Reason/Purpose for this Change Order.
During a visual inspection of the existing RCP, several voids were noted in the grout between each RCP joint.
The City of National City and Contractor agree to the following change to the original Contract:
Contractor was directed to cement mortar all existing voids with the joints of approximately 120 LF of 72"
RCP. This work was performed on a T&M basis.
Original Contract Amount $ 55,000.00
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
55,000.00
1,413.91
New contract amount . . $ 56,413.91
Working days added: 0
Wo,�'king days subtracted: 0
Percent change in Contract to date 2.57%
• ted by:
Pro ect Mana er
Date
II
Ci
Project Manager
Date
roved by:
1
City rig ineer
Date
//
City Manager, required for Change Orders>$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly
negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and
labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the
price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor,
supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions
of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor)
Accepted and agreed to by (Contractor's name):
Name:
Fl///7
Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the
contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect
your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
Palm Engineering Construction Company, Inc.
Proposal Worksheet
Project No: 1701 Date Performed: 6/2/17 Date of Report: 6/7/17 C.C.O. No: Report No: 3519
Project Name: Emergency Stormwater Pipe Repair
1701-1
Description/Comments:
Laboror / Description
Hours
*Hourly
Rate
Extended
Amounts
Joint Patching per City
REG
OT
Avila-Casanora, Ismael - L1
REG
8
67.26
538.08
Materials/Equipment
Qty
Hours
Rate
Extended
Amounts
OT
87.45
Sopon, Welfido L1
REG
8
67.26
538.08
OT
87.45
-
REG
-
OT
-
REG
-
OT
-
Materials - Hub (Attached)
82.43
REG
-
OT
-
REG
-
OT
-
REG
-
-
OT
-
-
REG
-
OT
-
Total Materials & Equipment (B)
82.43
REG
OT
-
Subcontractor (C)
TOTAL LABOR
A
1,076.16
B
82.43
-
Total Subcontractor
C
-
Contractor's Representative's Signature
See Attached
Resident Engineer's Signature
Inspector's Signature (when applicable)
+ 20 % Markup on Labor Cost
+ 15 % Markup on Equip, Matrl, & Work
+ 10 % Markup on Subcontractor
SUBTOTAL
+ 2 % Bond & Liability Insurance
TOTAL Proposal
(A)
215.23
(B)
12.36
(C)
1,386.19
(D)
27.72
1,413.91
* Hourly Rate includes PR Overhead (PR Tax & W/C)
American Subcontractors Assoc. Su tier of the Year So. California - 2013, 2014, 2015 & 2016
• ---g:f 1UB 43 -
if
lGonOtuctbn cp¢dWue+, ine.1
c.Wrm.94,.. 60.d wrura.sp
iu
11
it
*DELIVERY* HUB - SAN DIEGO
SUITE A
National City, CA 91950
Phn:(619)409-7227 Fax:(619)409-7233 Mgr:Larry Clause
A PALM ENGINEERING CONSTR.
C 7330 OPPORTUNITY RD. #J
C SAN DIEGO CA 92111
T
J
0
CHARGE SALE
Page: 01
EMERGENCY STORMNVATER REPR
1432 EARLE DRIVE
National City CA 91950
Job Number
01701
Order
675954
Customer
015498
SLM
566
Ship Via
WILL CALL
Ship Date
6-02-17
Customer P.O
1701
Description
Qty Ord.
SKU
400521 7GAL MIXING TUB-PLAST 1
310075 5GAL PLASTIC PAIL NO/ 1
450010 RAPID SET GROUT 55 LB
3
BLUE & WHITE BAG SAYS "CEME
Time:08:24am
OTE: ALL CLAIMS FOR SHORTAGES MUST B
ALL RETURNS SUBJECT TO RESTOCKING
Print and Sign Name
Qty Backord
0
0
0
T ALL"
Qty Shipped
1
1
3
WT:165#
Tx?
Y
Y
Y
Unit Price
Purchased By
MIKE AVILLA
UOM Ext.Amount
6.95 EACH 6.95
4.35 EACH 4.35
21.50 EACH 64.50
TAX
8.750:
*TOTAL:
6.63
82.43
MADE AT TIME 0
HARGE
F
DELIVERY
For the latest product information, please refer to
manufacturer's website or contact the manufacturer directly.
Sale is subject to additional Terms and Conditions as stated at www.hubhasit.com
***Emergency Response / MSDS Information - Call (800) 535-5053*** Notice: Sale of Used Equipment or Material is made 'As Is'
Delivery/Transmittal Receipt
August 15, 2017
PALM ENGINEERING CONSTRUCTION COMPANY, INC.
7330 Opportunity Road, Suite J
San Diego , CA 92111
Phone: (619) 291-1495 I Fax: (619) 291-0482
selihu@san.rr.com.com or helen.palm@san.rr.com
To: City of National City
1243 National City Boulevard
National City, CA 91950
(951) 532-6483
Attention: SEAN GILL
Re:
Emergency Stormwater Pipe Repair
Job Number: 1702
We are sending you the following:
Attached
Under Separate Cover via:
Shop Drawings
Copy of Letter
Subcontracts
Prints
Change Order
Submittals
Plans
Samples
Specification
Reports:
Other: Charts
X
Pages
Date
Description
3
8/14/17
Change Order #1 - Wet Signature
1
8/14/17
Invoice Cover Sheet #2 - Wet Signature
1
8/14/17
Progress Billing #2
1
8/14/17
Customer Invoice #2 - Wet Signature
1
8/14/17
Invoice Cover Sheet #3 Retention - Wet Signature
1
8/14/17
Final Billing #3 Retention
1
8/14/17
Customer Invoice #3 Retention - Wet Signature
These are transmitted as checked below
For Approval
X For Your Use
As Requested
Approved as Submitted
Approved as Noted
Returned for Corrections
Resubmit copies for approval
Submit [#] copies for distribution
Return [#] corrected prints
For Review and Comment
For Signature
Revise and Resubmit/Work May Not Proceed
PRINTS RETURNED AFTER LOAN
Comments:
Delivered By:
Received By:
Date:
Picked Up
Signature & printed name of recipient
Date received