DOC# 2017-0292100
11111111111111111111111111111111111111111411111111111111
Jun 28, 2017 11:04 AM
OFFICIAL RECORDS
Ernest J. Dronenburg, Jr.,
SAN DIEGO COUNTY RECORDER
FEES: $0.00
PAGES: 4
THIS SPACE FOR RECORDER'S USE ONLY
(Note: This document is recorded on behalf of the City of National City, a municipal corporation, and is exempt
from Recorder's fees pursuant to Government Code Section 27383)
NOTICE OF COMPLETION:
THE KIMBALL, EL TOYON AND KIMBALL SKATE PARK IMPROVEMENTS PROJECT,
CIP No. 15-04
THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION
(Additional recording fee applies)
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
NAME: CITY OF NATIONAL CITY
ADDRESS: 1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on March 2, 2017 of the Kimball, El Toyon and
Kimball Skate Park Improvements, CIP No. 15-04
Work of improvement or portion of work of improvement under construction or alteration.
Kimball Park bounded by 12th Street, D Avenue, A Avenue, 16th Street, Paradise Creek, and Kimball
Library, El Toyon Park located along the intersection of East 4th Street and South U Avenue in
National City, CA 91950
The undersigned owns the following interest or estate in said property:
Owner in fee
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
Western Rim Contractors, Inc.
Name of Original Contractor
The following work and material were supplied: Labor provided: general laborer. Materials:
concrete, masonry, asphalt, irrigation, landscaping, street lighting, and signing and striping.
Equipment: demolition, grading, paving and excavation equipment.
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Dated: March 2, 2017;
Joint tenants, tenants in common, or other owners
re of Owner
ity of National City, 1243 National City Blvd., National City, CA 91950
I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on Marc , ' 017 at, National City, California.
Signature:
0 MORRISON, MAYOR
Noe 15-04
RESOLUTION NO. 2017 — 80
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY WESTERN RIM
CONSTRUCTORS, INC., FOR THE KIMBALL PARK AND EL TOYON PARK
IMPROVEMENTS PROJECTS, APPROVING THE FINAL CONTRACT
AMOUNT OF $3,770,433.87, RATIFYING THE RELEASE OF RETENTION
IN THE AMOUNT OF $96,865.91, AND AUTHORIZING THE MAYOR
TO EXECUTE THE NOTICE OF COMPLETION FOR THE PROJECT
WHEREAS, the Engineering Department is satisfied that all work contracted to
be performed by Western Rim Constructors, Inc., for the Kimball Park and El Toyon Park
Improvements Projects has been completed.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
National City that the work performed by Western Rim Constructors, Inc., for the Kimball Park
and El Toyon Park Improvements Projects is accepted, the total final contract amount of
$3,770,433.87 is approved, the Mayor is authorized to execute the Notice of Completion, the
release of retention in the amount of $96,865.91 is ratified, and payment for said work is
ordered to be made in accordance with said contract.
PASSED and ADOPTED this 6th day of June, 201
Morrison, Mayor
ATTEST:
Mic ael R. Dalla, y Clerk
APPROVED AS TO FORM:
Passed and adopted by the Council of the City of National City, California, on June 6,
2017 by the following vote, to -wit:
Ayes: Councilmembers Cano, Mendivil, Morrison, Rios, Sotelo-Solis.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
City CIrk of the City of National City, California
By:
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2017-80 of the City of National City, California, passed and adopted
by the Council of said City on June 6, 2017.
City Clerk of the City of National City, California
By:
CITY OF NATIONAL CITY, CALIFORNIA
COUNCIL AGENDA STATEMENT
MEETING DATE: June 6, 2017
AGENDA ITEM NO. 12
.,wcM TITLE:
Resolution of the City Council of the City of National City: 1) accepting the work performed by Western
Rim Constructors, Inc. for the Kimball and El Toyon Park Improvements Project; 2) approving the final
contract amount of $3,770,433.87; 3) ratifying the release of retention in the amount of $96,865.91;
and 4) authorizing the Mayor to sign the Notice of Completion for the project.
PREPARED BY: Carla Hutchinson, Junior Engineer - Civil
PHONE: 619-336-4388
EXPLANATION:
See attached.
DEPARTMENT: Engineering/Public Works
APPROVED BY:
,ANCIAL STATEMENT:
ACCOUNT NO.
