Loading...
HomeMy WebLinkAbout2017 CON MJC Construction - Storm Drain System Repairs CIP No 17-06 - Change Order #1-}-- CALIFORNIA NATIONAL C INCOAPORATED --- STORM DRAIN SYSTEM REPAIRS CIP NO. 17-06 Contractor: MJC Construction Reason/Purpose for this Change Order: This change order includes all labor, material, and equipement for the additional work performed for the replacement of storm drain pipe at Sweetwater Ave. and Grove St. The contractor discovered that the existing pipes is 18" x 24" corrugated oval rather than 12" circular. This resulted in a change of the specified pipe to be installed to an 18" corrugated HDPE pipe. The City also directed the contractor to replace the pipe from the existing lug to the inlet (resulting to the replacement of a larger length of pipe than the original scope). i CHANGE ORDER NO. 1 June 16, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the installation of the 18" HDPE circular pipe from the original area of work to the the inlet as directed by the Engineer. All work under this change order was done through a T&M basis. This agreed upon price for all cost associated with this work is a total of $8,309.70. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount 44, 001.00 44,001.00 8,309.70 Working da . ad • 0 Working days subtracted: 0 Percent change in Contract to date 18.89% Submiitad b Projec Approved by: II Date 7/ /7/7 Date City Manager, required for Change Orders>$24.999 Date 52, 310.70 By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed tby MJC Construction: 7-25 - 1 7... Name: Date Note to Cont - .: If y. . • not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 S / f CALIFORNIA -- NATIONAL CI iY aMV INCORPORATED STORM DRAIN SYSTEM REPAIRS CHANGE ORDER NO. 1 CIP NO. 17-06 DATE: June 16, 2017 WORK PERFORMED BY: MJC Construction T&M work for the changed condition at Sweetwater Ave. and Grove DESCRIPTION OF WORK: St. ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Wage Total 1) Foreman HRS 12.00 67.35 808.20 2) Operator HRS 12.00 68.81 825.72 3) Laborer HRS 24.00 50.88 4) Teamster HRS 8.00 54.58 1,221.12 436.64 5) Labor Burden EA 1.00 434.50 434.50 Sub -Total Labor: Labor Markup (10%): TOTAL LABOR: $ 3,726.18 $ 372.62 4,t?988 EQUIPMENT Unit Qty Rate Total 1) CAT 430 Backhoe HRS 8.00 49.07 392.56 2) Work Truck HRS 16.00 26.05 416.80 3) CAT 242B Skidsteer HRS 12.00 21.72 260.64 4) 49HP Air Compressor w/Air Hammer HRS 8.00 27.71 221.68 5) 6) 4 Axle Dump Truck Trench Plate 16' x 8' (delivery and pick up) HRS HRS 8.00 1.00 66.21 345.73 529.68 345.73 Sub -Total Equipment: Equipment Markup (10%): TOTAL EQUIPMENT: $ 2,167.09 $ 216.71 MATRI Unit Qty Rate Total 1) 2) 3) Slurry 18" HDPE Pipe 4000 psi Concrete (lugs) CY FT CY 10 40 3 90.00 11.15 105.00 900.00 446.00 315.00 Sub -Total Equipment: Equipment Markup (10%): TOTAL MATERIALS: $ 1,661.00 $ 166.10 7.1 GRAND TOTAL: $8,309.70