HomeMy WebLinkAbout2017 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #13 through #18CALIFORNIA .-*+-
1ON Car
anG
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 13
January 16, 2017
Reason/Purpose for this Change Order:
Vehicles continued to block the driveway at the Bellus Acadamy on Plaza Blvd. To deter drivers from blocking the
driveway the "Keep Clear" striping needed to be refreshed and additional signs and LED lights needed to be
added. Under direction of the Engineer the Contractor proceeded with refreshing the "Keep Clear" and adding
additonal signs and lighting.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with refreshing the "Keep Clear" striping and
placing additonal signs and LED lights infront of Bellus Academy driveway. The agreed upon price for all costs
associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Working days subtracted: 0
49,604.09
1,944,102.19
1,828.63
Percent change in Contract to date 2.71 %
1,945,930.82
Submitted by:
Pr ect Ma er
/t/II-
Date
Approved by:
Cit ngineer
Date
City Manager, required for Change Orders>$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and greed to by Dick Miller, inc.:
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
Te ep one (619 336-4380
1243 National City Boulevard, National City, CA 91950
1/
+ CALIFORNIA
NATIONAL Clry
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
DATE: October 28, 2016
CHANGE ORDER NO. 13
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Refresh "Keep Clear" infront of Bellus Academy
Installed signs and LED Flashers for Bullus Academy Driveway
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1)
Laborer
Hour
8.00
55.52
444.16
1) "Keep Driveway Clear" 48x48
2 LED Light
Unit
EA
EA
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
TOTAL LABOR:
Qty
2.00
1.00
Rate
72.00
105.71
$ 444.16
53.30
$ 88.83
Total
144.00
105.71
$ 249.71
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
19.98
$ 37.46
5;
Unit
Qty
Rate
Total
1)
Crew and Utility Truck
Hour
4.00
28.17
112.68
$ 112.68
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 16.90
$ 129.58
SUBCONTRACTOR.
Unit
Qty
Rate
Total
1)
Statewide- Refreshed Keep Clear
LS
1.00
750.00
750.00
$ 750.00
Sub -total Subcontractor:
Prime Contractor Markup (5%):
TOTAL SUBCONTRACTOR:
BOND AND INSURANCE (1%):
$ 37.50
$ 787.50
$ 18.11
GRAND TOTAL:
$1,828.63
Traffic Supply Inc
390 Pauma Place
Escondido, CA 92029
Voice: 760-884-3735
Fax: 760-737-0450
Bill To:
DMI GENERAL ENGINEERING CONTRACTOR
930 BOARDWALK
SUITE H
SAN MARCOS, CA 92078
INVOICE
Invoice Number: 12147
Invoice Date: Oct 28, 2016
Page: 1
.. ........... ..
Ship to:
JOB #16007
NATIONAL CITY
Customer ID
Customer PO ;=
Payment Terms
DMI
JOB #16007
Net 30 Days
Sales Rep ID
Shipping Method
Ship Date
Due Date
WILL CALL
10/28/16
11/27/16
Quanta
Item
Description
Unit Price
Amount
r 32.00
hr
1.00
COROPLAST-WHITE
BAR-212 LED B
2 EACH ( KEEP DRIVEWAY CLEAR)
48X48 BLACK ON WHITE NON
REFLECTIVE COROPLAST SIGN
MATERIAL
EMPCO-LITE 212-3S SOLAR ASSIST
TYPE "B" LIGHT
ORDER PLACED BY CHRIS DYDZYK
LED
4.50
105.71
,,,
144.00
105.71
IRF:C1 T1T ':
I
` NOV v 1 Zv,E,
BY'
- rza., .4'.
;heck/Credit Memo
Subtotal L e"' re-/
7;ri
249.71
::
Sales Tax
19.98
Total Invoice Amount
269.69
No:
Payment/Credit Applied
TOTAL
269.69
Please direct billing inquiries to: sherry@TrafficSupplyInc.com
CALIFORNIA -4,
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 14
January 17, 2017
Reason/Purpose for this Change Order:
At the NE corner of Palm Ave and Plaza Blvd the type B-1 curb inlet could not be installed because of an
unforeseen wall footing. Under direction of the Engineer the Contractor proceeded under time and materials to
install a Type A curb inlet.
The City of National City and Contractor agree to the following change to the original Contract.
