HomeMy WebLinkAbout2016 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #9 through #124-- CALIFORNIA
NATIONAL Cx
rlvcoRJo Ep
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
Reason/Purpose for this Change Order:
Two palm trees were in conflict with the new sidewalk improvements and had to be removed on the South side of
Plaza Blvd adjacent to USA gasoline. Under direction of the Engineer the Contractor proceeded under time and
materials to remove and dispose of the two palm trees.
CHANGE ORDER NO. 9
October 25, 2016
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with removing and disposing of two palm
trees on the South side of Plaza Blvd adjacent to USA Gasoline. The agreed upon price for all costs associated
with this work is as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
43,411.86
1, 937, 909.96
2,115.82
New contract amount . $ 1,940,025.78
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 2.40%
Submitted by:
gi
Approved by:
/l6
ate
it/?r//‘
Date City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
k ,� Ito .................
Name: ate
Note to Contractor. If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1248 National City Boulevard, National City, CA 91950 Telephone (6191-336-4380
CALIFORNIA
NATIONAL CITY
c e u
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
CHANGE ORDER NO. 9
DATE: September 21, 2016
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Remove and haul off 2 Palm Trees on South side of Plaza at City
empty lot
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
2)
Foreman
Operator
Hour
Hour
3.00
3.00
80.20
77.23
240.60
231.69
3
Laborer
Hour
3.00
55.52
166.56
$ 638.85
$ 127.77
$ 766.62
MATERIALS
Unit
Qty
Rate
Total
1)
2)
3)
Landfill
Landfill
Landfill
Tons
Tons
Tons
4.00
2.00
4.00
50.75
48.50
56.25
203.00
97.00
225.00
$ 525.00
Sub -Total Materials:
Materials Markup (15%):
TOTAL MATERIALS:
78.75
EQUIPMENT
Unit
Qty
Rate
Total
1)
2)
138 Excavator
Super 10 Wheel Dump Truck
Hour
Hour
3.00
3.00
138.00
72.00
414.00
216.00
$ 630.00
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
BOND AND INSURANCE (1%):
$ 94.50
724.5
$
20.95
GRAND TOTAL:
$2,115.82
Sub -Total Labor:
Labor Markup (20%):
TOTAL LABOR:
Transaction #: 10785783
Account #: 8005787/DMI
THE CITY OF SAN DIEGO
ENVIRONMENTAL SERVICES DEPARTMENT
REFUSE DISPOSAL DIVISION
9601 RIDGEHAVEN CT., SUITE 310 • SAN DIEGO, CA 921P311I636
(858) 694-7000
Date: 9/21/2016 10:27:55
Scale Operator: LCS
Fleet #: Tag #: Outgoing /FB 05
Transaction Type: 01/BUS.-- NON RESIDENTIAL
Payment Type: 01/CHARGE 01/CHARGE
Hauler Type: 01/BUS.-- NON RESIDENTIAL
Vehicle Type: 007/TRUCK - 3 AXLE (10 CY)
Material Type: 001/REFUSE
Origin: 001/SAN DIEGO CITY
Special Fees:
Operating hours 7:00-4:30 NO HAND UNLOADS AFTER 4.00 PM.
