Paradise Creek Education Park
CIP NO. 16-08
Contractor: C.S.Legacy
CHANGE ORDER NO. 1
February 23, 2017
Reason/Purpose for this Change Order:
The City requested proposals for additional Landscaping, Salvage of Overlook.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described
in PCO 1.1, attached.
Original Contract Amount $ 612,243.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Working days subtracted: 0
612,243.00
2,838.14
Percent change in Contract to date 0.46%
615,081.14
Su itt by:
j
Date
Approved by:
City ngineer
.2/2 4-2
Date
City Manager, required for Change Orders>$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Acce • ted aif
a •rered o b C.S. Le • ac
Name:
Date
Note to Co ractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you ay proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
NATIONAL _ CITY
INCORPORATED
Paradise Creek Education Park
CIP NO. 16-08
DATE: February 23, 2017
CHANGE ORDER NO. 1
WORK PERFORMED BY: C.S. Legacy
DESCRIPTION OF WORK: Add landscaping, salvage of overlook
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1)
Additional Landscaping, Salvage of Overlook
2,838.14
TOTAL:
$ 2,838.14
BE a
IS i• _•®S
1•r•111•111111111111111101
101111111111111111110111111111111111111
C.S. LEGACY
CONS 1' f2 L. C: .n 1 O N. 1 ?- C.
Extra Work Proposal PCO 1r1
Project: Paradise Creek
Labor
Name:
Date of Work
Date of proposal
A.dditionai landscaping per revised plans /Salvage of Overlook/
Additinal signing striping
Description Hours
Rate
Total
0
0
0
Superintendant
0
64.93
0
Foreman
2
64.93
129.86
Labor
16
64.93
1038.88
Operator
0
84.86
0
Mason
0
72.15
0
Subtotal Labor
1168.74
Equipment
Type
Description Hours
Rate
Total
0
0
0
0
0
0
Pickup
8
50
400
Minni Ex
8
50
400
0
0
0
0
Subtotal Equipment
800
Materials
1/27/2017
1168.74
800
Description
Qty
Unit
Total
400
0
Signage/Striping/removals by city
1
0.00
0
0
Plants
1
400
400
0
0
Subtotal Materials
400
Rate Amount Total
Markup Sub
0
Markup equip
0.15
800
$ 120.00
Markup Materials
0.15
400
$ 60.00
Markup Labor
0.2
1168.74
$ 233.75
Bond
0.02
$ 2,782.49
$ 55.65
SubtotalTotal Cost
$ 2138114
Total Cost
Agency Representative
Date
Contda
$ 2,838.14
Representative Date
5
F.
e
E
PLANT SCHEDULE
9�e 001.w;a .VE
SE A s.1.mom. 'Ma ...
SSE& 91X w'w6.0E61 w.M l ccryl+S=
• AM M AMwa.rl..a Eorr+anVeve. 10 s4.0.
® N 11 A..Pr6MMa..1F..b 1 b.9
(1) nc, a 66o0.61006,064646666..a 6N1 AO.c,
a A606666 a*.,6Mw00Y406 60 4O.0
3 ` �;�.w�,1M,WwM 601
EME9�a+ u6rmIC•1406 ramr
B. SO .00601616460.06,6560.
w Q. E0,9115PEw1,1x.AW;w u�€M
• 5
0
a. .
Ma • L "tom..
mi 91.59
ARM %oaRR.,599mar a,.,6«..
▪ .rvn EOSEvs EWE _ O4r6146,, 0J0,66 ., f:SAL
SRN:
10 KO.
c .6. y 40
aW 6O.C.
6E 60.0
w1 .
50 RUC
30
601 S.L.
6F.1 5 00
SEED MIX CHART PLANTING NOTES
TRANSITIONAL
5O01TI10 POE
UVL AND SEED
0.61011 Mar
MIX
DR PL5
us/Ac.
EFNMPU'. 07*104 OIASCW
O[PO EE0
w5
10
DI MMORE 0.590U94TA
0.5OCI10 1190R0
*0
1.0
r5CECM0ETSM MED..
CAMERA POPPY
115
1.0
Y uW4iFRE1.6161
ERouwnW
MR[KMstwa
2
1.0
519A PUgMA
MARI EEOlt6RA%
75
3.0
TEA.
59
SEED MIX NOTES
FLEXTERRA • ER0610N CC/MIMI.
