Loading...
HomeMy WebLinkAbout2017 CON CS Legacy Construction - Paradise Creek Educational Park - Change Order #1 through #4+-» CALIFORNIA -# , TI.ON L CITy INCO$PORAT:D Paradise Creek Education Park CIP NO. 16-08 Contractor: C.S.Legacy CHANGE ORDER NO. 1 February 23, 2017 Reason/Purpose for this Change Order: The City requested proposals for additional Landscaping, Salvage of Overlook. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described in PCO 1.1, attached. Original Contract Amount $ 612,243.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 612,243.00 2,838.14 Percent change in Contract to date 0.46% 615,081.14 Su itt by: j Date Approved by: City ngineer .2/2 4-2 Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acce • ted aif a •rered o b C.S. Le • ac Name: Date Note to Co ractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you ay proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL _ CITY INCORPORATED Paradise Creek Education Park CIP NO. 16-08 DATE: February 23, 2017 CHANGE ORDER NO. 1 WORK PERFORMED BY: C.S. Legacy DESCRIPTION OF WORK: Add landscaping, salvage of overlook ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) Additional Landscaping, Salvage of Overlook 2,838.14 TOTAL: $ 2,838.14 BE a IS i• _•®S 1•r•111•111111111111111101 101111111111111111110111111111111111111 C.S. LEGACY CONS 1' f2 L. C: .n 1 O N. 1 ?- C. Extra Work Proposal PCO 1r1 Project: Paradise Creek Labor Name: Date of Work Date of proposal A.dditionai landscaping per revised plans /Salvage of Overlook/ Additinal signing striping Description Hours Rate Total 0 0 0 Superintendant 0 64.93 0 Foreman 2 64.93 129.86 Labor 16 64.93 1038.88 Operator 0 84.86 0 Mason 0 72.15 0 Subtotal Labor 1168.74 Equipment Type Description Hours Rate Total 0 0 0 0 0 0 Pickup 8 50 400 Minni Ex 8 50 400 0 0 0 0 Subtotal Equipment 800 Materials 1/27/2017 1168.74 800 Description Qty Unit Total 400 0 Signage/Striping/removals by city 1 0.00 0 0 Plants 1 400 400 0 0 Subtotal Materials 400 Rate Amount Total Markup Sub 0 Markup equip 0.15 800 $ 120.00 Markup Materials 0.15 400 $ 60.00 Markup Labor 0.2 1168.74 $ 233.75 Bond 0.02 $ 2,782.49 $ 55.65 SubtotalTotal Cost $ 2138114 Total Cost Agency Representative Date Contda $ 2,838.14 Representative Date 5 F. e E PLANT SCHEDULE 9�e 001.w;a .VE SE A s.1.mom. 'Ma ... SSE& 91X w'w6.0E61 w.M l ccryl+S= • AM M AMwa.rl..a Eorr+anVeve. 10 s4.0. ® N 11 A..Pr6MMa..1F..b 1 b.9 (1) nc, a 66o0.61006,064646666..a 6N1 AO.c, a A606666 a*.,6Mw00Y406 60 4O.0 3 ` �;�.w�,1M,WwM 601 EME9�a+ u6rmIC•1406 ramr B. SO .00601616460.06,6560. w Q. E0,9115PEw1,1x.AW;w u�€M • 5 0 a. . Ma • L "tom.. mi 91.59 ARM %oaRR.,599mar a,.,6«.. ▪ .rvn EOSEvs EWE _ O4r6146,, 0J0,66 ., f:SAL SRN: 10 KO. c .6. y 40 aW 6O.C. 6E 60.0 w1 . 50 RUC 30 601 S.L. 6F.1 5 00 SEED MIX CHART PLANTING NOTES TRANSITIONAL 5O01TI10 POE UVL AND SEED 0.61011 Mar MIX DR PL5 us/Ac. EFNMPU'. 07*104 OIASCW O[PO EE0 w5 10 DI MMORE 0.590U94TA 0.5OCI10 1190R0 *0 1.0 r5CECM0ETSM MED.. CAMERA POPPY 115 1.0 Y uW4iFRE1.6161 ERouwnW MR[KMstwa 2 1.0 519A PUgMA MARI EEOlt6RA% 75 3.0 TEA. 59 SEED MIX NOTES FLEXTERRA • ER0610N CC/MIMI. OMrMO. TWNM1n FALL wnu nrip=crneu�sie[ws in.