N/A
ENVIRONMENTAL REVIEW:
N/A
ORDINANCE: INTRODUCTION:
FINAL ADOPTION:
APPROVED:
APPROVED:
Finance
MIS
STAFF RECOMMENDATION:
Adopt Resolution accepting the work performed by Western Rim Constructors, Inc. for the Kimball and
El Toyon Park Improvements Project and approving the final contract amount of $3,770,433.87.
BOARD / COMMISSION RECOMMENDATION:
N/A
ATTACHMENTS:
1. Explanation
2. Notice of Completion
3. Final Contract Balance Report
4. Resolution
R�s0 ,v1‘ON No. 0.0%FA-$.0
EXPLANATION
The Kimball and El Toyon Park Improvements Project (CIP No. 15-04), included implementation
of storm water low -impact development measures, lighting, public safety cameras, ADA
upgrades, new restrooms, skate park, central plaza, benches, drought tolerant landscaping,
walking paths, and trash receptacles.
On June 23, 2015, the bid solicitation was posted on PlanetBids, a free public electronic bidding
system for contractors. On June 23, 2015, the bid solicitation was advertised in local
newspapers.
On August 5, 2015, two (2) bids were received electronically on PlanetBids by the 3:00 p.m.
deadline. Bid results were available immediately after the 3:00 p.m. deadline. Western Rim
Constructors, Inc. was the apparent lowest bidder with a total base bid amount of $2,716,331.98
as the basis of bid award.
Upon review of all documents submitted and reference checks, Western Rim Constructors,
Inc.'s bid was found to be responsive, and they were the lowest responsible bidder qualified to
perform the work as described in the project specifications.
On September 1, 2015, the City Council adopted Resolution No. 2015-136 awarding the
contract to Western Rim Constructors, Inc. in the amount of $3,452,342.98, which included a
combined base bid in the amount of $2,716,331.98, Kimball Skate Park Additive Bid in the
amount of $80,061.76, El Toyon Park Additive Bid in the amount of $529,164.36, and El Toyon
Park Additive Bid #2 in the amount of $126,784.88, and authorized a 15% contingency in the
amount of $517,851.45 for any unforeseen changes.
The following is a brief description of the base bids and additive bids:
1) Combined Base Bid: The Kimball Skate Park improvements included, a new 10,000 SF
concrete skate park within Kimball Park along the northern edge of Paradise Creek east
of the existing baseball fields, three public safety cameras, along with a proposed
bioretention basin to treat the run-off from the nearby parking lot, landscaping, a new
decomposed granite trail, and the installation of ten new light fixtures. Improvements to
Kimball Park also included constructing a new two -unit restroom adjacent to Kimball
Park tot -lot, and reconstruction of the central Kimball Park Plaza including a new 6-unit
restroom and team room facility, as well as the installation of 20 public safety cameras to
provide extensive coverage throughout the park.
2) Kimball Skate Park Additive Bid installed a new 15' tall black vinyl fence along the ball
field adjacent to the skate park, a new flag pole, three new ADA accessible picnic tables,
and two benches.
3) El Toyon Park Additive Bid installed two, 4-unit restroom buildings, 14 public safety
cameras to provide extensive coverage throughout the park, sidewalk improvements,
and landscaping.
4) El Toyon Park Additive Bid #2 included two steel motorized programmable double swing
gates including appurtenances, and new striping within east parking lot.
The Notice to Proceed with construction was issued on October 22, 2015, with a construction
start date of November 4, 2015.
The change orders issued for this project are detailed in the Final Contract Balance Report (see
attached). The change orders increased the contract by $311,341.70, and line item
adjustments increased the contract by $6,749.19, for a net increase of $318,090.89 to the
contract. This results in a 9% contract increase for a final contract balance of $3,770,433.87.
As a result of satisfactory completion of the project, staff recommends that City Council: 1)
accept the work of Western Rim Constructors, Inc. for Kimball and El Toyon Park Improvements
Project; 2) approve the final contract amount of $3,770,433.87; 3) ratify the release of retention
in the amount of $96,865.91; and 4) authorize the Mayor to sign the Notice of Completion for the
project.
The Notice of Completion will be filed with the San Diego County Recorder's Office.