MIRAMAR LANDFILL
5180 CONVOY STREET
SAN DIEGO, CA 92111
8005181-
'LBS TONS
Gross Weight 34800.00 17.40
Tare Weight 27160.00 13.58
Net Weight 7640.00 3.82
Tip Fee $ 130.00
Spec Fee $ 0
RCBus Tax $ 31.00
Recycle $ 42.00
Total $ 203.00
ES-072 (REV. 7-09)
`a Prinletl on Recycled Pope, This information is available in alternative formats upon request. SIGNATURE
THE CITY OF SAN DIEGO
ENVIRONMENTAL SERVICES DEPARTMENT
REFUSE DISPOSAL DIVISION
9601 RIDGEHAVEN CT., SUITE 310 • SAN DIEGO, CA 9244636
(858) 694-7000
Transaction #: 10785916
Account #: 8005787/DMI
Fleet #: Tag #:
Transaction Type: 01/BUS.-- NON RESIDENTIAL
Payment Type: 01/CHARGE
Hauler Type: 01/BUS.-- NON RESIDENTIAL
Vehicle Type: 007/TRUCK - 3 AXLE (10 CY)
Material Type: 001/REFUSE
Origin: 001/SAN DIEGO CITY
Special Fees:
'MIRAMAR LANDFILL
- 5180 CONVOY STREET
SAN DIEGO, CA 92111
800S181-
Date:9/21/201611:35:02 LBS TONS
Scale Operator: LCS
Incoming /FB 01
74.96% of Surety Bond remains
Operating hours 7:00-4:30 NO HAND UNLOADS AFTER 4:00 PM.
Gross Weight 30820.00 15.41
Tare Weight 27160.00 13.58
Net Weight 3660.00 1.83
Tip Fee $ 62.00
Spec Fee $ 0
RCBus Tax $ 15.00
Recycle $ 20.00
Total $ 97.00
ES-072 (REV. 7-09)
iiPrinledanRecycled Paper This information is available in alternative formats upon request. SIGNATURE
THE CITY OF SAN DIEGO
ENVIRONMENTAL SERVICES DEPARTMENT
REFUSE DISPOSAL DIVISION
9601 RIDGEHAVEN CT., SUITE 310 • SAN DIEGO, CA 92123-1636
(858) 694-7000 i
Transaction #: 10786121
Account #: 8005787/DMI
Fleet #: Tag #:
Transaction Type: 01/BUS.-- NON RESIDENTIAL
Payment Type: 01/CHARGE
Hauler Type:
Vehicle Type:
Material Type:
Origin:
Special Fees:
1(0(1107
Date: 9/21/2016 13:31:56
Scale Operator: QDQ
Incoming /FB 01
01/BUS.-- NON RESIDENTIAL
007/TRUCK - 3 AXLE (10 CY)
001/REFUSE 72.71% of Surety Bond remains
001/SAN DIEGO CITY
Operating hours 7:00-4:30 NO HAND UNLOADS AFTER 4:OO PM
ES-072 (REV. 7-09)
iiPrinted onRecycled Paper This Information is available in alternative formats upon request.
MIRAMAR LANDFILL
5180 CONVOY STREET
SAN DIEGO, CA 92111
80051gI - TONS
Gross Weight 35640.00
Tare Weight 27160.00
17.82
13.58
Net Weight 8480.00
4.24
Tip Fee $ 144.00
Spec Fee $ 0
RCBus Tax $ 34.00
Recycle $ 47.00
Total $ 225.00
SIGNATURE
CALIFORNIA,+
NNTIONAL envy.
