Loading...
HomeMy WebLinkAbout2017 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Order #29 through #33+ _ r CALIFORNIA C1,0li;-as NATIONAL, Ca r INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 29 May 25, 2017 Reason/Purpose for this Change Order: Sections of curb/gutter, sidewalk and street section were left incomplete due to utility conflicts. Due to loss of production for having to leave sections blocked out and incomplete and come back separetely to each location and complete, an agreed upon 25% would be added to the line item amounts billed. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with completing the missing sections of curb/gutter,sidewalk and street section from utility conflicts at an agreed upon 25% added to the line item amount billed. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 79,946.47 Subtotal Amount of this change order New contract amount Working days added: 0 Submitted by: er Approved by: Working days subtracted: 0 6�b /I4- Date 1,974,444.57 9,437.20 1,983,881.77 Percent change in Contract to date 4.72% 6/�/� City.i{ ineer - Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor wit provide at of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acc ed and agre,ed to by Dick Miller, lnc.: Name: Jeanalyn Grace Date 05/26/17 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 TeTephone j6Ej 336-4380 CALIFORNIA NATIONAL Citify acAv INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 DATE: May 25, 2017 CHANGE ORDER NO. 29 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: 25% Premium for Utility Block Outs No. Item Unit Qty Unit Price Total 13 Removal, disposal and replacement of unsuitable material Ton 71.00 49.00 3,479.00 17 Hot Mix Asphalt Ton 112.00 82.00 9,184.00 18 Class 2 Aggregate Base Ton 153.32 40.00 6,132.80 19 Concrete Curb & Gutter -Type G LF 333.00 27.00 8,991.00 22 Concrete Curb - Type B-3 LF 56.00 22.00 1,232.00 23 Concrete Sidewalk SF 1,915.00 3.60 6,894.00 26 Pedestrian Protective Railing LF 12.00 153.00 1,836.00 Total: Premium (25%): $ 37,748.80 $ 9,437.20 GRAND TOTAL: $9,437.20 ++ CALIFORNIA .K+ NOIo Nt L CITY INCORPORATED 1!1 -- INCORPOn ATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. Reason/Purpose for this Change Order: Additional work at the Northwest corner of N Avenue and infront of the new starbucks was needed for the new development. The work consisted of a new crossgutter, curb/gutter, sidewalk, driveway and pedestrian ramp. The items would be billed to the line items in the contract with a 25% markup for being outside of the original scope. CHANGE ORDER NO. 30 May 25, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with installation of new crossgutter, curb/gutter, sidewalk, driveway and pedestrian ramp at the Northwest corner of N Avenue and infront of the new starbucks. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 89,383.67 1,983,881.77 4,956.40 Subtotal Amount of this change order New contract amount Working days added: 0 Submitted by: Pp�Sject Ma ;r: ger $ 1,988,838.17 Working days subtracted: 0 Percent change in Contract to date 4.98% c16 /l' Date Approved by: 2 _pg_ineer - Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acce ed and agre : d t. b Dick Miller, Name: Jeanalyn Grace, Project Manager Date05/31/17 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 121-3 NationarCityVculevard, National City, K3 3"O Telep�Tione 619j 336-43i30 ,! CALIFORNIA NATIONAL My INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 DATE: May 25, 2017 CHANGE ORDER NO. 30 WORK PERFORMED BY: Dick Miller, Inc. DESCRIPTION OF WORK: 25% Premium for N Avenue and Starbucks Frontage No. Item Unit Qty Unit Price Total 13 Removal, disposal and replacement of unsuitable material Ton 8.00 49.00 392.00 17 Hot Mix Asphalt Ton 30.00 82.00 2,460.00 18 Class 2 Aggregate Base Ton 28.00 40.00 1,120.00 19 Concrete Curb & Gutter -Type G LF 115.00 27.00 3,105.00 22 Concrete Curb - Type B-3 LF 12.00 22.00 264.00 23 Concrete Sidewalk SF 461.00 3.60 1,659.60 27 Concrete Cross Gutter SF 562.00 9.50 5,339.00 29 Type C Pedestrian Curb Ramp EA 1.00 1,560.00 1,560.00 31 Concrete Driveway SF 120.00 9.80 1,176.00 46 Type A Curb Outlet EA 1.00 2,750.00 2,750.00 Total: Premium (25%): $ 19,825.60 $ 4,956.40 GRAND TOTAL: $4,956.40 \// CALIFORNIA NATIONAL eft INCOAPORATAD PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. Reason/Purpose for this Change Order: The contract called out to use an existing foundation for a new street light on the North side of Plaza blvd at station 44+65, however, the existing street light was direct burial without a foundation. Under direction of the Engineer the Contractor proceeded under time and materials for digging and installing a new foundation. CHANGE ORDER NO. 31 May 25, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with digging and installing a new foundation on the North side of Plaza Blvd at station 44+65. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 94,340.07 Subtotal Amount of this change order 1,988,838.17 738.21 New contract amount $ 1,989,576.38 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 5.02% Submitted by: P�ect Man Approved by: City -Engineer / Date City Manager, required i 420e9 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Acc fed and agree to by Dick Miller, Inc.: � Name: Jeanalyn Grace Date 05/26/17 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City CA 91950 TelenNonej619) 336-4380 CALIFORNIA N -f' IONAL CirrY MOV INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 DATE: July 28, 2016 CHANGE ORDER NO. 31 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Dig and pour streetlight foundation ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) UT TECH 2 - Carlos Balderas Hour 1.00 37.75 37.75 2) UT TECH 3 - Arturo Cardenas Hour 3.00 30.99 92.97 3) UT TECH 3 - A Sandoval Hour 3.00 26.89 80.67 1) California Electric Supply 2) McCain Anchlor Bolts 3) Robertsons Read v Mix Unit LS LS LS Qty 1.00 1.00 1.00 Rate 19.79 92.28 99.64 $ 211.39 25.37 $ 42.28 Total 19.79 92.28 99.64 $ 279.04 1) Utility Truck 12-20 2) Compressor Unit Hour Hour Qty 3.00 3.00 Rate 28.17 17.33 $ 211.71 16.94 $ 31.76 26A.41 Total 84.51 51.99 $ 136.50 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: PRIME CONTRACTOR MARKUP (5%) BOND AND INSURANCE (1%): $ 20.48 $ 156.98 $ 34.82 $ 6.96 GRAND TOTAL: $ 738.21 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: Sub -Total Labor: Labor Burden (12%): Labor Markup (20%): TOTAL LABOR: SOLD TO: CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 T & M ELEC/DBA PERRY PO BOX 710130 SANTEE, CA 92071 ***DUPLICATE*** ***US -MAIL*** SHIP TO: INVOICE NO. I INVOICE DATE 1069-713559 07/12/16 pT,RASE SHOW INVOICE N0. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 T:858 451-7090 F:858 451-7094 T & M ELEC/DBA PERRY 1011 BAY BLVD. CHULA VISTA, CA 91911 ACCOUNTNO. KY-68026 JOB #702 - EDUCATION FIRST JOBNAMEANDADDRESS CUSTOMERORDERNO. 702-559 SALESPERSON SHIPPING INFORMATION SHIP VIA SHIP DATE 1448 RJAII+fIiS PREPAID WILL CALL 07/07/16 r r f ' r -QUANTITY BRE 4. bESCR1P7'ION, c. a _ °' a ,s ., o 9HPPED PRICE• . q DISC. 4R0� L PRODUCT CO��.,. 'f`�T;� :: EXTENSION C!D 200 PVC SCH40-2 CONDUIT 200 63.40 C 126.80 2 PVC QUARTGLUE CEMENT 2 742.25 C 14.85 1 PVC GALLONGLUE CEMENT 1 32.20 E 32.20 8 PVC SCH4OELL2X90 90D PVC ELL 8 172.47 C 13.80 20 WIRE BARE4STR BARE COPPER SD 20 916.16 M 1 SDPRE E03119BOX 3EBOX 10"X15" PULL BOX 1 29.97 E 1 SDPRE E03119STLGT 3ECOVER/STLGT 1 22.46 E 22.46 1. 15 , 3."' TITLE AND RISK OF LOSS OR DAMAGE TO MERCHANDISE PASSES AT POINT OF CODE; TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE IS USED ON OUR MERCHANDISE 258.40 SHIPMENT. CLAIMS FOR SHORT OR DAMAGED MERCHANDISE SHOULD BE MADE INVOICES. 8.000 20.67 TO CARRIER. B - BACK ORDERED. WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CANCEL. SALESTAX MERCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT HE ACCEPTED. A C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LOCALLY. SHIPPINGCHPRGE •00 RESTOCKING CHARGE WILL RE MADE ON RETURNED GOODS UNLESS DEFECTIVE OR THAU ERROR ON OUR PART. A SERVICE CHARGE OF 1.5% PER MONTH, BUT NOT TO EXCEED THE HIGHEST NET PAYMENT IS DUE BY THE 15TH OF AMOUNT LAWFULLY ALLOWED BY CONTRACT IN THIS STATE, WILL BE MADE ON THE MONTH FOLLOWING PURCHASE TOTAL DUE 279.07 ALL PAST DUE ACCOUNTS. THIS BALE I9 SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERM9.COM, WHICH WE MAY CHANGE FROM TIN.E TO TIME WITHOUT PRIOR NOTICE. ANIPS• Acir giNtiga , Virg %FAO • 'F's 2365 OAK RIDGE WAY * VISTA * CA 92081-8945 (760) 727-8100 * FM (760) 727-8264 L L 0 Perry Electric P. O. Box 710130 Santee, CA 92072 INVOICE Perry Electric 11521 Woodside Ave Santee, CA 92071 INVOICE NO: INV0209603 INV0CEDATE i 6/13/2016 CUSTPMER NO P1427-0114 Perry Electric P. O. Box 710130 Santee, CA 92072 OUR ORDER NO I CUSTOMER4,7 OS , AB. ! -.....,.,,,i:.:::::.;,•,- .:.f.:;i .4get..:: .: d,',.:5,0'.?:-: -.RESALE.NUMBER •.::',SHIP VIA .;:g:.. , ,..., , .f:gica:Y ORD004470841 i 696 Destination, Prepaid i I MCCAIN 01 TERMS .;.,ii:;.•,:::,.iDATEi4HIP5t..,.46 .:;.w. CUSTJOB NO SALES REPRESENTATIVE ::.-:-•!1-;:.:-.::: - .:: 'i:.;::.; : • .. 7 ` Net 30 06/10/16 696 Jesse Phelan ITEM LOC NUM :: 4,194141-1 fikl!,#I!31A.diSiOikijilR'. rgOalCffirDESCRIPTION , .„.„.., .:p., ' .-42.:.COMMENTS ' ' SOIPPED la, NIT ::Lr.jPC j EXTENSION :,,l_q PRICE 1" '-. .:,. : ..:.:•:::::-...:.::::.: : ANCHOR BOLTS FOR N AVENEUE ! N.A.6Y. ' -35 'Au 1 2 3 4 5 1 6 FG FG FG FG FG FG 8.00 4.00 4.00 1.00 1.