µ vAL r [uiwArwv FMwwcr`wwEwW�! Aa�P.4!'Ew01.i uc wRu.e.w \ c;t,, ce __ d 1,m. AF • a9TO EETAworRCO..6intiOswANias TO .07 EroAMAWT ZEE. WCN6w5Y9.Or 1r0 NN MRS Ms EwrlEa Ore MESEEE. MDR. RWECT.09R1w.11ORSUM AMID 09004s•uM11W TNM1.0 LEFOR A MATE01,6 V.aW R., WEEw6 M.NW'ITA 41.01: i4C4RE 1NEEEA.MNO FF AW At OWIA60i000.4 .66010Awe MO CE 01006 M ANI 14• 016 rvEwEK[ ETK MEMO, DUMMY RSCRMEMS EOM. wuenswo0. �9M1E5E D,..wcE MOM.w9 RE A11E.010OFTK.403.06660i birrm.1061CuwM s` SKEREMOD PI sm. REDDA EMIUMTIMS.H Mc AraRVE O Ma Ea,�nOpEMMOOywAEE_6EVAM1 6u TO c OrDORRA W. • µEA10AMIST E . OP nw1 PRE.. w NECE;.n Sr E EMT. LNEROMOU vils9SAAw. lx1EIMNROOK MOWED i OM`Rm,TM 0.401s MPPEUNTEIM RLIMI- 64,066reb6mE 56 : MRO. W•NMA..E 4�E,MTEOW NW RR,A1. M009CAEA1.11IELF EMTM COMMONS MM*All .54•1411. IF OEDEMAS. Es, wRECT 1Nc DERNSEMMASE.N MEEMOIa TO rRECEDO WCON.419 001. WNIARWT P60AAE6N 616.60E COEETMbX TEAM REPS. MS.1. DOM BALLS WM. SOTS MtOW ORAOE. APPLIMME If.wOEROW6I. AECEWRw 10 IMP SExAMTMO AEM Or EOP mmuncras.- orrooPPMEEER R.DomEETIM E4, EORMIO.W/OR 1 -4.1519.11011tS Er MEWS 5. AM Mo WORM' ERN wwPOCMEMM RJEDDREM LMOSE.IWF EEASPE coNTRAATTATAAA Rms. Au. RSM M, mug MrEs.r0ER.4E Wm4.. .M.55.r. NAM R , ERRs'06MrrTF Eu.6VE 51. 1 M..w 1 E ENRt ODMES1 iEi A«noR NEAC• E « osiR.9101 `.:w.ve"E w'i. E9wabrm5 CONSTRUCTION CHANGE SCRIP ARPMDA£O DATE * 0E� SCA,d. MEW RNww MP Kimley»)Horn ilsmis num PMSNarI 1 smsrM-M.DIRK^ 1.4PETIONAL T PAikOTIE EDER EOl1CA110NM. PAIR IRRAATTEAns uND.AEE SDNEOL E a ROTES CRY OF NATIONAL CITY 11974. 150 R/w TAU FE r6a P [DECK UMW, WY i61E�s 'SPED. PA0Aa16 CAECA EWCAMwAL .wr c4oz1 wti TO 2 -MO sxA Ax6 •I19MMO PR1M2,129• C '; i Tot WOK TO/ F66L I-92-7t1-,RM memo 10TH STREET •2 MOOR arc mE At3.396.19 9.2N.41xn 6 1..2RNu4o[.0 I,6 3.691.26 [ 6.264N1.47 .2 MOM MOOG ZONE. 9.11 MOMS AMINIT PALM a CONSTRUCTION CHANGE W. 02100R110N APPROVED DATE A w9 0ECR 2LA. Il10 •ARa RM H 421140 PAM. SPA<L. ,00 11/4/2016 LEGEND 0 D SAYOT ERA.. 1.2012 Rol <OLRE 4 Pl2 41 PAR0A0R1, EWAPO 25E LMIE. A2 coNse 1 661400E *R[119CS C.RO 0 GlOIA0. *MEAAR% OW,44 w AND 4w.w COYLCI Mw wE Px�P@20 efrAmo41SEX).l ROKAC CCT*2 111AM E0 29 0110 URU,6AA,LPoKCOFIFF01 DEMOLITION NOTES Qi P6ott1T w 7Aa. O1 RELCCAI[. SCE IWR2Kl4RT PLANS FOR RIR1OCA60x. IF DOT WO. CN MS%CU S $,A1KE1T Pq CfIAR A W , OE. _ - Uumr. ..ry Y2u.R nT6rt9—j'Aik - ¢[,uuo 2Krt x2uoxE, ott. n wmo e M1otl.u. 2E2 1.4400100E PEARS 201 LOCATO1. GENERAL DEMOLITION NOTES mTr 16 U 120900 A440 M0920112MAR1CN EOCAMM OF ALL mLs wTom Tr6 mo,EC2 uEA aEAT RAY C.ILICT wn PROPOOLO 04101ROCIFOM. V[f1{Y TWAT ANr MUIR, SOON 10 OE to CONCOCTELOCATED BE011.2 W[aATEE, HAW MR M`O. a Mr FM 1.2/4001 RtwM. OSOTY <010FCTS PRIOR Io x7. START OF MT aW'URON &WV 2. 