n'q3,
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 10
October 26, 2016
Reason/Purpose for this Change Order:
A shallow caltrans electrical conduit was discovered from stations 58+00 to 59+09 encased in concrete within our
improvement subgrade section and needed to be removed to meet the required grades. Under direction of the
Engineer the Contractor proceeded under time and materials to remove the Caltrans encasement.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with removing and disposing of the Caltrans
conduit concrete encasement from stations 58+00 to 59+09. The agreed upon price for all costs associated with
this work is as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount 1,894,498.10
Net change by previously authorized Change Orders 45,527.68
Subtotal
Amount of this change order
New contract amount
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 2.51%
Submitted by:
1,940,025.78
1,940.43
Pro' ct Man
Approved by:
1,941,966.21
Date
/zi?//‘
Cit Engineer Date City Manager, required for Change Orders ,$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved. Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
Na e: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National -City, CA 91950
Telephone (619) 336-4880
I/,
CALIFORNIA
NATIONAL CITY
?NCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification # 16-01
CHANGE ORDER NO. 10
DATE: October 6, 2016
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Remove Caltrans electrical encasement from Sta 58+00 to 59+09
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
2)
3
Foreman
Operator
Laborer
Hour
Hour
Hour
3.00
3.00
3.00
80.20
77.23
55.52
240.60
231.69
166.56
Sub -Total Labor:
Labor Markup (20%):
TOTAL LABOR:
$ 638.85
$ 127.77
$ 766.62
MATERIALS
U
1)
Dump Concrete(Ticket #316082)
nit Rate Total
LS 225.00 225.00
Sub -Total Materials: $ 225.00
Materials Markup (15%): $ 33.75
TOTAL MATERIALS:
Qty
1.00
EQUIPMENT
Unit
Qty
Rate
Total
1)
2)
3)
4)
650 Bobcat Skidsteer
U35 Mini -Excavator
Utility Truck
Super 10 Wheel Dump Truck
Hour
Hour
Hour
Hour
3.00
3.00
1.00
6.00
49.00
50.00
50.00
72.00
147.00
150.00
50.00
432.00
Sub -Total Equipment:
Equipment Markup (150/0):
$ 779.00
$ 116.85
TOTAL EQUIPMENT:
BOND AND INSURANCE (10/0):
95.85
$ 19.21
GRAND TOTAL:
$1,940.43
SUPERIOR READY MIX
CONCRETE, L.P.
1508 W. MISSION RD. • ESCONDIDO, CA 92029
PHONE: (760) 745-0556FAX: (760) 740.9557
DICK MILLER INC
930 BOARDWALK SUITE H
SAN MARCOS, CA 92078
INVOICE
is::Liw, QR'iz'::i??tc?:::i::`•'.#::::9::Sa:::i:;:::::: .:: .: ':::;
MILLE005 10/07/2016 820098 1
TERMS: NET 30 DAYS
A FINANCE CHARGE WILL BE IMPOSED ON PAST DUE ACCOUNTS. THE
FINANCE CHARGE IS COMPUTED BY A' PERIODIC RATE OF1 1/2% PER
MONTH, WHICH IS AN ANNUAL PERCENTAGE RATE OF 18%OR A MINIMUM
SERVICE CHARGE 0E36.00 WHICHEVER IS GREATER.
000178 (16007) PLAZA BLVD. WIDENING CIP 16-01
PLAZA BLVD. & N AVE. NATIONAL CITY
PO NUMBER: 16007
10/07/16 1.00 LD DUMP C225
DUMP CONCRETE
TICKET DATE TOTALS:
JOB TOTALS
TICKETS: 022-316082
225.000 0.00
225.00 0.00
225.00 0.00
OCT 15 2016
BY:
225.00
225.00
225.00
CALIFORNIA '.
N ATIONAL Critir
L113 / .�
NCORPORATSO3
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
Reason/Purpose for this Change Order:
An alternate location had to be dug for the foundation of the street light at station 58+23 because of multiple
utility conflicts. Under direction of the Engineer the Contractor proceeded under time and materials to dig a new
street light foundation hole.
CHANGE ORDER NO. 11
October 26, 2016
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with digging a new street light foundation
hole at station 58+23. The agreed upon price for all costs associated with this work is as stated on this Change
Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
47,468.11
1,941,966.21
Amount of this change order 827.71
New contract amount
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 2.55%
Submitted by:
Net change by previously authorized Change Orders
Subtotal
r.`ect Man;'
proved by:
2/6/#b
Date
$ 1,942,793.92
City! ngineer / � Date 'City Manager, required for Change Orders>$24999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
It/A ftb__
Name: Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
124-8 Natio- nal—City Boulevard, National City, CA 9.1950 Telephone (619) 336-4386
CALIFORNIA
NATIONAL CIln
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
DATE: October 13, 2016
CHANGE ORDER NO. 11
WORK PERFORMED BY: Perry Electric
DESCRIPTION OF WORK: Find new location for Streetlight foundation at 58+23.
