Loading...
HomeMy WebLinkAboutAce Electric Inc. - El Toyon and Las Palmas Park Lighting Improvements Project - Change Order No.1Working days subtracted: 0 Percent change in Contract to dote 0.74% 717,822.46 CALIFORNIA lost rIi Cfr m coit PoRAT" EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CIP NO. 17-01 Contractor: ACE Electric, Inc. Reason/Purpose for this Change Order: Due to the time constraint and schedule of the project, the City requested that the Musco Plugs required for the light poles that will be installed in the Las Palmas Park to be expedited. This change order includes the expedition of the ordering, delivery, and installation of the Musco plugs. CHANGE ORDER NO. 1 May 1,2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall provide and procure the Musco Plugs required for the light poles that will be installed at Las Palmas Park site. The Contractor shall have a target delivery date of 5/22/17 for the product and shall install the product per plans/engineer. The agreed upon price for all cost associated with this work is a total of $5,253.00. Original Contract Amount Net change by previously authorized Change Orders Subtotal . Amount of this change order 712,569.00 712,569.00 5,253.46 New contract amount $ Working days added: 0 Submitte(1 by: City ngineer Date City Manager, required (or Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is con pletety familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepte id agree o b ACE tric,rvinc 5--/31)?-. Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 + CALIFORNIA —_ NATIONAL C r r INCORPORATED EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CIP NO. 17-08 DATE: May 1, 2017 CHANGE ORDER NO. 1 WORK PERFORMED BY: ACE Electric, Inc. Expedited procurement and installation of Musco Plugs at Las DESCRIPTION OF WORK: Palmas Park MATERIALS 1) 2) Musco Plug Material Sales Tax (8.75%) Unit LS EA Qty 1.00 1.00 Rate 4,200.00 368.23 Total 4,200.00 368.23 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: $ 4,568.23 $ 685.23 SUB TOTAL: GRAND TOTAL: $5,253.46 5/1 /2017 9:44:16 AM Ace Electric, Inc. Las Palmas El Toyon Community Parks 1878 CO Totals (Summary) - Bid Summary: Default Material Non -Quoted Quotes Sales Tax (8.75%) Total Material Labor Direct (0.01 hours @ $72.86) Non -Productive Labor Total Labor (0.01 hours) Direct Job Expenses Tools and Miscellaneous Materials Subcontracts Job Subtotal (Prime Cost) Overhead (15.00%) Profit (0.00%) Job Total Actual Bid Price Page 1 $4,200.00 0.00 367.50 $4,567.50 $0.73 0.00 $0.73 $0.00 0.00 0.00 $4,568.23 685.23 0.00 $5,253.46 $5,253.00