The City and the Contractor agree that the Contractor shall proceed with installing a Type A curb inlet at the NE
corner of Palm Avenue and Plaza Blvd. The agreed upon price for all costs associated with this work is as stated
on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount $
Working days added: 0
Working days subtracted: 0
51,432.72
1,945,930.82
2,291.91
Percent change in Contract to date 2.84%
1,948,222.73
Submitted by:
/1q-
Date
roved by:
ineer / Date Cit Manager, required for change orders 424,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
jAccpted and agreed to by Dick Miller, Inc.:
2/2-011
!Name. 7' ' `� Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
Telephone (619) 336-4380
1243 National City Boulevard, National City, CA 91950
-- CALIFORNIA
NATIONAL CI,r
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification # 16-01
DATE: September 21, 2016
CHANGE ORDER NO. 14
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Additional cost to change Type B-1 Inlet to Type A
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1)
Foreman
Hour
2.00
80.20
160.40
2)
Operator
Hour
4.00
77.60
310.40
Sub -Total Labor:
Labor Markup (20%):
TOTAL LABOR:
$ 470.80
$ 94.16
MATERIALS
Unit
Qty
Rate
Total
1)
N/A
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
Unit
Qty
Rate
Total
1)
Komatsu 138 Excavator
Hour
4.00
137.00
548.00
2)
Crew and utility truck
Hour
2.00
50.00
100.00
$ 648.00
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
$ 97.20
$
745.20
SUBCONTRACTO'
1)
Additional cost to form Type A
Inlet
Unit
LS
Qty
1.00
Rate
935.00
Total
935.00
$ 935.00
Sub -total Subcontractor:
Prime Contractor Markup (5%):
TOTAL SUBCONTRACTOR:
BOND AND INSURANCE (1%):
$ 46.75
$ 981.75
$ 22.92
GRAND TOTAL:
$2,291.91
$ -
h I E.c_c �S.e._: 5 (.4�t .. h 5r4t-b-L....
Solid Structures, Inc.
P.O. Box 848 La Mesa, CA 91944
Phone: (619) 464 5210 Fax: (619) 464 5212
License # A-758791
jz .,r1�� 1 1 r
— `j c-0,-..ort,
BILL TO
DATE
INVOICE #
Dick Miller, Inc.
930 Boardwalk St. Suite H
San Marcos, CA 92078
7/31/2016
54533
P.O. NO.
TERMS
PROJECT
16-112 Plaza Blvd Widening
QUANTITY
DESCRIPTION
RATE
AMOUNT
1
1
1
4
Plaza
Item 49) Curb Inlet Type
Item 50) Curb Inlet Type
Additional Cost to Construct
Curb Inlet to a Type A Curb
Labor $520.00
Equipment $112.68
Materials $233.80
Four Yards of Concrete Provided!
Purchase Order for the Concrete
Superior Ready Mix Invoice
Dick Miller Bill Payment Form
Blvd Dick Miller Job #
B -1 L = 16'
B - 1 L = 21'
16' B - 1 ;.,,�, :2..
Inlet
Requested 5/24/16 `
Attached
Attached
Attached
1 RECEIV
1 AUG 0 2 2016
= '• '
5,100.00
5,800.00
935.00
125.17
5,100.00
5,800.00
935.00
500.68
fie.: J9.434t,. W , Cr. "to crone.
Total $12,335.68
,r. CALIFORNIA .-kg-
NATIONAL CITY
anti scoRpoRATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 15
January 17, 2017
Reason/Purpose for this Change Order:
Additional grading and repair was needed around the caltrans conduit between stations 58+42 and 59+32.