1 FEE 9.01110 020 DT iM1. PxEYER ATILMk IT iEMin9:c EA CW 6cu69, O 16.0.10R12 ARE WOW FOR WEI. i Wen., u SPECIAL PARAMSC WELK EMNAMWI'F21 '9.1 DCRCPOTCC AA9 w T.A WZCO AA NCO 10 O+CIE. 1. SEE 021 .AM6 PATE. row REwv21. AE ouIRR45, MOOR AONSRAEATS a v9cADor . AILO Ranc2A2EA'T, i n1iA MCNE Pt/Ms Itu K:41AMU AEEAS TOOT wJTE:¢O a� AM: j.',CALL w MT Kimley>»Horn NAf70NALCITIA rAR00se CST. EL]4CATE94Y. PAW.. IlleFONEMENTS DOOM EDC. PLMI CITY OF NATIONAL CRY 104.74- on, FINA'- IMPROVEMENT PLANS - CITY OF NATIONAL CITY - PARADISE CREEK EDUCATIONAL PARK IMPROVEMENTS 8 d 8 A s R } 5 1 z a J E F � C 7 B N a 5 1 MATCHLINE - SEE BELOW RIGHT ,40 MATCHLINE - SEE BELOW RIGHT MATCHLINE - SEE ABOVE LEFT 4TO.J.0wxLI 4-22 *A. SMAO LT A/a \ 4 3.00. 2072. LT .nu. =AO LTLT' TAa2A—� {- I 1.2011 O.1S' ITT 1917-I TROT ANAL w, n—^ 1' 1 me vow O/RO 40 m oweA00L .0 sXArEOGOMlO\ IMO ars ♦SS, I O aT 40.1r. woe or *'sAEaA au CAW.. MOM CONSTRUCTION CHANGE OE0C0I0004 I APPAOIOD DATE O1MAOC AXEA HLDCA1al. NER NA`OICAP PAW G DPACE. W 0E2 IIEMAa6 /5/ LEGEND FAA. O.* Ay/ALT F. P220. CaA;Nky. AX0 SAY notorm moor* OCAaEIC ISAOVAL OAC1U0C5 CLAD a: WTTCA. AUS 0A no m o002*010 05.1 +4 W MOW wTA csDYu .NXowrXlsl CONAILEXL TvIAL cor.,Ancc aA lArkerAL Daum mfi:nE DEMOLITION NOTES pi PA011t, in PLACE. O ADA6110 n.s ED ;AADn. O M OrrE O PROLOG OOLE IIr 11X5r0CFIPLAG Aal MA N LOCACM IF 0 5AAX0:1 v[X LE'AA A ON vial 04. Q r6pO+aK VA4C XCWWr ,0 CMIEX Al IMS ANF NAALWK OAY. G 9psR O AcOPnisonAN IC PPE M* fadva: N[1 MIO GENERAL DEMOLITION NOTES I. .mows EAA'v PICALL WA* E. 1NE P70*01 Aw. M TA W CbK A111a0. [ 7nsonor1aC vrArT MAT APT DIUMS SNDAA TO OE OCATED Or 000111 IMAE Of[X AELOCATED AAp ME . L .FR copr. pA1ELY W.M EWAXEO or We KS.SXX1° 00 COWOCIS DIPOA TO slWl a An DCS ILA *IA. 2. A M11 AP E TO or roOFECTEOMWACE 5ANL & Mas Or mi-SLXVADa1 RAfl. sCE Lw>SCAM PROPOSED ON+AaaKATS AXL Wan FOP AMP.. PDXPDYs OM Y. S. SEC HAMMwX Dr. 1a< MLIa.ALS. AODUDWs. 410/00 00.02.NIS 6 A. ADO AEA. MMAOOKIITS a. YE LAXOSCAPE PLANS TOO LC0LIA0➢ ATd32 TO OE PAO'CO LD M. O. GY5WACItli Wlsl 0NME Ala 0ttLOCMD smVwi Alq v -73 0* ASrwr_ 0CW240 4 AEMO05 11u.1 L1A0[-A1rintor.0 OT PC Ott CAOWRA wY OEMs 01A2.1.� If PAAwrIF woo ao or . COMMCTCA X AEU 0 Kimley»>Horn pjAUONALCiZ PAMO6E C PEEN. EDUCATi0MAL PAWL 010.401.MON Fun CITY OF NATIONAL CITY ms. WA. rows .wucrm 0%DI4+20 Ann 1N74- DOD +— CALIFORNIA •+* TIONAL CITY L INCORPORATRD Paradise Creek Education Park CIP NO. 16-08 Contractor: C.S. Legacy CHANGE ORDER NO. 2 February 23, 2017 Reason/Purpose for this Change Order: The City requested proposals for additional Concrete Slab and DG. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described in PCO 2.1, attached. Original Contract Amount $ 612,243.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days addTh W9 k ng days subtracted: 0 2,838.14 615,081.14 16,872.52 Percent change in Contract to date 3.22% 631,953.66 S •mitt-. by: , Date ZIZ-til 7 P ec ' anager Approved by: Cityer Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by C.S. Legacy: Name: Date Note to Contractor: If you d of gr with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed and prote . You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, ntractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 + CALIFORNIA NATIONAL CIS' �'y e e INCORPORATED JJl Paradise Creek Education Park CHANGE ORDER NO. 2 CIP NO. 16-08 DATE: February 23, 2017 WORK PERFORMED BY: C.S. Legacy DESCRIPTION OF WORK: DG, Slab ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) Concrete Slab, Additional DG 16,872.52 TOTAL: $ 16,872.52 Extra Work Pro Project. Labor Name: Subtotal Labor Equipment C.S.inmaimmisionam LEGACY CCs, NSTiGc, t t<y;v posal PCO 2r1 Date of Work Paradise Creek Date of proposal Slab per revised plan for new shed/grading Additional DG per revised plan Description Hours Rate Total 0 0 Su erintendant 0 0 Foreman 64.93 0 Labor 32 64.93 0 Operator 64.93 16 84.86 Mason 32 72.15 2077.76 1357.76 2308.8 5744.32 Tx e Description Hours Rate Total concrete pump 4 125 Mini Excavator 00 8 75 600 Pickuo 16 Subtotal Equipment Materials Roller Skiploader 16 16 40 50 75 640 800 1200 3740 2/9/2017 5744.32 3740 Description Q Qty Unit Total 4650 Concrete/rebar 7 150 1050 DG 80 45.00 3600 0 0 0 0 Subtotal Materials 4650 Rate Amount Total Markup Sub 0 Markup equip 0.15 3740 $ 561.00 Markup Materials 0.15 4650 $ 6 7.50 Markup Labor 0.2 5744.32 1, 08.86 Bond 0.02 $ 16,541.68 430.83 (tit SubtotalTotal Cost $ 16,872.52 $ 16,872.52 Agency Representative Date Contractors 7epresentative Date l f ,7 Paradise Creek Education Park CHANGE ORDER NO. 3 CIP NO. 16-08 Contractor: C.S.Legacy Reason/Purpose for this Change Order. The City requested proposals for additional shed, trex deck, fencing, gate, railings, stairs. February 23, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described in PCO 3, attached. Original Contract Amount $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days atJded: 0 /1Working days subtracted: 0 612,243.00 19,710.66 631,953.66 30,739.84 Percent change in Contract to date 8.24% 662,693.50 itt b. . 2,12.4-( Date 17 roject Manager Approved by: .2. ..... . CitCitneer - /'- Date 3lq ln, City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and a. reed to by C.S. Legacy: Name: � Date` Note to Contractor ou .. t agree with this Change Order you may be directed to proceed with this work under the terms of the ' ntract and you may profed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. y� Originals: City l.Ierk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 +r.* CALIFORNIA . (MA L Cir • y INCORPORATED Paradise Creek Education Park CIP NO. 16-08 DATE: February 23, 2017 CHANGE ORDER NO. 3 WORK PERFORMED BY: C.S. Legacy DESCRIPTION OF WORK: Fencing, gates, railings, shed, trex ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) Fencing, gate, railing, shed, trex, 30,739.84 TOTAL: $ 30,739.84 ta pa MIMIC 111111111111111111111111111111111111 C.S. LEGACY G Gj N S 'i" YL L I C 'CSC, Extra Work Proposal PCO 3 Date of Work Project: Paradise Creek Date of proposal Labor Name: Additional Fencing/Gate/Railing/Shed/Striping stairs/Trex per revised plans Description Hours Rate Total 0 0 0 Superintendant 0 64.93 0 Foreman 8 64.93 519.44 Labor 48 64.93 3116.64 Operator 0 84.86 0 Mason 