OMrMO. TWNM1n FALL wnu nrip=crneu�sie[ws in.µ vAL
r [uiwArwv
FMwwcr`wwEwW�! Aa�P.4!'Ew01.i uc wRu.e.w
\ c;t,, ce __ d 1,m. AF
• a9TO EETAworRCO..6intiOswANias TO
.07 EroAMAWT ZEE. WCN6w5Y9.Or 1r0 NN
MRS Ms EwrlEa Ore MESEEE.
MDR. RWECT.09R1w.11ORSUM AMID 09004s•uM11W TNM1.0 LEFOR A
MATE01,6 V.aW R., WEEw6 M.NW'ITA 41.01: i4C4RE 1NEEEA.MNO
FF AW At OWIA60i000.4 .66010Awe MO CE 01006
M ANI 14• 016
rvEwEK[ ETK MEMO, DUMMY
RSCRMEMS EOM. wuenswo0. �9M1E5E D,..wcE MOM.w9 RE
A11E.010OFTK.403.06660i birrm.1061CuwM s`
SKEREMOD PI sm. REDDA EMIUMTIMS.H
Mc AraRVE O Ma
Ea,�nOpEMMOOywAEE_6EVAM1 6u TO c
OrDORRA W.
• µEA10AMIST E . OP nw1 PRE.. w NECE;.n Sr
E EMT. LNEROMOU vils9SAAw. lx1EIMNROOK
MOWED
i OM`Rm,TM 0.401s
MPPEUNTEIM RLIMI-
64,066reb6mE 56 : MRO. W•NMA..E
4�E,MTEOW NW RR,A1. M009CAEA1.11IELF
EMTM COMMONS MM*All .54•1411. IF OEDEMAS. Es,
wRECT 1Nc DERNSEMMASE.N MEEMOIa TO rRECEDO
WCON.419 001. WNIARWT P60AAE6N 616.60E COEETMbX
TEAM REPS. MS.1. DOM BALLS WM. SOTS MtOW ORAOE.
APPLIMME If.wOEROW6I. AECEWRw 10 IMP SExAMTMO AEM
Or EOP mmuncras.- orrooPPMEEER R.DomEETIM E4, EORMIO.W/OR
1 -4.1519.11011tS Er MEWS 5. AM Mo WORM' ERN wwPOCMEMM RJEDDREM LMOSE.IWF EEASPE
coNTRAATTATAAA Rms. Au. RSM M, mug MrEs.r0ER.4E
Wm4.. .M.55.r. NAM
R , ERRs'06MrrTF Eu.6VE 51. 1 M..w
1 E ENRt ODMES1 iEi A«noR
NEAC• E « osiR.9101 `.:w.ve"E w'i. E9wabrm5
CONSTRUCTION CHANGE
SCRIP
ARPMDA£O
DATE
* 0E� SCA,d. MEW RNww
MP
Kimley»)Horn
ilsmis
num PMSNarI 1 smsrM-M.DIRK^
1.4PETIONAL T
PAikOTIE EDER EOl1CA110NM. PAIR
IRRAATTEAns
uND.AEE SDNEOL E a ROTES
CRY OF NATIONAL CITY
11974. 150
R/w
TAU
FE
r6a P
[DECK UMW,
WY i61E�s
'SPED. PA0Aa16
CAECA EWCAMwAL
.wr c4oz1 wti TO 2
-MO sxA
Ax6 •I19MMO PR1M2,129•
C '; i Tot
WOK
TO/ F66L I-92-7t1-,RM
memo
10TH STREET
•2 MOOR
arc mE
At3.396.19
9.2N.41xn
6 1..2RNu4o[.0
I,6 3.691.26
[ 6.264N1.47
.2 MOM MOOG ZONE. 9.11
MOMS
AMINIT
PALM
a
CONSTRUCTION CHANGE
W.
02100R110N
APPROVED
DATE
A
w9 0ECR 2LA. Il10 •ARa RM H 421140 PAM. SPA<L.
,00
11/4/2016
LEGEND
0
D
SAYOT
ERA.. 1.2012
Rol
<OLRE 4 Pl2 41 PAR0A0R1, EWAPO 25E LMIE. A2
coNse 1 661400E *R[119CS C.RO 0 GlOIA0.
*MEAAR% OW,44 w
AND 4w.w
COYLCI Mw wE Px�P@20 efrAmo41SEX).l
ROKAC CCT*2 111AM E0 29 0110 URU,6AA,LPoKCOFIFF01
DEMOLITION NOTES
Qi P6ott1T w 7Aa.
O1 RELCCAI[. SCE IWR2Kl4RT PLANS FOR RIR1OCA60x.