Under direction of the Engineer the Contractor proceeded under time and materials to grade around the caltrans
conduit and to repair any damaged sections of the conduit.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with grading around the caltrans conduit and
to repair any damaged sections of the conduit. The agreed upon price for all costs associated with this work is
as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
53,724.63
1,948,222.73
Amount of this change order 1,930.56
New contract amount
$ 1,950,153.29
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 2.94%
Submitted by:
P.%lect Manar Date
Approved by:
r/-V/
City_ n ineer Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
21Zeit
me: v Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
\ / / /r
CALIFORNIA
NATIONAL e CRT
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
CHANGE ORDER NO. 15
DATE: October 10, 2016
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Time for repairing and digging around Caltrans conduit for Bus Pad
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
LABOR
1)
Foreman
Unit
Hour
Qty
4.00
Wage
80.20
Total
320.80
2)
3)
Operator
Laborer
Hour
Hour
4.00
4.00
77.32
55.52
309.28
222.08
Unit
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
TOTAL LABOR:
Qty
Rate
$ 852.16
$ 102.26
$ 170.43
Total
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
1) Hitachi 135-UR Excavator
Unit
Hour
Qty
4.00
Rate
99.00
Total
396.00
2) Super 10 Wheel Dump Truck
Hour
4.00
72.00
288.00
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
BOND AND INSURANCE (1%):
$ 684.00
$ 102.60
$ 19.11
GRAND TOTAL:
$1,930.56
•. CALIFORNIA --
NATIONAL CITV
MCOR OR ATE
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 16
January 17, 2017
Reason/Purpose for this Change Order:
A second layer of geo-grid for the bus pad at station 58+42 had to be placed to obtain the required compaction.
Under direction of the Engineer the Contractor proceeded under time and materials to place the 2nd layer of geo-
grid for the bus pad.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with placing a 2nd layer of geo-grid for the
bus pad at station 58+42. The agreed upon price for all costs associated with this work is as stated on this
Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
55,655.19
1,950,153.29
Amount of this change order 649.24
New contract amount $ 1,950,802.53
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 2.97%
Submitted by: /
At"
Date
Approved by:
-r'41//
City n ineer Date City Manager, requiredfor Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there wit be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
agreed to by Dick Miller, Inc..
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
1/.
+'-- CALIFORNIA
N� . ����. �_�.'I.O NAL CHIT
18 e Y
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification #16-01
DATE: October 11, 2016
CHANGE ORDER NO. 16
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: 960 SF of Geo-Grid for 2nd lift for Bus Pad at station 58+42
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1)
Foreman
Hour
1.00
80.20
80.20
2)
Laborer
Hour
0.50
55.52
27.76
1)
960 SF of Triax Geo-grid
Unit
LS
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
TOTAL LABOR:
Qty
1.00
Rate
360.00
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
$ 107.96
12.96
$ 21.59
$ 142.51
Total
360.00
$ 360.00
28.80
54.00
TOTAL MATERIALS:
$ 442.80
Unit
Qty
Rate
Total
1)
Chevy Truck 3500 with Tools
Hour
1.00
50.00
50.00
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
BOND AND INSURANCE (1%):
$ 50.00
$ 7.50
57.50
6.43
GRAND TOTAL:
$ 649.24
SUPPLY
4.0b1.5.1RUCTION a INDUSTRIAL
WHITE CAP
HD Supply Construction Supply, Ltd.
501 W. Church Street, Orlando, FL 32805-2247
!ENROLLMENT TOKEN:1 VKX DML HDG
SOLD TO: 13028000
DICK MILLER INC
930 BOARDWALK STE H
SAN MARCOS CA 92078-2634
BRANCH ADDRESS
003 - SAN DIEGO
(858) 560-9933
7560 CONVOY COURT
SAN DIEGO CA 92111
TERRITORY:
SHIP TO: 10001067010
INVOICI
INVOICE NUMBER
50005117597
INVOICE DATE
10/05/2016
CUSTOMER PO NUMBER
16007
PLEASE REMIT PAYMENT TO:
HDS WHITE CAP CONST SUPPLY
P.O. Box 6040
CYPRESS, CA 90630-0040
PLAZA BLVD "N" AVE TO 1 805-16007
PLAZA BLVD WIDENING "N" AVE TO 1805
NATIONAL CITY CA 91950
ORDER DATE
ORDER NO.
ORDERED BY
ACCOUNT MANAGER
TAKEN BY
10/05/2016
221887994/
JASON CRILLY
THOMSON, KEVIN
THOMSON, KEVIN
BRANCH
ACCT JOB NO.
TERMS
SHIP VIA I ROUTING
CUSTOMER JOB NO.
003
10001067010
NET 30 DAYS
0. WILL CALL
16007
LINE
PART NUMBER
- DESCRIPTION
QTYORD
UNIT PRICE
QTYBKO
OTYSHP
EXTENDED
PRICE
TAX
AMT
0
1
HDRDESC
104TX5475
DELIVERY TAG#: 5854408
13.1'X246' TENSAR TRIAX TX5 475
1
1
0
1,075.0000 RL
0
0
1
1
0.00
1,075.00
86.0
RECET\TED
OCT 1 0 2016
BY:_�
a t teoo?
st Ss -MD
We Want To Hear From YOU!