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
NAME: CITY OF NATIONAL CITY
ADDRESS: 1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on March 2, 2017 of the Kimball, El Toyon and
Kimball Skate Park Improvements, CIP No. 15-04
Work of improvement or portion of work of improvement under construction or alteration.
Kimball Park bounded by 12th Street, D Avenue, A Avenue, 16th Street, Paradise Creek, and Kimball
Library, El Toyon Park located along the intersection of East 4th Street and South U Avenue in
National City, CA 91950
Street Address City State Zip Code
The undersigned owns the following interest or estate in said property:
Owner in fee
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
Western Rim Contractors, Inc.
Name of Original Contractor
The following work and material were supplied: Labor provided: general laborer. Materials:
concrete, masonry, asphalt, irrigation, landscaping, street lighting, and signing and striping.
Equipment: demolition, grading, paving and excavation equipment.
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Dated: March 2, 2017;
Joint tenants, tenants in common, or other owners
Signature of Owner
City of National City, 1243 National City Blvd., National City, CA 91950
I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on March 2, 2017 at, National City, California.
Signature:
RON MORRISON, MAYOR
Nac 15-04
-1-
FINAL CONTRACT BALANCE
DATE: April 03, 2017
PROJECT: Kimball, El Toyon and Kimball Skate Park Improvements
FY 15-16
Specification No. 15-04
TO:
Western Rim Constructors, Inc.
621 S. Andreasen Dr., Suite B
Escondido, CA 92029
ORIGINAL CONTRACT AMOUNT:
START DATE:
COMPLETION DATE:
ORIGINAL CONTRACT LENGTH:
EXTENTION OF WORK DAYS:
TOTAL CONTRACT TIME:
DESCRIPTION:
$3,452,342.98
November 4, 2015
March 1, 2017
170 Working Days
64 Working Days
234 Working Days
The Final Contract Balance reports final line item amounts and summarizes all change orders to produce
a final contract amount.
CHANGE ORDERS AND LINE ITEM ADJUSTMENTS:
Change Order #1R directed the contractor to remove existing Tight fixture at Las Palmas Park and replace
it to match the Skate Park lighting. This work included removing the existing light foundation, placing a
locking pull box directly over the existing footing and wires, placing a new foundation and new conduit
outside the existing fence and adjacent to the original foundation, and placing new light fixture to match
Kimball Skate Park lighting. This work was performed at an agreed upon price. This Change Order total
amount was $ 11,334.75.
Change Order #2 directed the contractor to design and manufacture, per art work supplied by the City,
fifteen (15) each 9" cast bronze medallions with mounting stud and provide twelve (12) each 10"
concrete core drills at locations marked by the City. Cores shall be left in place for future removal.
This work was performed at an agreed upon price. This Change Order total amount was $ 7,565.25.
Change Order #3 directed the contractor to remove and dispose of the existing 112 KVA NEMA 1
transformer in Kimball Park, to provide and install a new 150 KVA NEMA 3R transformer as replacement,
and to replace conduit as needed to adequately feed and supply the new electrical Toads with the
-2-
FINAL CONTRACT BALANCE
Kimball, El Toyon and Kimball Skate Park Improvements
Specification No. 15-04
Kimball Park Improvement Project. This work was performed at an agreed upon price. This Change
Order total amount was $14,860.65.
Change Order #4 directed the contractor to relocated multiple conduits in conflict with the new Kimball
Park Team Room building location and to replace existing wire due to incorrect sizing. This work was
completed on an agreed upon price. This Change Order total amount was $9,261.53.
Changer Order #5 directed the contractor to provide three (3) Standard Picnic Tables and three (3) ADA
Picnic Tables, as shown on the Additive Alternates plan. This work was part of the Additive Alternates
not previously awarded by the City. This work was performed at an agreed upon price, based on the
unit prices in the Additive Alternate Bid. This Change Order total amount was $9,788.70.
Change Order #6 directed the contractor to provide and install seven (7) additional pendant lights near
restrooms in Kimball Park, as shown on the Additive Alternates plan. This work was part of the Additive
Alternates not previously awarded by the City. This work was performed at an agreed upon price, based
on the unit prices in the contractor's Additive Alternate Bid. This Change Order total amount was
$51,131.92.