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 M71544 / ANCHOR BOLT, GRD 55, 1X36, 4 NUTS & WASHERS USA M71549 / ANCHOR BOLT, GRD 55, 1.5X42, 4 NUTS & WASHERS USA M71552 / ANCHOR BOLT, GRD 55, 2.5X42, 4 NUTS & WASHERS USA M71581 1 ANCHOR PLATE, 15-3/8": FOR 1-1/2" BOLTS.17-1/2" BC M71583 / ANCHOR PLATE, 19-7/8": FOR 2-1/2" BOLTS, 21" BC M71571 / ANCHOR PLATE, 8": FOR 1" BOLTS, 8-1/2" BC ANCHOR BOLTS FOR PALM AVENEUE 06/10/16 06/10/16 06/10/16 06/10/16 06/10/16 06/10/16 21.46i T 59.031 T 243.49 T di 3 34.661 T 56.91i T 9.861 T • Is Ll 171.68 LQ • 36.12 circg...0._ • 973.96 34.66 56.91 19.72 7 8 9 10 11 12 13 14 FG FG FG FG 1 FG FG 1 FG FG 4.00 4.00 16.00 8.00 8.00 2.00 2.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 M25503 / ANCH BOLT 518 X 18 X4 AMERICAN NUTS/WASHERS 06/10/16 M25504 / ANCH BOLT 3/4 X 18 X4 AMERICAN NUTS/VVASHERS 06/10/16 M71544 / ANCHOR BOLT, GRD 55, 1X36, 4 NUTS &WASHERS USA 06/10/16 M71550 / ANCHOR BOLT, GRD 55, 2)(42, 4 NUTS & WASHERS USA 06/10/16 M71552 / ANCHOR BOLT, GRD 55, 2.5X42, 4 NUTS &WASHERS USA 1 06/10/16 M71582 f ANCHOR PLATE, 16-3/8": FOR 2" BOLTS, 17-1/2" BC 1 06/10/16 M71583 / ANCHOR PLATE, 19-7/8": FOR 2-1/2" BOLTS, 21" BC 1 06/10/16 M71571 / ANCHOR PLATE, 8": FOR 1" BOLTS, 8-1/2" BC 06/10/16 , 5.361 T 21.44 7.641 T 30.56 20.951 T 1 335.20 117.591 T 940.72 237.751 T 1,902.00 38.191 T 76.38 : 55.571 T 111.14 9.621 T , 38.48 SUB TOTAL MISCELLANEOUS .:5•:!..• : - SAIIE'r. . 'f!:;.': '-. ,I1EIGHT :.:•,.. :: : ‘.•:PLEASE PAy•TOS'ilAMOUNT 4,948.97 0.00 395.94 0.00 5,344.91 ,AtixFinderOut11 (1/2) O8/U3/ZU1b U0:10:3, rri -vfvv ROBERTSON'S ROCK • SAND • BASE MATERIALS READY MIX CONCRETE (951) 685-2200 • (800) 834-7557 FED. I.D. #33-0491865 CUSTOMER JOB NUMBER / P.O. 696 JOB ADDRESS PALM AVE & E PLAZA NATIONAL CITY DELIVERY DATE 07/28/16 PERRY ELECTRIC PO BOX 710130 10765 WOODSIDE AVE STE B SANTEE CA 92072 10 C PLANT DEL FROM ZONE dooC DATE 07/26/16 COST. NO. 00458 NUMBER 823670 JCN NO. 696 REMIT TO: P.O. BOX 3600 CORONA, CA 92878 TERMS: DUE 10TH OF MONTH FOLLOWING DATE OF INVOICE DEIJVERY TICKET NO. 2175283 2175283 ARRIVE JOB 14:16 FINISH POUR 14:48 MN 32 OUANTTFY 4.00 4.00 UNIT CY PY DESCRIPTION TAX SD560B31 560C3250 PUMP/ Y 3100 SHORT LOAD Y UNIT PRICE 83.00 AMOUNT 332.00 60.00 STANDBY TIME TOTAL MIN 32 ALLOWED MIN STANDBY MIN 16 16 ENERGY SURCHG ENV FEE SUBTOTAL SALES TAX 10.00 20.00 422.00 37.98 20.00 TOTAL QUANTITY 4.00 TERMS: INVOICES ARE DUE 10TH OF MONTH FOLLOWING DATE OF INVOICE. PAST DUE ACCOUNTS SUBJECT TO A MONTHLY SERVICE CHARGE OF 1.5%. BUYER TO PAY REASONABLE COSTS OF COLLECTION INCLUDING ATTORNEY FEES. INVOICE TOTAL 479.98 CALIFORNIA t. Amount of this change order New contract amount $ NATIONAL Cfrr IURN NCORPORATE PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. Reason/Purpose for this Change Order: CHANGE ORDER NO. 32 May 25, 2017 The additional work at the Northwest corner of N Avenue and Plaza Blvd required some electrical items to be adjusted with new conduit and pullboxes. Under direction of the Engineer the Contractor proceeded under time and materials to install new conduit and pullboxes. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with installing new conduit and pullboxes at the NW corner of N Avenue and Plaza Blvd. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 95,078.28 Subtotal 1,989,576.38 1,228.59 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 5.08% Submitted by: 6/6 /4 Date 1,990,804.97 Approved by: /44) City_gngineer Date City Manager, required for Change Orders >s24,989 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to oby Dick Miller, Inc.: Name: Jeanalyn Grace Note to Contractor: If you do not agree with this Change Order you may and you may proceed under protest. You must comply with the contract Originals: City Clerk, Contractor 1243 National City Boulevard, National City, CA 91950 Date 05/26/17I be directed to proceed with this work under the terms of the contract requirements of submitting a written protest to protect your claim. cc: Engineering project file, Project Manager Telephone (619) 336-4380 I / --CALIFORNIA NATIONAL Cr`r 11C3C3V INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 DATE: March 31, 2017 CHANGE ORDER NO. 32 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Set 2 - #6 Pullboxes ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) UT TECH 2 - Carlos Balderas Hour 3.00 40.11 120.33 2) 3) UT TECH 3 - Arturo Cardenas UT TECH 3 - John Cruz Hour Hour 3.00 3.00 32.83 32.47 98.49 97.41 4) UT TECH 3 - Robert Tesam Hour 3.00 34.34 103.02 Sub -Total Labor: Labor Burden (12%): Labor Markup (20%): TOTAL LABOR: $ 419.25 $ 50.31 $ 83.85 $ 553.41 ATIALS Unit Qty Rate Total 1) Schedule 80 PVC 90's LS 1.00 21.24 21.24 2) #6 Pullbox LS 1.00 168.13 168.13 3) Schedule 80 PVC 2" conduit LS 1.00 11.48 11.48 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: $ 200.85 16.07 $ 30.13 $ 247.05 EQUIPMENT' 1) Utility Truck 12-20 Unit Hour Qty 3.00 Rate 28.17 Total 84.51 2) Utility Truck 12-20 Hour 3.00 28.17 84.51 3) Dump Truck Hour 3.00 47.60 142.80 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: PRIME CONTRACTOR MARKUP (5%) BOND AND INSURANCE (1%): $ 311.82 $ 46.77 $ 358.59 $ 57.95 11.59 GRAND TOTAL: $1,228.59 SOLD TO: CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 T S M ELEC/DBA PERRY JOB #696 PO BOX 710130 SANTEE, CA 92071 ***DUPLICATE*** ***US -MAIL*** SHIP TO: INVOICE NO. I INVOICE DATE 1069-727765 04/04/17 p7.FASE SHOW INVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 0:858 451-7090 F:858 451-7094 T S M ELEC/DBA PERRY 1011 BAY BLVD. CHULA VISTA, CA 91911 ACCOUNTNO. EY-97994 JOB #696 PLAZA BLVD WIDENING x JOB NAME AND ADDRESS CUSTOMER ORDER N0. 696-765 SALESPERSON 1448 RH SHIPPING INFORMATION PREPAID SHIP VIA WILL CALL SHIP DATE 03/30/17 ' .. .. WANTUY ORDERED P3ODUCTC00E DESCRIPTION, .; , a OD 77T`! ,'„ ' SHIPPED ' PRICE '. w DISC. EXTENSION ' CID 1 PU GR588 5/8 X 8 GROUND ROD 10 PVC SCH8OELL2X90 ELBOW 1 12.50 E 10 983.53 C n 12.50 98.35 TITLE AND RISK OF LOSS OR DAMAGE TO MERCHANDISE PASSES AT POINT OF SHIPMENT. CLAIMS FOR SHORT OR DAMAGED MERCHANDISE SHOULD HE MADE TO CARRIER. MERCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT BE ACCEPTED. A RESTOCKING CHARGE WILL BE MADE ON RETURNED GOODS UNLESS DEFECTIVE 0R THRU ERROR ON OUR PART. A SERVICE CHARGE OF 1.58 PER MONTH, BUT NOT TO EXCEED THE HIGHEST AMOUNT LAWFULLY ALLOWED BY CONTRACT IN THIS STATE, WILL BE MADE ON ALL PAST DUE ACCOUNTS. THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.CUR-TEPMS.CCM, WHICH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE IS USED ON OUR INVOICES. B - BACK ORDERED, WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CANCEL. C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LO('A'TY. MERCHANDISE SALESTPX SHIPPING CHARGE 7.750 110.85 8.59 .00 NET PAYMENT IS DUE BY THE 15TH OF THE MONTH FOLLOWING PURCHASE TOTAL DUE 119.44 SOLD TO: CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 T & M ELEC/DBA PERRY JOB #696 PO BOX 710130 SANTEE, CA 92071 *++DUPLICATE*** ***US -MAIL*** SHIP TO: INVOICE NO. INVOICE OATE 1069-727759 04/05/17 pl.F,ACE SHOW INVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 T:858 451-7090 F:858 451-7094 T & M ELEC/DBA PERRY CARLITO 619-971-1818 PLAZA & N NATIONAL CITY, CA 91950 ACCOUNT NO. KY-97994 JOB #696 PLAZA BLVD WIDENING T JOB NAME AND ADDRESS CUSTOMER ORDER NO, 696-759 SALESPERSON 1448 DZ SHIPPING INFORMATION PREPAID SHIP VIA OUR TRUCK SHIP DATE 03/30/17 ... gUANTITY .. c QUANTITY P ORDERED PRObUCT DE DESCRIPTION c - SHIPPED PRICE n MSC. 6),KTENS$ON . CID 9 SDPRE E06119BOX 6EBOX 17"X30" PULL BOX 9 36.87 E 8 SDPRE E06119TRSIG TR/SIG 8 40.97 E \\_ c; .L \ °n -- \ ' °H1/4 331.83 327.76 TITLE AND RISK OF LOSS OR DAMAGE TO MERCHANDISE PASSES AT POINT OF SHIPMENT. CLAIMS FOR SNORT OR DAMAGED MERCHANDISE SHOULD BE MADE TO CARRIER. MERCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT BE ACCEPTED. A RESTOCKING CHARGE WILL BE MADE ON RETURNED GOODS UNLESS DEFECTIVE OR THOU ERROR ON OUR PART. A SERVICE CHARGE OF 1. s% PER MONTH, BUT NOT TO EXCEED THE HIGHEST AMOUNT LAWFULLY ALLOWED BY CONTRACT IN THIS STATE, WILL BE MADE ON ALL PAST DUE ACCOUNTS. THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERMIS.COM, WHICH WE MAY CHANGE £ROM TIME TO TIME WITHOUT PRIOR NOTICE. CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE IS USED ON OUR INVOICES. B - BACA ORDERED. WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CANCEL. C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LOCALLY. MERCHANDISE SALESTAX SHIPPING CHARGE 8.7SO 659.59 57.71 .00 NET PAYMENT IS DUE BY THE 15TH OF THE MONTH FOLLOWING PURCHASE TOTAL DUE 717.30 SOLO TO: CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 T & M ELEC/DBA PERRY JOB #696 PO BOX 710130 SANTEE, CA 92071 ***DUPLICATE*** ***US —MAIL*** SHIP TO: INVOICE NO. I INVOICE DATE 1069-727816 04/04/17 PLEASE SHOW INVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 T:858 451-7090 F:858 451-7094 T & M ELEC/DBA PERRY 1011 BAY BLVD. CHULA VISTA, CA 91911 ACCOUNT NO. KY-97994 JOB #696 PLAZA BLVD WIDENING JOB NAME AND ADDRESS CUSTOMER ORDER NO. 696-816 SALESPERSON SHIPPING INFORMATION SHIP VIA SHIP DATE 1448 RH PREPAID WILL CALL 03/31/17 v ORDERED „,PRIJDUGTc00E DESCRIPT70N - o - SHMPED,, . PA4GE n DISC, EXTENSION 60 PVC SCH80-4 CONDUIT 60 287.39 C 172.43 80 PVC SCH80-2 CONDUIT 80 106.31 C 85.05 10 PVC COUP4 PVC COUPLING 10 179.86 C 17.99 15 PVC BELL END4 BELL END ADAPT 15 405.51 C 60.83 1 PVC O12T LONGLUE CEMENT 1 32.20 E (::/\,,,, 32.20 \C� �'� 1 C) x �`�-P = o $� kc� TITLE AND RISE OF LOSS OR DAMAGE TO MERCHANDISE PASSES AT POINT OF CODE, TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, THIS CODE IS USED ON OUR MERCHANDISE 368.50 SHIPMENT. CLAMS FOR SHORT OR DAVAOED MERCHANDISE SHOULD BE MADE INVOICES. 