Your satin' " ' ' . ; would like to know how to serve you better. Please click the Zink below
�, LANAIito your browser, and take a quick 5 minute survey.
)://www.WhiteCap.com/re-survey
14 44" t...Nora)
ter--T. C R anti
.1 LAW eit eedback and we look forward to hearing from you!
msP Wks S 0.42.tRc
'MIS
aN 11Ar. ,
I
I
For questions regarding this invoice please call 1-800-WHITECAP
(1-800-944-8322).
NO REFUNDS OR EXCHANGES ON NON STOCK MERCHANDISE
Visit http://whitecap.com/misc/terms and conditions,pdf to view complete terms and
conditions
ECEIVED BY: CRILLY, JASON
SIGNATURE COPY ON FILE
TOTAL GROSS
TOTAL TAX
TOTAL SHIPPING
AND HANDLING
TOTAL INVOICE
1,075.0(
86.0(
0,0(
1,161.0(
Please verify that the remit to address you are using agrees to the address shown at the top of this Invoice.
Page 1 of '
+0-. CALIFORNIA -K+-
Amount of this change order
New contract amount
NATIoNAL Clry
` G � -
INCORPORATE7>
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
CHANGE ORDER NO. 17
January 17, 2017
Reason/Purpose for this Change Order:
Due to utility conflicts small sections of asphalt had to be paved seperately on the South side of Plaza blvd from
Palm Avenue to the 1-805. Under direction of the Engineer the Contractor proceeded under time and materials
pave the missing sections of asphalt.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with paving the missing sections of asphalt
on the South side of Plaza blvd from Palm Avenue to the 1-805. The agreed upon price for all costs associated
with this work is as stated on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders 56,304.43
Subtotal 1,950,802.53
1,173.17
$ 1,951,975.70
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 3.03%
Submitted by:
g/i /G
Date
Approved b
Cit n�ineer
3a ,
Date
City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. At of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
3/I ‘t
Name: ate
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevar , Nationa City, CA 91950 TelenFione (619) 336 4380
0— CALIFORNIA -.‹*
NATI NAL My
INCORPORATED ' JJJI
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification # 16-01
DATE: October 13, 2016
CHANGE ORDER NO. 17
WORK PERFORMED BY: Dick Miller, Inc.
DESCRIPTION OF WORK: Additional cost for paving small pieces from Palm to I-805
(South Side)
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1)
Foreman
Hour
2.00
80.20
160.40
2)
3)
Operator
Laborer
Hour
Hour
2.00
3.00
77.23
55.52
154.46
166.56
4)
Laborer
Hour
2.00
55.52
111.04
Unit
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
Qty
$ 592.46
71.10
$ 118.49
TOTAL LABOR:
Rate
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%):
TOTAL MATERIALS:
Total
Unit
Qty
Rate
Total
1)
Chevy Truck 3500 with Tools
Hour
2.00
50.00
100.00
2)
Bobcat Skidsteer
Hour
2.00
43.00
86.00
3)
Super 10 Wheel Dump Truck
Hour
2.00
72.00
Sub -Total Equipment:
Equipment Markup (15%):
144.00
$ 330.00
$ 49.50
TOTAL EQUIPMENT:
BOND AND INSURANCE (1%):
$ 379.50
$ 11.62
GRAND TOTAL:
$1,173.17
+}- CALIFORNIA -+-
NATIONAL C
__ INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification No. 16-01
Contractor: Dick Miller, Inc.
Reason/Purpose for this Change Order:
CHANGE ORDER NO. 18
January 17, 2017
Pulled wire and spliced for the two lighted entry signs at the Stardust Inn. Under direction of the Engineer the
Contractor proceeded under time and materials to pull wire and splice for the two lighted entry signs at the
Stardust Inn.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with pulling wire and splicing for the two
lighted entry signs at the Stardust Inn. The agreed upon price for all costs associated with this work is as stated
on this Change Order. See Attachment "A" for cost breakdown.
Original Contract Amount $ 1,894,498.10
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
57,477.60
1,951,975.70
1,317.99
New contract amount $
Working days added: 0
Submitted by:
ect Man
Approved by:
ineer
Working days subtracted: 0 Percent change in Contract to date 3.10%
Date
1,953,293.69
24/.; ?