Change Order #7 directed the contractor to obtain a contractor licensed and registered to properly
remove and dispose of asbestos material identified in the El Toyon Restroom roof mastic prior to
demolition. This work was performed at an agreed upon price. This Change Order total amount was
$1,155.00.
Change Order #8 directed the contractor to delete a portion of electrical work related to camera
installation for security, including installation and system testing of 37 cameras and mounts. Contract
pay items for Bid Item #36: 20 each Install City Furnished Avigilon Camera with Appropriate Mounts at
Kimball Park, Bid Item #87: fourteen (14) each Install City Furnished Avigilon Camera with Appropriate
Mounts at El Toyon Park, Bid Item #145: three (3) each Install City Furnished Avigilon Camera with
Appropriate Mounts and Bid Item #148: one (1) lump sum Perform Testing and Verification of Security
Camera System at Kimball Skate Park were deleted from the contractor's scope of work. This Change
Order total amount was a deduction of ($24,857.97).
Change Order #9 directed the contractor to remove two (2) corroded and dangerous poles identified at
Las Palmas and secure existing electrical wires so the remaining lights and electrical system are safe.
This work was performed at an agreed upon price. This Change Order total amount was $5,250.00.
Change Order #10 directed the contractor to supply two (2) standard and two (2) ADA-accessible
temporary restrooms with sinks during construction of both El Toyon Restrooms. Restrooms are to be
services twice weekly for three (3) months. This work was performed at an agreed upon price. This
Change Order total amount was $4,510.94.
-3-
FINAL CONTRACT BALANCE
Kimball, El Toyon and Kimball Skate Park Improvements
Specification No. 15-04
Change Order #11 directed the contractor to relocate an existing 4" PVC mainline and irrigation wire
outside the construction limits of the Skate Park. This work was performed on a T&M basis. This
Change Order total amount was $17,750.69.
Change Order #12 directed the contractor to trace, identify and repair as needed multiple locations of
existing irrigation wire that was buried below grade without proper identification or splicing methods.
Work included repairing existing faulting connections, marking traced wire to three (3) separate
controllers and installing splice boxes as needed. This work was performed on a T&M basis. This
Change Order total amount was $16,551.97.
Change Order #13 directed the contractor to replace existing, deteriorated transformer at El Toyon Park
with a new 15 KVA transformer that meets current electrical and energy efficiency requirements. This
work was performed on a T&M basis. This Change Order total amount was $3,182.55.
Change Order #14 directed the contractor to furnish and install one (1) additional rules and guidelines
sign frame at Kimball Skate Park. This work was performed on a T&M basis. This Change Order total
amount was $1,989.55.
Change Order #15 directed the contractor to purchase and install five (5) commercial grade water
heaters, including necessary plumbing and electrical work. One water hears was installed at each of the
five (5) newly constructed buildings at Kimball and El Toyon Parks. This work was performed at an
agreed upon price. This Change Order total amount was $14,652.54.
Change Order #16 directed the contractor to remove the abandoned zoo electrical panel and foundation
and to switch the circuit to feed electrical lines to the irrigation controller and scoreboard at Kimball
Park. This work was performed on a T&M basis. This Change Order total amount was $1,468.95.
Change Order #17 directed the contractor to provide three (3) additional black trash receptacles to
match existing City facility for future installations by City staff. This work was performed at an agreed
upon price. This Change Order total amount was $4,254.08.
Change Order #18 directed the contractor to repair potential ADA concerns for safe paths of travel on
existing sidewalks and walkways with existing cracks, gaps and uneven surfaces between ADA ramps on
A Ave and the Plaza and Tot Lot sites. This work includes miscellaneous sidewalk removal and
replacement, and caulking. This work was performed at an agreed upon price. This Change Order total
amount was $7,497.00.
Change Order #19 directed the contractor to purchase, install, and connect six (6) veracity extenders
with corrosion resistant, stainless steel, lockable enclosures throughout Kimball Park, to increase
security and weather -resistance, and boost signal for the revised camera design. This work was
performed at an agreed upon price. This Change Order total amount was $20,021.40.
-4-
FINAL CONTRACT BALANCE
Kimball, El Toyon and Kimball Skate Park Improvements
Specification No. 15-04
Change Order #20 directed the contractor to bring existing facilities to community aesthetic standards
established by the new facilities and to prolong the useful life of existing City restroom facilities at A
Ave. in Kimball Park. This includes cleaning and repairing existing doors and door frames, providing two
(2) new gates/doors and mounting hardware, priming, painting and anti -graffiti coating all interior and
exterior surfaces. This work was performed at an agreed upon price. This Change Order total amount
was $23,677.50.