0 72.15 0 Subtotal Labor 3636.08 tquipment Type Description Hours I Total 0 0 Pickup 0 40 0 0 0 Subtotal Equipment 0 Materials 12/19/2016 3636.08 0 Description Qty Unit Total 22412 Fencing/Gates/Rails 1 14412 14412 Additional Tex 1 2,500.00 2500 Additional stripng stairs 1 500 500 Additional Shed per attached 1 5000 5000 0 0 Subtotal Materials 22412 Rate Amount Total Markup Sub 0 Markup equip 0.15 0 $ - Markup Materials 0.15 22412 $ 3,361.80 Markup Labor 0.2 3636.08 $ 727.22 Bond 0.02 $ 30,137.10 $ 602.74 SubtotalTotal Cost $ 30,739.84 it A Total Cost $ / 30,739.84 Agency Representative Date Contractors Represent Dat aoov IArC�I jTyD Paradise Creek Education Park CIP NO. 16-08 Contractor: C.S.Legacy CHANGE ORDER NO. 4 February 23, 2017 Reason/Purpose for this Change Order: The City requested proposals for a construciton entrance to the park phase 2 site for sewer tank pump out. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described in PCO 6, attached. Original Contract Amount $ 612,243.00 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Working days subtracted: 0 50,450.50 662,693.50 3,518.64 Percent change in Contract to date 8.81 % 666,212.14 9ticmftiki Prole anager Date Z ZjZy0/7 Approved by: Cit nneer City Manager, required for Change Orders >$24,999 Date Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted a , • agreed to by C.S. Legacy: Name: =� Date Z " I Note to Contract .0 do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may pro *tau protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City 4lerk, Contractor cc: Engineering project file, Project Manager 1243 National CiBoulevard, National City, CA 91950 Telephone (619) 336-4380 l �-* CALIFORNIA NATIONAL Ca? INCORPORATED - JJJI Paradise Creek Education Park CIP NO. 16-08 DATE: February 23, 2017 WORK PERFORMED BY: C.S. Legacy DESCRIPTION OF WORK: construction entrance CHANGE ORDER NO. 4 ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) construciton entrance for pumpout 3,518.64 TOTAL: $ 3,518.64 al so mann naamaiimams nsimunnannal C.S. LEGACY cgNS"i'£t.Lic SloN, !" PCO 6 Date of Work Extra Work Proposal Date of proposal Paradise Creek Install temporary road for City maintenance personnel Protect: Labor Rate Total Description Hours Name: Subtotal Labor Eauip nsit Tvoe Dump truck Subtotal Equipment Materials Description Rock Superintendant Foreman Labor Operator Mason Description Skiploader F'icku _ Hours Qty Rate 8 8 259,72 519.44 678.88 1458.04 Total 0 75 600 40 320 0 0 920 Unit Total 1 600 600 Subtotal Materials 0 0 0 0 0 600 1458.04 920 600 Rate Markup Sub Markup equip Markup Materials Markup Labor Bond SubtotalTotal Cost Total Cost 0 0.15 0.15 0.2 0.02 Amount Total 920 600 14 8.04 $ 365 $ 3,5 8.+4 Agency Representative Date Contra $ 138.00 $ 90.00 291.61 $ 68.99 $ 3,518.64 sentative Date CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk CS LEGACY CONSTRUCTION Change Order #1 through #4 Paradise Creek Education Park Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Orders to CS Legacy Construction