HomeMy WebLinkAboutAce Electric Inc. - El Toyon and Las Palmas Park Lighting Improvements Project - Change Order No.3EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CIP NO. 17-01 Contractor: ACE Electric, Inc. CHANGE ORDER NO. 3 July 10, 2017 Reason/Purpose for this Change Order: There is a storage room located in Las Palmas park that requires additional circuit breakers to be installed. This is an unforeseen condition since the designers were not able to access the storage room initially. Once the work started, it was discovered that additional circuit breakers will be needed. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall install the additional circuit breakers at Las Palmas park. This change order includes all materials and appurtenances including (4) 20 amp 1-pole circuit breakers and (1) 20 amp 2-pole circuit breaker for the additional circuit breakers that will be installed. The agreed upon price for all cost associated with this work is a total of $340.00. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working day added: 0 Working days subtracted: 0 712,569.00 6,705.46 719,274.46 340.00 Percent change in Contract to date 0.99% 719,614.46 Sub We . 7 20 7 Prot Ma a er /l Dat Approve y: .... City ineer -,./'7/1? Date City Manager, required for Change Orders>$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agre to t ACf Electric, Inc.: Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL� C'jr, i'r --- INCORPORATED ' EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CIP NO. 17-08 DATE: July 10, 2017 CHANGE ORDER NO. 3 WORK PERFORMED BY: ACE Electric, Inc. DESCRIPTION OF WORK: Additional circuit breakers in Las Palmas Park CONSTRUCTION COST Unit Qty Rate Total 1) Shutdown fee LS 1.00 129.43 129.43 2) Labor installation HR 2.10 64.25 134.93 3) Sales Tax EA 1.00 11.33 11.33 4) Other job expense EA 1.00 16.00 16.00 Sub -Total Materials: $ 291.69 Materials Markup (15%): $ 43.75 Bond $ 4.36 SUB TOTAL: 340.00 GRAND TOTAL: $ 340.00 Ace Electric, Inc. 6061 Fairmount Ave. San Diego, CA 92120 Phone:619.814.4761 Request for Change Order #0 5/10/2017 TO: Vinnie Aquelo Project Manager PPC 4499 Ruffin Road, Suite 250 San Diego, CA 92123 Office 858.634.8180 JOB: 1878 Project: El Tovon and Las Palmas Park Lighting Improvement Change Order Number: 04 OTHER INFORMATION: WORK DESCRIPTION: Add Circuit Breakers to MSB at Las Palmas The total amount of this Change Order is: $340.00 for adding (4) 20amp 1 Pole Circuit Breakers and (1) 20amp 2Pole Circuit Breaker to the MSB. Price includes applicable Labor (per T&M Ticket) #7933 and taxes with OH&P. Attached are the following supporting reports: • Extensions (Material Quantities, Prices and Labor Units with Extended Totals) • Summary Totals (recap sheet) • Field T&M 7923 Reference Sincerely, Eric Kliebenstein 7/7/2017 11:08:56 AM Ace Electric, Inc. El Toyon Las Palmas 1878 CO Totals (Summary) - Bid Summary: Default Page 1 Material Non -Quoted $129.43 Quotes 0.00 Sales Tax (8.75%) 11.33 Total Material $140.76 Labor Direct (2.10 hours @ $64.25) $134.93 Non -Productive Labor 0.00 Total Labor (2.10 hours) $134.93 Direct Job Expenses $16.00 Tools and Miscellaneous Materials 0.00 Subcontracts 0.00 Job Subtotal (Prime Cost) $291.69 Overhead (15.00%) 43.75 Profit (0.00%) 0.00 Job Total $335.44 Bond 4.36 Job Total with Bond $339.80 Actual Bid Price $340.00 7/7/2017 11:11:10 AM Ace Electric, Inc. Page 1 El Toyon Las Palmas 1878 CO Job Number: 827152524 Extension By Phase Item # Description Quantity Price U Ext Price Labor Hr U Ext Lab Hr --- 03 Distribution --- 3960 20A 1P 120/240V Bolt -On Circuit Breaker 4 20.66 E 82.64 0.40 E 1.60 3969 20A 2P 120/240V Bolt -On Circuit Breaker 1 46.79 E 46.79 0.50 E 0.50 --- 03 Distribution Total -- 129.43 2.10 Job Total 129.43 2.10 Field Work Order No. ( 9 2 73 Customer: Job Name: Address: rJA-ri �PAL c-I-r-/ LAS PAL/14 S P.41Z,K Employee Name: ,JASopi 641)1446fr.) Job No: g3 Date: -7 - -7— 7 Job Status 0 In Progress Completed Ref #: Page # of Description of Work: it..) --rAtL AVDE"D gg-Katak--64 -ro t1 S 5 To FeED LoAi, 8-15.723-1-C ot-PD.60 gitiC4-1-c6Z5 77t) SP-We-I< &474, Feev e3r1.97-1 t%)6 1-0.41> (#eir-- ev-i Pc.tr-1,5) LABOR & EQUIPMENT Date Worker Class/Equipment Hours Date Worker Class/Equipment Hours Regular Overtime Regular Overtime 40 -Z9 ..TA Soi--1 &to14466J 1 e e-e3.4-4 .,II.S I MATERIAL & OTHER EXPENSES Matl No, Oty Material & Other Description Z foi,e zoAi-te -r--Ir .. BPI j," sterr triS &CT 01-1 ; ' ,- • q 1 PoLe Zc) A el P 7-1r0 "t3t" sietie',./.5 (50/-7" Tel (619)521-9740 Fax (619) 521-9742 By signature of this form. I certify that the above work was done and that the resources were consumed in the process. P.O. Box 601071 San Diego, CA 92160-1071 ACCOUNTING Certification of Work Performed: ustomer Si n ture Lic No. Date