Change Order #21 directed the contractor to replace existing corroded wiring to meet current electrical
codes at El Toyon's newly constructed Sand Pit Restrooms building. This includes purchase and install
new #8 CU stranded wire, #4 stranded wire and two (2) 70A, 250V bolt on circuit breakers. This work
was performed at an agreed upon price. This Change Order total amount was $1,359.75.
Change Order #22 directed the contractor to increase erosion control and pedestrian safety near the
field at El Toyon Park by removing and disposing existing asphalt, grading and installing 425 LF of G-1
concrete curb at the toe of the slope, patching asphalt trench and back grade as needed. This work was
performed at an agreed upon price. This Change Order total amount was $19,253.00.
Change Order #23 directed the contractor to field design, layout and install an ADA-compliant
pedestrian crossing/speed table at El Toyon Park on U Ave. between the main park and field parking lot.
The ADA pedestrian crossing requires eight feet width, three foot wings, tactile domes, cleanout grate
and all necessary signage and striping. This work also includes widening the existing parking lot
driveway, connecting sidewalk between the restroom building and the crossing, and modifying the
existing sidewalk landing as needed. This work was performed at an agreed upon price. This Change
Order total amount was $35,829.00.
Change Order #24 directed the contractor to purchase, install and connect additional conduit, breakers
and multiple and double receptacle outlets in the utility rooms at the newly constructed Kimball and El
Toyon restrooms and the Kimball Team Room facility, as requested by city staff. Electrical outlets were
not called for on the original plans. This work was performed on a T&M basis. This Change Order total
amount was $3,457.65.
Change Order #25 directed the contractor to provide additional park lighting control and future conduit
for communications at El Toyon and Kimball Skate Parks. This work included 2" additional conduit,
locate the electrical feeder at El Toyon Park buildings, and redirect Skate Park lighting circuits. This work
was completed on a T&M basis. This Change Order total amount was $1,358.70.
Change Order #26 directed the contractor to repair existing cracks, remove and replace existing posts,
resurface, and restripe per USTA specifications the four existing tennis courts at El Toyon Park. This
work was performed at an agreed upon price. This Change Order total amount was $42,824.25.
Change Order #27 directed the contractor to repair potential ADA concerns for safe paths of travel on
existing sidewalk and walkways with existing cracks, gaps and uneven surfaces around the upper sand
-5-
FINAL CONTRACT BALANCE
Kimball, El Toyon and Kimball Skate Park Improvements
Specification No. 15-04
lot restroom at El Toyon Park. This work was completed on a T&M basis. This Change Order total
amount was $2,517.54.
Change Order #28 directed the contractor to repair existing irrigation valves, wires and lines in Kimball
Park that were either leaking, at inadequate elevations or not functioning correctly. This work was
completed on a T&M basis. This Change Order total amount was $3,694.81.
All Change Orders listed above increased the total contract amount by $311,341.70.
Numerous line item adjustments increased the total contract amount by $6,749.19.
CONTRACT ADJUSTMENT:
As a result of the above change orders and line item adjustments, the contract price is adjusted as
follows:
1. The final contract price is adjusted to $3,770,433.87.
a. As a result of the satisfactory completion of said project, a retention amount of
$96,865.91 is set for invoice processing and payment upon the receipt of signatures and
City Council's ratification of this agreement and the Notice of Completion.
This document and its purpose to balance payment shall be considered full compensation for furnishing
and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for
performing the work described above. Western Rim Contractors, Inc. will not be entitled to damages or
additional payment for delays as described in the 2012 edition of the Standard Specifications for Public
Works Construction, Section 6-6.3, for performing the work as described above.