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
2)
UT TECH 2 - Carlos Balderas
Hour
5.00
37.99
189.95
3)
UT TECH 3 - Arturo Cardenas
Hour
5.00
30.99
154.95
Utility Truck 12-20
2) Compressor
Unit
LF
Unit
Hour
Hour
Qty
400.00
Qty
5.00
5.00
Rate
0.13
Rate
28.17
17.33
$ 344.90
$ 41.39
$ 68.98
Total
52.00
$ 52.00
$
4.16
7.80
Total
140.85
86.65
$ 227.50
$ 34.13
$ 261.63
$ 39.04
$ 7.81
GRAND TOTAL:
$ 827.71
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
TOTAL LABOR:
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
PRIME CONTRACTOR MARKUP (5%)
BOND AND INSURANCE (1%):
CALIFORNIA --
NA.1. ONAL cfr
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
Reason/Purpose for this Change Order:
Two lighted entry signs had to be relocated to the new back of sidewalk at the Stardust Inn. Under direction of
the Engineer the Contractor proceeded under time and materials to relocate two lighted entry signs.
CHANGE ORDER NO. 12
October 26, 2016
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with relocating two lighted entry signs to the
new back of sidewalk at the Stardust Inn. The agreed upon price for all costs associated with this work is as
stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
48,295.82
1,942,793.92
1,308.27
New contract amount $
Working days added: 0
Submitted by:
Pro Manag
A•roved by:
Cityngineer
Working days subtracted: 0
/z/10�
Date City Manager, required for Change Orders>s24,999 Date
Percent change in Contract to date 2.62%
1,944,102.19
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
me: i Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1 - National City Boulevar, National City, CA 91J50 Telephone 61 43
tt/1t/i6
CALIFORNIA
NATIONAL CITy
±NCORPORATED
ft
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
DATE: October 14, 2016
CHANGE ORDER NO. 12
WORK PERFORMED BY: Perry Electric
DESCRIPTION OF WORK: Relocate 2 entry signs for Stardust Inn
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
Unit
Qty
Wage
Total
1)
UT TECH 2 - Carlos Balderas
Hour
8.00
37.99
303.92
2)
UT TECH 3 - Arturo Cardenas
Hour
5.00
30.99
154.95
3)
UT TECH 4 - Angel Sandoval
Hour
5.00
22.73
113.65
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
TOTAL LABOR:
$ 68.70
$ 114.50
MATERIALS
Unit
Qty
Rate
Total
1)
6- bags of 901b concrete
LS
1.00
20.26
20.26
2)
CES 1/2" Conduit/ Adap. Jbox
LS
1.00
40.89
40.89
3)
CES 180' #10 THW Wire
LS
1.00
36.16
36.16
$ 97.31
$ 7.78
$ 14.60
9.6
EQUIPMENT
Unit
Qty
Rate
Total
1)
Utility Truck 12-20
Hour
8.00
28.17
225.36
2)
Compressor
Hour
5.00
17.33
86.65
$ 312.01
$ 46.80
$ 358.81
$ 61.71
$ 12.34
GRAND TOTAL:
$1,308.27
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
PRIME CONTRACTOR MARKUP (5%)
BOND AND INSURANCE (1%):
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
$ 572.52
BLOCK a BRICK
111111E1
lllllllllfIIILIIlI
RCP Block & Brick, Inc.
8755 Magnolia Avenue
Santee, CA 92071
619-448-2240
www.rcpblock.com
The San Diego Original Since 1947
INVOICE
it
30953367
ORDER NUMBER 10846816
I'ICK Tl . 0788888.
CUSTOMER ID 111199
P-.O. NUMBER 658
01 01+6 2:59 ram
loft
p i}1-Te;
PERRY ELECTRIC
PO BOX 710130
SANTEE , CA 92072
Attn: CARLOS BALDERAS
Customer Note; **** ALL PURCHASES MUST HAVE A JOB NUMBER NO EXEPTIONS. CALL OFFICE IF EMPLOYEE DOES NOT HAVI
A JOB NUMBER****
Strip —To.
