate Total Base Labor Equipment Unit Cost Total Sub- contractor Cost Labor 1 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 0 hr 0 50.13 0.00 quipmen 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Materials 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Subcontractor Costs Nurse stucco 1,400.00 Canady paint 658.38 SUBTOTAL $0.00 $ - $0.00 $2,058.38 Sales Tax/Labor Burden 8.75% $0.00 34.32% $ _ $0.00 Total Without Mark Ups $0.00 $ - $0.00 $2,058.38 Mark -Up Percentages_ 15% $0.00 20% $ - 15% $0.00 5% S 102.92 Total with Mark -Up * Mat'I $0.00 * Labor $ - * Equip. $0.00 *Subcont. $2,161.30 Grand Subtotal: $2,161.30 BOND @: 1.50%f J $32.42 GRAND TOTAL : $2,194.00 CANADY PAINTING INC. EXTRA WORK ORDER Fordyce Construction SHIP TO Fire Station # 31 National City W.O. NUMBER: 01 W.O. DATE REQUESTED BY 7/21/16 Owner TYPE OF WORK Additional INVOICE # FOR BILL TERMS To follow Added as CO DESCRIPTION HOURS RATE AMOUNT 1 Prime and paint stucco at existing planter Box in the front of The Fire station 6 68.75 412.50 Materials for planter 2 gallons stucco prime and 2 gallons elastomeric 4 ea 40.00 160.00 Total Before P & OH 572.50 15%P&OH 85.88 Subtotal 658.38 Other 0 TOTAL 658.38 AUTHORIZED BY CANADY PAINTING, INC. 789 Sunny Hills Ct. Ramona, CA 92065 760/789-1823 Phone 760/789-1823 Fax CA License 901315 canadyco@cox.net DATE NURSE STUCCOINC. 12030 Short St. Lakeside Ca. 92040 PROPOSAL and CONTRACT (619) 561-7429 fax (619) 312-0739 A+ Member of the BBB www.nursestucco.com blaine(cr)nursestucco.com Project information: 2333 Euclid Ave. Owner/Contractor: Fordyce Construction DIR REG # 1000004093 Lic # 783696 Date: 23-Jun-16 Attn: Vince Ph: 820-7832 Fax: email: vcrisci ct_fordyceconstruction.com Description of Work: Chip back areas around planter box, re lath plaster area to match existing as close as possible$1,400.00 Scaffolding: Exclusions: All of the above work to be completed in a substantial and workmanlike manner according to standard practices for the sum of: As Decided Progress payments to be made as follows: At progress **Credit card payments add 3.5% to contract amount. Additional Work/Square Footage if necessary, $ 55.00 per hour ($ 75.00 prevailing) plus materials (15% mark-up on materials) General Conditions Insurance Maximums: 1 million auto, comp & GL, 2 million agg. Water to be provided on -site at no expense. NURSE STUCCO, INC. is not responsible for stucco discoloration, cracking, or roofing materials. Payments due per contract will accrue interest @ 1 1/2% per month after 30 days. NURSE STUCCO, INC. is authorized to furnish all materials and labor required to complete the work mentioned in this contract. This contract shall govern this project and supersede all others. Persons signing this contract shall be the owner or qualified officer of the company. This document shall become a binding contract between the parties only after it has been signed. Any alteration or deviation from the above specifications involving extra cost of material or labor will only be executed upon written orders for same, and will become an extra charge over the sum mentioned in this contract. All agreements must be made in writing. Attorney's Fees: If either party commences any legal action or proceeding against the other party to enforce the provisions of this contract, the prevailing party is entitled to recover from the other party reasonable attorneys' fees and costs of suit, including cost of legal notices and costs of appeal. California contractors are required by law to be licensed and regulated by the Contractor's State License Board and questions concerning any contractor may be referred to the Registrar of the Board whose address is Contractors State License Board, 1020 N Street, Sacramento, CA 95814. ...Nurse Stucco is a Non -Union shop... Submitted by: Quote valid for 60 days (90 days specifically required by specifications) Blaine Nurse * Accepted by: President Nurse Stucco, Inc. Eeabte Zeta Title: Date: * Agreed to pay the amount in said proposal in accordance to the terms thereof . Page 1 of 1 ': AL Cl"..''' CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 phone / 619-336-4229 fax Michael R. Dalla, CMC - City Clerk FORDYCE CONSTRUCTION Change Order #6 Las Palmas Pool, Camacho Gym & Fire Station 31 Improvements Project Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Fordyce Construction