IF DOT WO. CN MS%CU
S $,A1KE1T Pq CfIAR A W , OE. _ -
Uumr. ..ry Y2u.R nT6rt9—j'Aik
- ¢[,uuo 2Krt x2uoxE, ott. n wmo
e M1otl.u. 2E2 1.4400100E PEARS 201 LOCATO1.
GENERAL DEMOLITION NOTES
mTr 16 U 120900 A440 M0920112MAR1CN EOCAMM OF ALL
mLs wTom Tr6 mo,EC2 uEA aEAT RAY C.ILICT wn
PROPOOLO 04101ROCIFOM. V[f1{Y TWAT ANr MUIR, SOON 10 OE
to CONCOCTELOCATED BE011.2 W[aATEE, HAW MR
M`O. a Mr FM 1.2/4001
RtwM.
OSOTY <010FCTS PRIOR Io x7. START OF MT aW'URON &WV
2. 1 FEE
9.01110 020 DT iM1. PxEYER ATILMk IT iEMin9:c EA CW
6cu69,
O 16.0.10R12 ARE WOW FOR WEI. i Wen.,
u SPECIAL PARAMSC WELK EMNAMWI'F21
'9.1 DCRCPOTCC AA9 w T.A WZCO AA NCO 10 O+CIE.
1. SEE 021 .AM6 PATE. row REwv21. AE ouIRR45, MOOR
AONSRAEATS a v9cADor . AILO Ranc2A2EA'T,
i n1iA MCNE Pt/Ms Itu K:41AMU AEEAS TOOT wJTE:¢O a�
AM: j.',CALL w MT
Kimley>»Horn
NAf70NALCITIA
rAR00se CST. EL]4CATE94Y. PAW..
IlleFONEMENTS
DOOM EDC. PLMI
CITY OF NATIONAL CRY
104.74- on,
FINA'- IMPROVEMENT PLANS - CITY OF NATIONAL CITY - PARADISE CREEK EDUCATIONAL PARK IMPROVEMENTS
8
d
8
A
s
R
}
5
1
z a
J
E
F � C
7
B
N
a
5
1
MATCHLINE - SEE BELOW RIGHT
,40
MATCHLINE - SEE BELOW RIGHT
MATCHLINE - SEE ABOVE LEFT
4TO.J.0wxLI
4-22 *A. SMAO LT
A/a
\ 4 3.00. 2072. LT
.nu. =AO LTLT' TAa2A—� {- I
1.2011 O.1S' ITT
1917-I TROT ANAL w, n—^ 1' 1
me
vow O/RO 40
m oweA00L
.0 sXArEOGOMlO\
IMO
ars
♦SS, I O aT
40.1r. woe or
*'sAEaA
au CAW..
MOM
CONSTRUCTION CHANGE
OE0C0I0004 I APPAOIOD
DATE
O1MAOC AXEA HLDCA1al. NER NA`OICAP PAW G DPACE.
W 0E2 IIEMAa6
/5/
LEGEND
FAA. O.* Ay/ALT F. P220. CaA;Nky. AX0 SAY
notorm moor*
OCAaEIC ISAOVAL OAC1U0C5 CLAD a: WTTCA.
AUS 0A no m o002*010 05.1 +4 W
MOW wTA csDYu .NXowrXlsl
CONAILEXL TvIAL
cor.,Ancc aA lArkerAL Daum mfi:nE
DEMOLITION NOTES
pi PA011t, in PLACE.
O ADA6110 n.s ED ;AADn.
O M OrrE
O PROLOG
OOLE IIr 11X5r0CFIPLAG Aal MA N LOCACM
IF 0 5AAX0:1 v[X LE'AA A ON vial 04.
Q r6pO+aK VA4C XCWWr ,0 CMIEX Al IMS
ANF NAALWK OAY. G 9psR
O AcOPnisonAN IC PPE M* fadva: N[1 MIO
GENERAL DEMOLITION NOTES
I. .mows EAA'v PICALL
WA* E. 1NE P70*01 Aw. M TA W CbK A111a0. [
7nsonor1aC vrArT MAT APT DIUMS SNDAA TO OE
OCATED Or 000111 IMAE Of[X AELOCATED AAp ME . L .FR
copr.
pA1ELY W.M EWAXEO or We KS.SXX1°
00 COWOCIS DIPOA TO slWl a An DCS ILA *IA.
2. A M11 AP
E TO or roOFECTEOMWACE 5ANL &
Mas Or mi-SLXVADa1 RAfl. sCE Lw>SCAM
PROPOSED ON+AaaKATS AXL Wan FOP AMP.. PDXPDYs
OM Y.