-6-
RESOLUTION NO. 2017 —
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY WESTERN RIM
CONSTRUCTORS, INC., FOR THE KIMBALL PARK AND EL TOYON PARK
IMPROVEMENTS PROJECTS, APPROVING THE FINAL CONTRACT
AMOUNT OF $3,770,433.87, RATIFYING THE RELEASE OF RETENTION
IN THE AMOUNT OF $96,865.91, AND AUTHORIZING THE MAYOR
TO EXECUTE THE NOTICE OF COMPLETION FOR THE PROJECT
WHEREAS, the Engineering Department is satisfied that all work contracted to
be performed by Western Rim Constructors, Inc., for the Kimball Park and El Toyon Park
Improvements Projects has been completed.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
National City that the work performed by Western Rim Constructors, Inc., for the Kimball Park
and El Toyon Park Improvements Projects is accepted, the total final contract amount of
$3,770,433.87 is approved, the Mayor is authorized to execute the Notice of Completion, the
release of retention in the amount of $96,865.91 is ratified, and payment for said work is
ordered to be made in accordance with said contract.
PASSED and ADOPTED this 6th day of June, 2017.
Ron Morrison, Mayor
ATTEST:
Michael R. Dalla, City Clerk
APPROVED AS TO FORM:
Angil P. Morris -Jones
City Attorney
RESOLUTION NO. 2017 — 80
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
ACCEPTING THE WORK PERFORMED BY WESTERN RIM
CONSTRUCTORS, INC., FOR THE KIMBALL PARK AND EL TOYON PARK
IMPROVEMENTS PROJECTS, APPROVING THE FINAL CONTRACT
AMOUNT OF $3,770,433.87, RATIFYING THE RELEASE OF RETENTION
IN THE AMOUNT OF $96,865.91, AND AUTHORIZING THE MAYOR
TO EXECUTE THE NOTICE OF COMPLETION FOR THE PROJECT
WHEREAS, the Engineering Department is satisfied that all work contracted to
be performed by Western Rim Constructors, Inc., for the Kimball Park and El Toyon Park
Improvements Projects has been completed.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
National City that the work performed by Western Rim Constructors, Inc., for the Kimball Park
and El Toyon Park Improvements Projects is accepted, the total final contract amount of
$3,770,433.87 is approved, the Mayor is authorized to execute the Notice of Completion, the
release of retention in the amount of $96,865.91 is ratified, and payment for said work is
ordered to be made in accordance with said contract.
PASSED and ADOPTED this 6th day of June, 201
Morrison, Mayor
ATTEST:
Mic 'ael R. Dalla,'y Clerk
APPROVED AS TO FORM:
Passed and adopted by the Council of the City of National City, California, on June 6,
2017 by the following vote, to -wit:
Ayes: Councilmembers Cano, Mendivil, Morrison, Rios, Sotelo-Solis.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
By:
Mayor of the City of National City, California
MICHAEL R. DALLA
City Clerk of the City of National City, California
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2017-80 of the City of National City, California, passed and adopted
by the Council of said City on June 6, 2017.
By:
it (i
City CI rk of the City National City, California
Deputy
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO:
NAME: CITY OF NATIONAL CITY
ADDRESS: 1243 NATIONAL CITY BOULEVARD
NATIONAL CITY, CA 91950
NOTICE OF COMPLETION
CALIFORNIA CIVIL CODE SECTION 3093
NOTICE IS HEREBY GIVEN of the completion on March 2, 2017 of the Kimball, El Toyon and
Kimball Skate Park Improvements, CIP No. 15-04
Work of improvement or portion of work of improvement under construction or alteration.
Kimball Park bounded by 12th Street, D Avenue, A Avenue, 16th Street, Paradise Creek, and Kimball
Library, El Toyon Park located along the intersection of East 4th Street and South U Avenue in
National City, CA 91950
The undersigned owns the following interest or estate in said property:
Owner in fee
Nature of the interest or estate of owner (mortgagor, lessee, etc.)
Said work of improvement was performed on the property pursuant to a contract with
Western Rim Contractors, Inc.
Name of Original Contractor
The following work and material were supplied: Labor provided: general laborer. Materials:
concrete, masonry, asphalt, irrigation, landscaping, street lighting, and signing and striping.
Equipment: demolition, grading, paving and excavation equipment.
General statement of kind of labor, services, equipment or materials
The names and addresses of co -owners are: N/A
Dated: March 2, 2017;
Joint tenants, tenants in common, or other owners
re of Owner
ity of National City, 1243 National City Blvd., National City, CA 91950
I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents
thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing
is true and correct.
Executed on Marc , ' 017 at, National City, California.
Signature:
0 MORRISON, MAYOR
Noc 15-04