Reason/Purpose for this Change Order:
Upon direction from the City, the contractor was asked to provide a proposal to provide additional cabinetry work
in the council chambers.
CHANGE ORDER NO. 9
November 16, 2016
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor will provide all the services described in Exhibit "A" for the
lump sum price of $5,448.
Original Contract Amount $
Net change by previously authorized Change Orders $
Subtotal
Amount of this change order
New contract amount
Working days added: 20 Working days subtracted: 0
325,285.00
165,687.00
490,972.00
5,448.00
Percent change in Contract to date 52.61
496,420.00
?Stibinitted b
..........
Prole anager
//
.
Da a
/G11(�
Resident Engineer
Date
Approved by:
City Manager, required for Change Orders 424,999
Date
Cit ngineer
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to byFORDYCE CONSTRUCTION, Inc.
e:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor
cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
4- CALIFORNIA -e
Las Palmas Pool, Camacho Gym and Fire Station 31
Specification #16-02
NALT IIacm
IONAL CIT
' NCORPORATED
CHANGE ORDER NO. 9, Attachment "A"
DATE: November 16, 2016
WORK PERFORMED BY: FORDYCE CONSTRUCTION, INC
DESCRIPTION OF WORK:
Council Chamber cabinetr
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1
Council Chambers Cabinetry Work
5,448.00
2
3
4
5
Subtotal 5,448.00
'ORDYCE
ONSTRUCTION
9932 Prospect Ave., #138, Santee, CA 92071, Phone (619) 449-4272, DIR # 1000003113, License # 608529
November 08, 2016
Submitted to:
National City
1243 National City Blvd.
National City, Ca. 91950
derrick@ppc-sd.com
Attn: Derrick Anderson
Job Site:
Council Chambers Desk Area
Labor and materials furnished to complete the following:
1. Re -Laminate Upper and Lower Counter Tops (excluding front edge )
2. Re -Laminate Interior Sides
Excluded:
After hours work
Audio visual systems removal, re -install or modifications
Electrical
Flooring
No metal hardware for existing walls
Front edge of counter due to electrical devices
For the sum of:
Five Thousand Four Hundred Forty Eight Dollars ($5,448.00).
Payment to be made as follows:
In full upon completion
All material is guaranteed to be as specified. All work to be done in a workmanlike manner according to
standard practices. Any alteration or deviation from the above specifications involving extra costs will be
executed only upon written orders and will become an extra charge over and above this estimate.
FORDYCE CONSTRUCTION
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
FORDYCE CONSTRUCTION, INC.
Change Order #9
Las Palmas Pool, Camacho Gym, Fire Station 31
Improvements Project
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Fordyce Construction, Inc.