S. SEC HAMMwX Dr. 1a< MLIa.ALS. AODUDWs. 410/00
00.02.NIS 6 A. ADO AEA. MMAOOKIITS
a. YE LAXOSCAPE PLANS TOO LC0LIA0➢ ATd32 TO OE PAO'CO LD M.
O. GY5WACItli Wlsl 0NME Ala 0ttLOCMD smVwi Alq
v -73 0* ASrwr_ 0CW240 4 AEMO05
11u.1 L1A0[-A1rintor.0 OT PC Ott CAOWRA wY OEMs 01A2.1.�
If PAAwrIF woo ao or . COMMCTCA
X AEU
0
Kimley»>Horn
pjAUONALCiZ
PAMO6E C PEEN. EDUCATi0MAL PAWL
010.401.MON Fun
CITY OF NATIONAL CITY
ms. WA. rows
.wucrm 0%DI4+20
Ann
1N74- DOD
+— CALIFORNIA •+*
TIONAL CITY
L INCORPORATRD
Paradise Creek Education Park
CIP NO. 16-08
Contractor: C.S. Legacy
CHANGE ORDER NO. 2
February 23, 2017
Reason/Purpose for this Change Order:
The City requested proposals for additional Concrete Slab and DG.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described
in PCO 2.1, attached.
Original Contract Amount $ 612,243.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days addTh W9 k ng days subtracted: 0
2,838.14
615,081.14
16,872.52
Percent change in Contract to date 3.22%
631,953.66
S •mitt-. by:
,
Date
ZIZ-til
7
P ec ' anager
Approved by:
Cityer
Date
City Manager, required for Change Orders >$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and agreed to by C.S. Legacy:
Name: Date
Note to Contractor: If you d of gr with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed and prote . You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, ntractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
+ CALIFORNIA
NATIONAL CIS' �'y
e e
INCORPORATED JJl
Paradise Creek Education Park CHANGE ORDER NO. 2
CIP NO. 16-08
DATE: February 23, 2017
WORK PERFORMED BY: C.S. Legacy
DESCRIPTION OF WORK: DG, Slab
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1)
Concrete Slab, Additional DG
16,872.52
TOTAL:
$ 16,872.52
Extra Work Pro
Project.
Labor
Name:
Subtotal Labor
Equipment
C.S.inmaimmisionam
LEGACY
CCs, NSTiGc, t t<y;v
posal PCO 2r1
Date of Work
Paradise Creek Date of proposal
Slab per revised plan for new shed/grading
Additional DG per revised plan
Description Hours
Rate Total
0
0
Su erintendant 0 0
Foreman 64.93 0
Labor 32 64.93 0
Operator 64.93
16 84.86
Mason 32 72.15
2077.76
1357.76
2308.8
5744.32
Tx e Description Hours Rate Total
concrete pump 4 125
Mini Excavator 00
8 75 600
Pickuo 16
Subtotal Equipment
Materials
Roller
Skiploader
16
16
40
50
75
640
800
1200
3740
2/9/2017
5744.32
3740
Description
Q
Qty
Unit
Total
4650
Concrete/rebar
7
150
1050
DG
80
45.00
3600
0
0
0
0
Subtotal Materials
4650
Rate Amount Total
Markup Sub
0
Markup equip
0.15
3740
$ 561.00
Markup Materials
0.15
4650
$ 6 7.50
Markup Labor
0.2
5744.32
1, 08.86
Bond
0.02
$ 16,541.68
430.83
(tit
SubtotalTotal Cost
$ 16,872.52
$ 16,872.52
Agency Representative
Date
Contractors 7epresentative Date
l
f
,7
Paradise Creek Education Park CHANGE ORDER NO. 3
CIP NO. 16-08
Contractor: C.S.Legacy
Reason/Purpose for this Change Order.
The City requested proposals for additional shed, trex deck, fencing, gate, railings, stairs.
February 23, 2017
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described
in PCO 3, attached.
Original Contract Amount $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days atJded: 0 /1Working days subtracted: 0
612,243.00
19,710.66
631,953.66
30,739.84
Percent change in Contract to date 8.24%
662,693.50
itt b.
.
2,12.4-(
Date
17
roject Manager
Approved by:
.2. ..... .
CitCitneer
- /'-
Date
3lq ln,
City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted and a. reed to by C.S. Legacy:
Name: � Date`
Note to Contractor ou .. t agree with this Change Order you may be directed to proceed with this work under the terms of the ' ntract
and you may profed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
y�
Originals: City l.Ierk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
+r.* CALIFORNIA .