JOB-658
__
PAGE
Quantities
Item ID
Item Description
Pricing
UOM
Unit
Price
Extended
. Price
Lire
Ordered
Shipper
Remaining
Disp.
4.0000 4.0000 0.0000 412090
1 HI -STRENGTH 901b CONCRETE MIX
SAKRETE
i
EA
4.6900
18.76
Trait Type: Final Sale
Cardholder: CARLOS BALDERAS RefNunL 813903
Ace& 3065
Balch: 1030 Aulis Amni: 20,26
Merck ID: 17400745 RelNurn: 1589931146
Total Lines: I
ITEM TOTAL: 18.76
SALES TAX: 1.50
Visa: 20.26
Signature: AMOUNT DUE: 0.00
l agree to pay total amount according to card issuer agreement.
I am ackn edgf]g'anda'gr:eeing-to-the terms-arrdgeneral-conditions-below-and-on-lhe-baekofthicinvoiee.
IVe will make every effort to load and unload vehicles with care. however. vehicles are loaded and unloaded al customers risk.
Claims for shortages or incorrect merchandise will not be honored after the material has left the sales Yard.
SOLD TO:
CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA
1011 BAY BLVD.
CHULA VISTA, CA 91911
T:619 427-2370 F:619 427-5416
T 6 M ELEC/DBA PERRY
JOB #696
PO BOX 710130
SANTEE, CA 92071
***DUPLICATE***
***US -MAIL***
SHIP TO:
INR.'OICE NO.
INVOICE DATE
-718824
10/19/16
PLEASE SHOW INVOICE NO. AND REMIT TO:
P.O BOX 509079
SAN DIEGO, CA 92150
T-6j8 451-7090 E:858 451-7094
T & M ELEC/DHA PERRY
1011 BAY BLVD.
CHULA VISTA, CA 91911
ACCOUNT NO. KY-97994
JOB #696 Pr.A7A BLVD
JOB NAME AND ADDRESS
EXTRA WORK
CUSTOMER ORDER NO.
696-824
SALESPERSON
1448 ART
SHIPPING INFORMATION
PREPAID
SHIP VIA
WILL CALL
SHIP DATE
10/14/16
QUANTITY
ORDERED PRODUCT CODE DESCRIPTION
QUANTITY
SNIPPED
•
PRCE.
EXTENSION
2 PVC 444BOX J-BOX
6 PVC SCH4OELL1/2X90 90D PVC ELL
6 PVC TA1/2 TERM ADAPTER
4 PVC COUP1/2 PVC COUPLING
100 PVC SCH40-1/2 CONDUIT
HAL 01905E 1/2 DC LOCKNUT
LoC))&qc
2
6
6
4
100
6
LAO
1106.57 C
63.70 C
15.32 C
16.83 C
18.32 C
12.65 C
22.13
3.82
0
0.67
18.32
0.76
TITLE AND RISE OF LASS OR DAMAGE TO MERCHANDISE PASSES AT POINT OF
SHIPMENT. CLAIMS FOR SHORT OR DAMAGED MERCHANDISE SROUTA BE MADE
TO rxnuTrR.
MERCHANDISE RETURNED ii1THO0T 00R CONSENT WILL NOT BE ACCEPTED. A
RESBDCRING CHARGE WILL HE MADE ON REIUNREU GOODS UNLESS DEFECTIVE
OR Taco ERROR ON OUR PART.
A SERVICE CHARGE OF 1.55 PER WORTH, BUT NOT TO EXCEED THE HIGHEST
AMOUNT LAWFULLY ALLOWED HT CONTRACT IN THIS STATE, WILL HE NAME ON
ALL PAST DUE ACCOUNTS.
THIS SALE IS SUBJECT TO OUR TERNS LOCATED AT SAIES.00R-TERMS.COM,
WRICH ME MAY CHANGE FROM TIME TO TINE WITHOUT PRIOR NOTICE.
CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE I5 USED 011
INVOICES.
H - HACK ORDERED. WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CAN
C - CANCELLED NOT IN STOCK. UNABLE TO PURCHASE : ,DCALLY.
OUR
MERCNAND15E
S4ESTAX 8.000
SHIPPING CHARGE
46.62
3.73
.00
NET PAYMENT IS DUE BY THE 15TH OF
THE MONTH FOLLOWING PURCHASE
TOTAL DUE
50.35
CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA
1011 BAY BLVD.
CHIILA VISTA, CA 91911
T:619 427-2370 F:619 427-5416
)LD TO: T 6 M ELEC/DBA PERRY
PO BOX 710130
SANTEE, CA 92071
***DUPLICATE.**
***US -MAIL***
I
SHIPTO: T
1011
CHULA
INVOICE NO I INVOICE DATE
1069-716971 09/13/16
PLEASE SHOW INVOICE NO. AND REMIT TO:
P.O. BOX 509079
SAN DIEGO, CA 92150
T•859 451-7090 F•858 451-7094
6 M ELEC/DBA PERRY
BAY BLVD.
VISTA, CA 91911
ACCOUNT NO. KY-98322
JOB #718 PLAZA BLVD
JOB NAME AND ADDRESS
PLAZA BLVD
1
CUSTOMER ORDER NO.
718-971
SALESPERSON
1448 RJ
SHIPPING INFORMATION
PREPAID
I SHIP VIA
WILL CALL
SHIP DATE
09/12/16
QUANTITY
ORDERED PRODUCTCODE DESCRI01100
-
i
QUANTITY.
SNIPPED -
PRICE
•
-. DISC EATENSION
CM
2500 WIRE THW10BLACKSTR WIRE
2500 WIRE THWIOWHITESTR WIRE
' 1 ROPE 1/2X3000PULLTAPE 3/4X3000 25
1 IDEAL 31385 SGAL PULLIN
-aCoxZ1-
- JCL \ 5LC
OLB MULE TAPE
LUBE
V
2500
2500
1
1
186.00
18.00
184.60
68.61
M 465.00
M 465.00
E 184.60
E 68.61
TITLE AND RISE OF LOSS OR DAMAGE TO MERCHANDISE PASSES AT POINT 0
SHIPMENT. CLAIMS FOR SHORT OR DAMAGED MERCHANDISE SHOULD HE MADE
TO CARRIER.
MERCHAIDISE RETURNED WITHOUT OCR CONSENT WILL NOT BE ACCEPTED. A
RESTOCK/NG CHARGE WILL BE MADE ON RETURNED GOODS UNLESS DEFECTIVE
OR THRU ERROR ON OUR PART. -
A SERVICE CHARGE OF 1.51 PER MONTH, HUT NOT TO EXCEED THE HIGHEST
AMOUNT LAWFULLY ALLOWED BE CONTRACT IN THIS STATE, WILL HE MADE
ALL PAST DUE ACCOUNTS.
THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERMS.CCM,
WHICH WE NAY CHANGE FROM TDS TO TIME WITHOUT PRIOR NOTICE.
CODE: TO ADVISE
INVOICES.
B - BACK ORDERED.
C - CANCELLED
TOO PROMPTLY CONCERNING YOGI
WILL SHIP AS SOON AS RECEIVED
NOT IN STOCK. UNABLE TO PURCHASE
ORDER, TEIS CODE IS USED ON OUR
UNLESS INSTRUCTED TO CANCEL.
IMATLY.
MERCHANDISE
SALESTA% 8.000
SHIPPING CHARGE
1183.21
94 .66
.00
'
NET PAYMENT IS DUE BY THE 15TR
THE MONTE FOLLOWING PURCAKSE
-"
1
OF
TOTAL DUE
1277.87
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
DICK MILLER, INC.
Change Order #9 through #12
Plaza Blvd. Widening "N" Avenue to 1-805
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Orders to Dick Miller, Inc.