7, 7SO 28.56 TO CARRIER. B - BACK ORDERED. WILL SHIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CANCEL. SALESTAX MERCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT BE ACCEPTED. A C - CANCELLED. NOT IN STOCK. UNABLE TO PURCHASE LOCALLY. SHIPPINGCNPRGE •00 RESTOCKING CHARGE WILL BE MADE ON RETURNED GOODS UNLESS DEFECTIVE OR THRU ERROR ON OUR PART. A SERVICE CHARGE OF 1.50 PER MONTH, BUT NOT TO EXCEED THE HIGHEST NET PAYMENT IS DUE BY THE 15TH OF AMOUNT LAWFULLY ALLOWED BY CONTRACT IN THIS STATE, WILL BE MADE ON THE MONTH FOLLOWING PURCHASE TOTALDUE 397.06 ALL PAST DUE ACCOUNTS. THIS SALE IS SUBJECT TO OUR TERMS LOCATED AT SALES.OUR-TERMS.CQ4, WHICH WE MAY CHANGE FROM TIML' TO TIME WITHOUT PRIOR NOTICE. >w CALIFORNIA NATIONAL Cf p 7 lt3 3``1 INCORPORATE PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. Reason/Purpose for this Change Order: CHANGE ORDER NO. 33 May 25, 2017 MTS requested the bus bench and shelter be moved back as bus drivers continued to hit the shelter on the North side of Plaza Blvd at station 47+30. Under direction of the Engineer the Contractor proceeded with relocating the bus bench and shelter to the back of sidewalk. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with relocating the bus bench and shelter to the back of sidewalk. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachment "A" for cost breakdown. Original Contract Amount $ 1,894,498.10 96,306.87 1,990,804.97 Amount of this change order 3,668.81 New contract amount $ 1,994,473.78 Working days added: 0 Working days subtracted: 0 Submittedy: Net change by previously authorized Change Orders Subtotal Pject Mana Approved by: City.Engineer Percent change in Contract to date 5.28% 6/6 /14 Date Date City Manager, requred tor Change Orders >S24.99required for Change Orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: Name: Jeanalyn Grace Date 05/26/17 Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 NationarCity Bou el vard, National City, CA 91950 TelephioneT619r336-4380 \ 1 1 i CALIFORNIA s+ NATIONAL CiTv INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO I-805 Specification # 16-01 DATE: May 25, 2017 CHANGE ORDER NO. 33 WORK PERFORMED BY: Dick Miller, Inc. / Perry Electric DESCRIPTION OF WORK: Relocate Bus Shelter ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) 2) Foreman Laborer Hour Hour 4.00 8.00 80.20 55.52 320.80 444.16 MATER/ALS 1) 2) 3) 4) 3/4" Redhead Anchors 1" Diamter All -Thread Rod Concrete (94 lb Bag) Epoxy Unit Box Ea Ea Ea Sub -Total Labor: Labor Markup (20%): TOTAL LABOR: Qty 1.00 4.00 5.00 2.00 Rate 128.68 31.40 22.09 29.85 $ 764.96 $ 152.99 917.95 Total 128.68 125.60 110.45 59.70 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: $ 424.43 $ 33.95 $ 63.66 EQUIPMENT Unit Qty Rate Total 1) Crew and utility truck Hour 8.00 50.00 400.00 Sub -Total Equipment: $ 400.00 Equipment Markup (15%): TOTAL EQUIPMENT: $ 60.00 2 .04 $ 460.00 SUBCONTRACTOR Unit 1) Relocate Electrical components of Bus Shelter LS Qty Rate Total 1.00 1,650.00 1,650.00 Sub -total Subcontractor: Prime Contractor Markup (50/0): TOTAL SUBCONTRACTOR: $ 1,650.00 82.50 SUBTOTAL: BOND AND INSURANCE (1%): GRAND TOTAL: $ 1,732.50 $ 3,632.49 $ 36.32 $3,668.81