(MA L Cir • y
INCORPORATED
Paradise Creek Education Park
CIP NO. 16-08
DATE: February 23, 2017
CHANGE ORDER NO. 3
WORK PERFORMED BY: C.S. Legacy
DESCRIPTION OF WORK: Fencing, gates, railings, shed, trex
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1)
Fencing, gate, railing, shed, trex,
30,739.84
TOTAL:
$ 30,739.84
ta pa MIMIC
111111111111111111111111111111111111
C.S. LEGACY
G Gj N S 'i" YL L I C 'CSC,
Extra Work Proposal PCO 3 Date of Work
Project: Paradise Creek Date of proposal
Labor
Name:
Additional Fencing/Gate/Railing/Shed/Striping stairs/Trex
per revised plans
Description Hours Rate Total
0
0
0
Superintendant
0
64.93
0
Foreman
8
64.93
519.44
Labor
48
64.93
3116.64
Operator
0
84.86
0
Mason
0
72.15
0
Subtotal Labor
3636.08
tquipment
Type
Description
Hours
I Total
0
0
Pickup
0
40
0
0
0
Subtotal Equipment
0
Materials
12/19/2016
3636.08
0
Description
Qty
Unit
Total
22412
Fencing/Gates/Rails
1
14412
14412
Additional Tex
1
2,500.00
2500
Additional stripng stairs
1
500
500
Additional Shed
per attached
1
5000
5000
0
0
Subtotal Materials
22412
Rate Amount Total
Markup Sub
0
Markup equip
0.15
0
$ -
Markup Materials
0.15
22412
$ 3,361.80
Markup Labor
0.2
3636.08
$ 727.22
Bond
0.02
$ 30,137.10
$ 602.74
SubtotalTotal Cost
$ 30,739.84
it
A
Total Cost
$ / 30,739.84
Agency Representative
Date
Contractors Represent Dat
aoov
IArC�I jTyD
Paradise Creek Education Park
CIP NO. 16-08
Contractor: C.S.Legacy
CHANGE ORDER NO. 4
February 23, 2017
Reason/Purpose for this Change Order:
The City requested proposals for a construciton entrance to the park phase 2 site for sewer tank pump out.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with the work, as more particularly described
in PCO 6, attached.
Original Contract Amount $ 612,243.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Working days added: 0
Working days subtracted: 0
50,450.50
662,693.50
3,518.64
Percent change in Contract to date 8.81 %
666,212.14
9ticmftiki
Prole anager
Date
Z
ZjZy0/7
Approved by:
Cit nneer
City Manager, required for Change Orders >$24,999
Date
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepted a , • agreed to by C.S. Legacy:
Name: =� Date Z " I
Note to Contract .0 do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may pro *tau
protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City 4lerk, Contractor cc: Engineering project file, Project Manager
1243 National CiBoulevard, National City, CA 91950
Telephone (619) 336-4380
l
�-* CALIFORNIA
NATIONAL Ca?
INCORPORATED - JJJI
Paradise Creek Education Park
CIP NO. 16-08
DATE: February 23, 2017
WORK PERFORMED BY: C.S. Legacy
DESCRIPTION OF WORK: construction entrance
CHANGE ORDER NO. 4
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1)
construciton entrance for pumpout
3,518.64
TOTAL:
$ 3,518.64
al so mann
naamaiimams
nsimunnannal
C.S. LEGACY
cgNS"i'£t.Lic SloN, !"
PCO 6 Date of Work
Extra Work Proposal Date of proposal
Paradise Creek
Install temporary road for City maintenance personnel
Protect:
Labor Rate Total
Description Hours
Name:
Subtotal Labor
Eauip nsit
Tvoe
Dump truck
Subtotal Equipment
Materials
Description
Rock
Superintendant
Foreman
Labor
Operator
Mason
Description
Skiploader
F'icku _
Hours
Qty
Rate
8
8
259,72
519.44
678.88
1458.04
Total
0
75 600
40 320
0
0
920
Unit Total
1 600
600
Subtotal Materials
0
0
0
0
0
600
1458.04
920
600
Rate
Markup Sub
Markup equip
Markup Materials
Markup Labor
Bond
SubtotalTotal Cost
Total Cost
0
0.15
0.15
0.2
0.02
Amount Total
920
600
14 8.04
$ 365
$ 3,5 8.+4
Agency Representative
Date
Contra
$ 138.00
$ 90.00
291.61
$ 68.99
$ 3,518.64
sentative Date
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
CS LEGACY CONSTRUCTION
Change Order #1 through #4
Paradise Creek Education Park
Judy Hernandez (Engineering/Public Works) Forwarded
Copy of Change Orders to CS Legacy Construction