Date 'City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by Dick Miller, Inc.:
'3hb,
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (6-0) 336-4380
I//
CALIFORNIA+
-
NATIONAL Cfry
INCORPORATED
PLAZA BLVD WIDENING "N" AVENUE TO 1-805
Specification # 16-01
DATE: 10/18/16 and 10/19/16
CHANGE ORDER NO. 18
WORK PERFORMED BY: Perry Electric
DESCRIPTION OF WORK: Pull wire and splice for two entry signs at Stardust Inn
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Wage
Total
1)
UT TECH 2 - Carlos Balderas
Hour
7.00
37.50
262.50
2)
UT TECH 3 - Arturo Cardenas
Hour
7.00
30.99
216.93
3)
UT TECH 1 - Lucio Rodriguez
Hour
2.00
30.99
61.98
Sub -Total Labor:
Labor Burden (12%):
Labor Markup (20%):
TOTAL LABOR:
$ 541.41
64.97
$ 108.28
14
6
1) 70' 1" Sch 40 Pipe
1)
240' #10 Wire
Unit
Qty
Rate
Total
LS
LS
1.00
1.00
34.76
44.64
34.76
44.64
Sub -Total Materials:
Sales Tax (8%):
Materials Markup (15%): $ 11.91
TOTAL MATERIALS: _
$ 79.40
$ 6.35
Unit
Qty
Rate
Total
1)
Utility Truck 12-20
Hour
7.00
28.17
197.19
2)
3)
Utility Truck 12-20
Compressor
Hour
Hour
2.00
7.00
28.17
17.33
56.34
121.31
Sub -Total Equipment:
Equipment Markup (15%):
TOTAL EQUIPMENT:
PRIME CONTRACTOR MARKUP (5%)
BOND AND INSURANCE (1%):
$ 374.84
$ 56.23
$ 431.07
$ 62.17
$ 12.43
GRAND TOTAL:
$1,317.99
€ED
CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA
1011 BAY BLVD.
CHULA VISTA, CA 91911
T:619 427-2370 F:619 427-5416
SOLO TO: ***US -MAIL***
T 6 M ELEC/DBA PERRY
PO BOX 710130
SANTEE, CA 92071
INVOICE NO.
1069-716971
INVOICE DATE
09/13/16
PLEASE SHOW INVOICE NO. AND REMIT TO:
P.O. BOX 509079
SAN DIEGO, CA 92150
T:858 451-7090 F:858 451-7094
SHIP TO: T 6 M ELEC/DBA PERRY
1011 BAY BLVD.
CHULA VISTA, CA 91911
ACCOUNT NO. KY-98322
JOB #718 PLAZA BLVD
JOS NAME ANDADDRESS
PT.n7.A BLVD
CUSTOMERORDERI
718-971
SALESPERSON
1448 RJ
SHIPPING INFORMATION
PREPAID
SHIP VIA
WILL CALL
SHIP DATE
09/12/16
QUANTITY
ORDERED PRODUCT CODE
DESCRIPTION
QUANTITY
° SHIPPED
PRICE DISC.
EXTENSION
T %2500 WIRE THW1OBLACKSTR
T / 2500 WIRE THWIOWHITESTR
T 1 ROPE 1/2X3000PULLTAPE
T 1 IDEAL31385
WIRE
WIRE
3/4X3000 2500LB MULE TAPE
5GAL PULLING LURE
At--n L\LA
z-0-cki,
2500
2500
1
1
186.00 M
186.00 M
184.60 E
68.61 E
465.00
465.00
184.60
68.61
TITLE AND RISK OF LOSS OR DAMAGE TO MERCHANDISE
?ASSES AT POINT OF SHIPMENT. CLAIMS FOR SHORT OR
DAMAGED MERCHANDISE SHOULD BE MADE TO ,AuRIER.
.RCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT BE
ACCEPTED. A RESTOCKING CHARGE WILL BE MADE ON
,ETURNED GOODS UNLESS DEFECTIVE OR THRU ERROR ON OUR
PART.
A SERVICE CHARGE OF 1.5% PER MONTH, BUT NOT TO EX(.F.e.tJ
THE HIGHEST AMOUNT LAWFULLY ALLOWED BY CONTRACT IN
THIS STATE, WILL BE MADE ON ALL PAST DUE ACCOUNTS.
