Loading...
HomeMy WebLinkAbout2016 CON Fordyce Construction - Las Palmas Pool / Camacho Gym / Fire Station 31 improvement Project SP 16-02 - Change Order #9CALIFORNIA — NATIONAL Env airy XNCORPORATED Las Palmas Pool, Camacho Gym and Fire Station 31 Specification #16-02 Contractor: Fordyce Construction, Inc. Reason/Purpose for this Change Order: Upon direction from the City, the contractor was asked to provide a proposal to provide additional cabinetry work in the council chambers. CHANGE ORDER NO. 9 November 16, 2016 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor will provide all the services described in Exhibit "A" for the lump sum price of $5,448. Original Contract Amount $ Net change by previously authorized Change Orders $ Subtotal Amount of this change order New contract amount Working days added: 20 Working days subtracted: 0 325,285.00 165,687.00 490,972.00 5,448.00 Percent change in Contract to date 52.61 496,420.00 ?Stibinitted b .......... Prole anager // . Da a /G11(� Resident Engineer Date Approved by: City Manager, required for Change Orders 424,999 Date Cit ngineer Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to byFORDYCE CONSTRUCTION, Inc. e: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 4- CALIFORNIA -e Las Palmas Pool, Camacho Gym and Fire Station 31 Specification #16-02 NALT IIacm IONAL CIT ' NCORPORATED CHANGE ORDER NO. 9, Attachment "A" DATE: November 16, 2016 WORK PERFORMED BY: FORDYCE CONSTRUCTION, INC DESCRIPTION OF WORK: Council Chamber cabinetr ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1 Council Chambers Cabinetry Work 5,448.00 2 3 4 5 Subtotal 5,448.00 'ORDYCE ONSTRUCTION 9932 Prospect Ave., #138, Santee, CA 92071, Phone (619) 449-4272, DIR # 1000003113, License # 608529 November 08, 2016 Submitted to: National City 1243 National City Blvd. National City, Ca. 91950 derrick@ppc-sd.com Attn: Derrick Anderson Job Site: Council Chambers Desk Area Labor and materials furnished to complete the following: 1. Re -Laminate Upper and Lower Counter Tops (excluding front edge ) 2. Re -Laminate Interior Sides Excluded: After hours work Audio visual systems removal, re -install or modifications Electrical Flooring No metal hardware for existing walls Front edge of counter due to electrical devices For the sum of: Five Thousand Four Hundred Forty Eight Dollars ($5,448.00). Payment to be made as follows: In full upon completion All material is guaranteed to be as specified. All work to be done in a workmanlike manner according to standard practices. Any alteration or deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above this estimate. FORDYCE CONSTRUCTION CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk FORDYCE CONSTRUCTION, INC. Change Order #9 Las Palmas Pool, Camacho Gym, Fire Station 31 Improvements Project Judy Hernandez (Engineering/PW) Forwarded Copy of Change Order to Fordyce Construction, Inc.