CHANGE ORDER NO.17
December 14, 2016
Reason/Purpose for this Change Order.
.The City asked for a proposal to repair the deck slab waterproofing between the planter box and ADA parking stall
on the parking deck (COR 37R1), to relocate the existing flag pole light located on the roof and replace two red exit
signs with green signs (COR 38), and to remove wall covering and replace wth textured painted surface (COR 39),
and irrigation trench backfill (COR 41).
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor will provide all the services described in Attachment A for the
price of $22,436.27 and as further described in change order requests 37R1, 38, 39 and 41, attached.
Original Contract Amount $ 768,463.00
337,649.13
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount ....................................
Working days added: 0 Working days subtracted: 0
1,106,112.13
22.436.14
Percent change in Contract to date 46.86%
1,128,548.27
Sub , — • bis
Flip
if
• �~ 1 pagager
2
2s'�l 7
R
i► •;-
ident E ' ; _ _.
I
Il3olt7
Date
Approved by:
th ob 7
Date
City Manager, required for Change Orders >s24,999
Date
City ngineer
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its
price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein_ Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not linked to all equipment, materials, labor, supervision, overhead, fees, bonds,
insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are
incorporated herein.
Accgptetraii• greed to by KINSMAN CONSTRUCTION, Inc.
J /Y�IJ17
Date
Note to r' not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and
you . proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
0 - finals: City Clerk, Contractor cc: Engineering project file, Project Manager
41- CALIFORNIA —41-
NATIONAL CITY POLICE DEPARTMENT UPGRADES
Specification #15-06
NATIONAL CITY
INCOAPOgATED
CHANGE ORDER NO. 17, Attachment "A"
DATE: December 14, 2016
WORK PERFORMED BY: KINSMAN CONSTRUCTION, INC
DESCRIPTION OF WORK: Additional electrical and landscaping work
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1
Waterproofing of topping slab near planterbox
$ 13,934.00
2
Relocate existing flag pole light, change emerency exit lights
$ 2,280.14
3
Remove wallcovering and replace with textured and painted surface
$ 2,648.00
4
Irrigation trench backfill
$ 3,574.00
TOTAL
$ 22,436.14
TO:
KINSMAN CONSTRUCTION, INC
Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
Change Order Request #
37r
PHONE:
858-634-8180
DATE:
11/16/16
JOB NAME:
National City Police Department
LOCATION:
1200 National City Blod
JOB NUMBER:
S5-029
FAX:
858-634-8184
CONTRACT NUMBER:
Change Order Request #037r
Item No. Description Amount
Remove existing waterproofing under the topping slab and apply new $5,994.00
per David Reed Consulting.
1. Remove by way of pneumatic scrapers and then diamond grinders the existing
waterproofing membrane.
Prime prepped concrete with CIM 61TN Primer
Install 120 mils of CIM 1000 and the drainage panel (if required)
2. Demo approx 175sf concrete and remove from site. Install #3 bar at 18" Ocew, $7,276.00
supply concrete walkway with rock salt finish.
OH&P $664.00
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
$13,934.00
DATE
11/16/16
BASE CONTRACT AMOUNT:
(original contract amount)
$0.00
AUTHORIZED SIGNATURE (CONTRACTOR)
INCREASE CONTRACT AMOUNT BY:
$13,934.00
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted. All
work to be performed under same terms and conditions as
specified in original contract unless otherwise stipulated.
DATE OF ACCEPTANCE
SIGNATURE
(OWNER)
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
TO:
KINSMAN CONSTRUCTION, INC
Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
Change Order Request #
038
PHONE:
858-634-8180
DATE.:
11/15/16
JOB NAME:
National City Police Department
LOCATION
1200 National City BI ud
JOB NUMBER:
S5-029
FAY
858-634-8184
CONTRACT NUMBER:
Change Order Request #038
Item No. Description Amount
1. Remove and relocate EX roof top flag pole lite. $1,020.44
2. Furnish and install (2) new green exits $962.70
OH&P $297.00
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
$2,280.14
DATE
11/15/16
BASE CONTRACT AMOUNT:
(original contract amount)
$0.00
AUTHORIZED SIGNATURE (CONTRACTOR)
INCREASE CONTRACT AMOUNT BY:
$2,280.14
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted. All
work to be performed under same terms and conditions as
specified in original contract unless otherwise stipulated.
DATE OF ACCEPTANCE
SIGNATURE
(OWNER)
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
TO:
KINSMAN CONSTRUCTION, INC
Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
Change Order Request #
039
PHONE:
858-634-8180
DATE:
11/15/16
JOB NAME:
National City Police Department
LOCATION:
1200 National City Blvd
JOB NUMBER.
S5-029
FAX
858-634-8184
CONTRACT NUMBER:
Change Order Request #039
Item No. Description Amount
1. Remove existing wall covering from floor to chair rail 3 ft AFF. $1,775.00
Putty coat wall, apply orange peel.
Paint wall, color to match existing. $528.00
$345.00
OH&P
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
$2,648.00
DATE
11/15/16
BASE CONTRACT AMOUNT:
(original contract amount)
$0.00
AUTHORIZED SIGNATURE (CONTRACTOR)
INCREASE CONTRACT AMOUNT BY:
$2,648.00
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted. All
work to be performed under same terms and conditions as
specified in original contract unless otherwise stipulated.
DATE OF ACCEPTANCE
SIGNATURE
(OWNER)
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
7'O:
KINSMAN CONSTRUCTION, INC
Derrick Anderson
PPC
4499 Ruffin Road, Suite 250
San Diego CA 92123
Change Order Request #
041
PHONE
858-634-8180
DATE:
12/07/16
JOB NAME:
National City Police Department
LOCATION:
1200 National City Blod
JOB NUMBER:
S5-029
FAX
858-634-8184
CONTRACT NUMBER:
Change Order Request #041
Item No. Description Amount
1. Backfill open trenches and exposed areas for landscape work. $3,404.00
OH&P $170.00
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at THIS price
$3,574.00
DATE
12/07/16
BASE CONTRACT AMOUNT:
(original contract amount)
$0.00
AUTHORIZED SIGNATURE (CONTRACTOR)
INCREASE CONTRACT AMOUNT BY:
$3,574.00
ACCEPTED - The above prices and specifications of the
Change Order are satisfactory and are hereby accepted. All
work to be performed under same terms and conditions as
specified in original contract unless otherwise stipulated.
DATE OF ACCEPTANCE
SIGNATURE
(OWNER)
Corporate Office: 6711 Nancy Ridge Dr., San Diego, CA 92121 (858)875-2950
CONTRACTORS LICENSE: CA #955119
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
KINSMAN CONSTRUCTION
Change Order #17
Police Department Building Improvements Project
Judy Hernandez (Engineering/PW) Forwarded
Copy of Change Order to Kinsman Construction