PHIS SALE IS SUBJECT TO OUR TERMS LOCATED AT
SALES.OUR-TERMS.COM, WHICH WE MAY CHANGE FROM TIME
PO TIME WITHOUT PRIOR NOTICE.
CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS
CODE IS USED ON OUR INVOICES.
B - BACK ORDERED. WILL SHIP AS 500N AS RECEIVED UNLESS
INSTRUCTED TO CANCEL,
C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LOCALLY.
MERCHANDISE
SALESTAX 8.000
SHIPPING CHARGE
1183.2
94.6
.0�
NET PAYMENT IS DUE BY THE 15TH OF
THE MONTH FOLLOWING PURCHASE
TOTAL DUE
1277.8'
SOLD TO:
CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA
1011 BAY BLVD.
CHULA VISTA, CA 91911
T:619 427-2370 F:619 427-5416
T 6 M ELEC/DBA PERRY
JOB #696
PO BOX 710130
SANTEE, CA 92071
***DUPLICATE***
***US -MAIL***
SHIP TO:
ACCOUNT NO. KY-97994
JOB #696 PLAZA BLVD
JOB NAME AND ADDRESS
SALESPERSON
1448 RJ
QUANTITY
GUMMY
ORDERED PRODUCT CODE DESCRIPTION ° SNIPPED
PRICE DISC
ISNIPPING INFORMATION
fl PREPAID
INVOICE NO. 1 INVOICE DATE
1069-719071
10/21/16
PLEASE SHOW INVOICE NO. AND REMIT TO:
P.O. BOX 509079
SAN DIEGO, CA 92150
T:85B 451-7090 F:858 451-7094
T 6 M ELEC/DBA PERRY
1011 BAY BLVD.
CHULA VISTA, CA 91911
CUSTOMER ORDER NO.
696-071
SHIP VIA
WILL CALL
1 SHIP DATE
10/19/16
100 PVC SCH40-1 CONDUIT
10 DOT LHDS 5-LB DUCT SEAL
20 PVC COUP1 PVC COUPLING
1 PVC GALLONGLUE CEMENT
20 PVC SCH4OELL1X90 900 PVC ELL
3K-A)(
TITIL AND RISK OS LOSS OR DAMAGE TO MERCHANDISE PASSES AT IOSMT OF
SHIPMENT. CUIINS PoR SHORT OR DAMAGED boarw, asISE Stl002D HE maDE
TO CARRIER.
MERCHANDISE RETURNED WITHOUT OUR CONSENTS WILL NOT BE ACCEPTED. A
RESTOCKING CHARGE WILL BE MADE ON RETURNED 0000s UNLESS DEFECTIVE
OA TERU ERROR ON 00A PART.
A SERVICE OHAR(E or 1.51 PER MONTH, NOT NOT TO EXCEED THE BIGGEST
AMOUNT LAWFULLY Al ltS.1U BI CONTRACT TN THIS STAR, WILL BE MADE ON
ALL PAST DUE ACCOUNTS.
THIS SALE IS SDBJLCT TO OUR TERMS LOCATED AT SAILS.OUR-TERMS. CUM.
WHICH WE MAY CHANGE PRO'S TIME TO TINE WITHOUT PRIOR NOTICE.
C
EXTENSION CO
100 41.54 C
41.54
10 8.21 E 82.10
0 29.44 C 0.00
1 32.20 E 32.20
20 94.71 C 18.94
,o,Ln I , Lc
LA 3
CODE: TO ADVISE IOU PROPTLY CONCERNING YOUR OLDER, THIS CODE IS USED ON OUR
zavozc5s.
H - HALE ORDERED. WILL SEIP AS 500N A5 RECEIYED UNILSS IRSTRDCTPD TO CANCEL.
C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE 7^,bILY.
MERCHANDISE
SALESTAX 8.000
SHIPPING CHARGE
174.78
13.98
.00
NET PAYMENT IS DUE BY THE 15TH OF
THE MONTH FOLLOWING PURCHASE
TOTAL DUE
188.76
_°��1111A1, CI j�
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
DICK MILLER, INC.
Change Order #13 through #18
Plaza Blvd. Widening — "N" Avenue to 1-805
Judy Hernandez (Engineering/Public Works) Forwarded
Copy of Change Orders to Dick Miller, Inc.