Loading...
HomeMy WebLinkAboutAce Electric Inc. - El Toyon and Las Palmas Park Lighting Improvements Project - Change Order No.2.4 CALIFORNIA I. l.J C"o op' INQORPORAT�R EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CIP NO. 17-01 Contractor: ACE Electric, Inc. Reason/Purpose for this Change Order:� In order for the contractor to continue with the work on Las Palmas Park, ACE Electric needed to coordinate a service shutdown with SDGE. The shutdown will provide ACE time to install the plugs required for the light poles installed on site. This change order includes SDGEs required fee for the service shutdown. CHANGE ORDER NO, 2 June 14, 2017 The City of National City and Contractor _. o__. __ change i l._ c :. tractor agree to the followingchan e to the original Contract: The City and the Contractor agree that the Contractor shall complete the work planned at Las Palmas Park within the duration of the scheduled shutdown. The Contractor shall complete the work within the approved construction schedule and will arrange the inspection to re -energize the site with the site Engineer. The agreed upon price for all cost associated with this work is a total of $1,158,00. Original Contract Amount ... $ Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days add-d: 0 Submr ted by: 712,569.00 5,253.46 717, 822.46 1,452.00 orking days subtracted: 0 Percent change in Contract to date 0.94% Project s ; r1.._� !Date Approved by: �... 2r6> City Ineer Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents 719,274.46 are incorporated herein. Accepted at ed to yAC eb Inc.: Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA «* o INCORPORATED EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CIP NO. 17-08 DATE: June 14, 2017 CHANGE ORDER NO. 2 WORK PERFORMED BY: ACE Electric, Inc. DESCRIPTION OF WORK: SDGE Shutdown Fee at Las Palmas Park CONSTRUCTION FEE Unit Qty Rate Total 1) 2) Shutdown fee Sales Tax LS EA 1.00 1.00 1,158.00 104.22 1,158.00 104.22 Sub -Total Materials: Materials Markup (15%): $ 1,262,22 $ 189.33 452.00 SUB TOTAL: 1,452.00 GRAND TOTAL: $1,452.00 Ace Electric, Inc. 6061 Fairmount Ave. San Diego, CA 92120 Phone:619.814.4761 Request for Change Order #'(92s) 5/10/2017 TO: Vinnie Aquelo Project Manager PPC 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Office 858.634.8180 JOB: 1878 Project: Las Palmas Park lighitnq improvement Change Order Number: 03 OTHER INFORMATION: WORK DESCRIPTION: SDGE Fees The total amount of this Change Order is: $1,452.00 for SDGE Fees. Price includes applicable fees and taxes with OH&P. Attached are the following supporting reports: • Extensions (Material Quantities, Prices and Labor Units with Extended Totals) • Summary Totals (recap sheet) • SDGE Notification Letter Sincerely, Eric Kliebenstein 6/7/2017 2:04:55 PM Material Non -Quoted Quotes Sales Tax (9.00%) Total Material Labor Direct (0.00 hours @ $72.86) Non -Productive Labor Total Labor (0.00 hours) Mr; Direct Job Expenses Tools and Miscellaneous Materials Subcontracts Job Subtotal (Prime Cost) Overhead (15.00%) Profit (0.00%) h Job Total Actual Bid Price Ace Electric, Inc. Las Palmas El Toyon Community Parks 1878 CO Totals (Summary) - Bid Summary: Default Page 1 $1,158.00 0.00 104.22 $1,262.22 $0.00 0.00 $0.00 $0.00 0.00 0.00 $1,262.22 189.33 0.00 $1,451.55 $1,452.00 6/7/2017 2:05:58 PM Ace Electric, Inc. Page 1 Las Palmas El Toyon Community Parks 1878 CO Job Number: 827152518 Partial Extension By Phase Item # Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr T0002 SDGE Fees for Las Palmas for June 9, 2017 1 1,158.00 E 1,158.00 OPEN 0.00 A SempraEnergy uumy" FILE NO. PLA 580 PROJ# 751005-010 June 7, 2017 Dear Mr. Goldhagenp, Subject: LAS PALMAS PRE -ARRANGED OUTAGE Location: 1900 E. 20th St. National City CA SDG&E has scheduled a crew to disconnect electric service at the above referenced location on June 9th, 2017. The outage will begin at approximately 8:OOAM and end at about 12:OOPM, if your work has been completed and SDG&E has received the necessary inspection clearances from the City of National City. The cost for performing the outage at that time is $1,158.00. Any change in schedule, or delay may result in additional charges. An inspection from the municipality on the work performed by your electrician will be required. If the work is scheduled to be performed during normal business hours, confirmation is required that the municipality inspector will be on -site at the time of the outage to release the inspection to SDG&E's New Service Section no later than 1 P.M. that same day. Service can not be re -energized without receiving an inspection release from the municipality. If the work is scheduled for non -business hours, and the inspector will not be on site, a Prearranged Outage Inspection Release may be submitted by 1 P.M., a minimum of one (1) working day prior to the scheduled outage. Customer shall indemnify, defend and hold harmless SDG&E from, and against, any and all liability of every kind and nature resulting from, or in any manner arising out of or in connection with, the performance of the work excepting only those liabilities arising from the sole negligence or willful misconduct of SDG&E or its agents compared to any other person. Customer shall indemnify, defend and hold SDG&E harmless from and against any and all liability arising out of, or in connection with, the violation or compliance with any local, state or federal environmental law or regulation as a result of pre-existing conditions at the job address. Customer agrees to accept full responsibility for, and bear all costs associated with, pre-existing environmental liability. Customer agrees that SDG&E may stop work, terminate the work, redesign or take other action reasonably necessary to complete the work without incurring any pre-existing environmental liability. Please complete the billing name and address with the customer signature and date at the close of the letter. Return the original letter with your check payable to SDG&E and the Customer Payment Remittance form. Please note that Project Management Offices are not able to accept payments. Please see the list of branch office locations for payment. PROJ#751005-010 2 June 7, 2017 Please reference the SDG&E project number on your check. In the interim, if you have any questions, please give me a call. Sincerely, Carmen Henry Customer Project Planner 858-636-3997 NOTE: Please list the name and address below of the party responsible for any additional billing or refunds. Billing Name Billing Address Customer Signature Date PCR Remittance Ver 1.0 Page 1 of 1 t SD CUSTOMER PAYMENT REMITTANCE Invoice/CR # 295013 Project # 751005 Date June 07, 2017 Preparer Dors, Debra Customer/Project Name: LAS PALMAS-PM SOUTH Project Location: 1900 E 20TH ST NC SDG&E Contact: Henry, Carmen Telephone: 858-636-3997dt PAYMENT DUE: $1,158.00 - Make checks payable to SDG&E - MAIL TO: Customer Payment Services - CP61C San Diego Gas & Electric PO Box 129831 San Diego, CA 92112-9831 THIS REMITTANCE MUST BE RETURNED WITH PAYMENT http://infoweb.sdge.com/departments/cac/cac_remittance.cfm 6/7/2017