Loading...
HomeMy WebLinkAbout2017 CON Dick Miller Inc - Plaza Blvd Widening - "N" Ave to I-805 SP 16-01 - Change Orders #42 through #4840-, CALIFORNIA «.* NATIONAL CI17 tram INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 42 August 30, 2017 Reason/Purpose for this Change Order: The Holiday Inn entry sign had to be relocated to accommodate the new improvements. Under direction of the Engineer the Contractor proceeded under time and materials to relocate and rewire the Holiday Inn entry sign. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with relocating the Holiday Inn entry sign. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 134,457.81 2,028,955.91 861.50 Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount Working days added: 0 Submitted by: Approved by: ineer Working days subtracted: 0 $ 2,029,817.41 Percent change in Contract to date 7.14% th/, Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: VCA ame: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 \ CALIFORNIA NATIONAL Citify INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 CHANGE ORDER NO. 42 DATE: July 31, 2017 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Trench 11' to install 1' sch. 40 PVC & pullbox for Holiday Inn Sign ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR 1) C. Balderas 2) A. Cardenas Hour Hour 5,00 5.00 49.47 34.91 247.35 174.55 $ 421.90 Sub -Total Labor: Labor Burden (12%): Labor Markup (20%): TOTAL LABOR: $ 50.63 $ 84.38 $ 556.91 ATERIALS 1) California Electric Supply QUIPMENT 1) Tool Truck 2) Air Compressor Unit LS Qty 1.00 Rate 17.18 Total 17.18 $ 17.18 1.37 2.78 21.33 Unit Hour Hour Qty Rate 5.00 5.00 25.30 15.48 Total 126.50 77.40 S 203.90 5 30.59 SUBTOTAL: Prime Contractor Markup (5%): BOND AND INSURANCE (1%): $ 234.49 $ 812.73 $ 40.64 $ 8.13 GRAND TOTAL: $ 861.50 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): 5 TOTAL MATERIALS: SOLD TO: CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CHULA VISTA, CA 91911 T:619 427-2370 1:619 427-5416 T i M ELEC/DBA PERRY JOB 8696 PO BOX 710130 SANTEE, CA 92071 ACCOUNT NO. ICY-97994 JOB #696 PLAZA BLVD WIDENING ***DUPLICATE*** JOB NAME AND ADDRESS W/C CARLITO ***US -NAIL*** SHIP TO: INVOICE NO. INVOICE DATE 1069-733977 08/02/17 PLEASE SHOW INVOICE NO. AND REMIT TO: PO Box 847068 Los Angeles, CA 90084-7068 T S M ELEC/DBA PERRY 1011 BAY BLVD. CHULA VISTA, CA 91911 CUSTOMER ORDER NO. 696-CCO-977 SALESPERSON 1448 KH OUAAjTITY SHIPPING INFORMATION PREPAID SHIP VIA WILL CALL SHIP DATE OROEREO PROOUCT'COOE DESCRIPTION SNIPPE TY HIPPEp PRICE 07/31/17 4 PVC TA1 4 HAL 01910E 25 IDEAL 30454 100 IDEAL 30451 1 PVC 664BOX 8 PVC COUP1 1 PVC QUARTGLUE 0 (2`2 4l,arl TITLE AND RISK OF L088 OR b3 GE TO MERCHANDISE PASSES AT POINT OF SHIPMENT. CLAIMS FOR SHORT OR DARPOED MERCHANDISE SHOULD BE MADE TO CARRIER. MERCHANDISE RETURNED WITHOUT OUR CONSENT WILL NOT RE ACCEPTED. A REBTOGcm CX11RGM WILL RE 401DE ON RETURNED GOODS UNLESS DEYECTIVB OR THRO ERROR ON OUR PAR, A SERVICE CHARGE OF 1.54. PER MONTH, RUT NOT TO EMCEED TEX FIG EST AMOUNT LRWFtJLLY ALIGNED BY CONTRACT IN THIS STATE, WILL BE MADE ON ALL PAST DUE ACCOONTP. THIS was IS SO®JECT 1O OUR TERMS LOOTED AT TERM ADAPTER 1-IN DC LOCENUT S2 454 BLU WIRECONN QTY 25 BOX SZ 451 YEL WIRECONN QTY 100 BO) BOX -PVC COUPLING CEMENT 4 4 25 100 1 8 1 35.62 24.54 \\\ 453.36 M \ \\ 128.92 M -a�-8aPa=tn\a'.\ c _ c -'ul` o df O 1353.18 C r� 29.44 C _ Q, 742.25 C J-� l� S,ax 0(--\ 4n.rK EXTENSION 1.42 0.98 11.33 12.89 13.53 2.36 7.42 COOS: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, IBIS CODE I8 USED ON OUR INV0ICE8. B - RACK ORDERED. RILL SHIP A8 800N A8 RECEIVED UNLESS INSTRUCTED TO MERCHANOISE sµE$TU( 8.250 SHIPPING CHARGE 49.93 4.12 .00 NET PAYMENT I9 DUE BY THE 15TH OF THE MONTH FOLLOWING PURCHASE TOTAL 54.05 4" CALIPORNIA NATIONAL My anv INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 43 August 30, 2017 Reason/Purpose for this Change Order: During installation of conduit for the traffic signal modification on the Southwest corner of Palm Ave and Plaza Blvd an unforeseen abandoned SDGE vault was discovered. Under direction of the Engineer the Contractor proceeded under time and materials to break through the vault to install the conduit. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with breaking through the abandoned SDGE vault to install conduit for the traffic signal modification. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders Subtotal 135,319.31 2,029,817.41 Amount of this change order 1,032.29 New contract amount $ 2,030,849.70 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.20% Submitted by: Date Approved by: ,p/'/ Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed t b Dick Miller, Inc.: - 1/5/17 d Name: ato Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager Telephone (619) 336-4380 1243 National City Boulevard, National City, CA 91950 \ 1 CALIFORNIA NATIONAL C1i, ��Y INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification # 16-01 CHANGE ORDER NO. 43 DATE: April 12, 2017 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Break through old unforeseen vault to install new conduit ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit 1 R. Perry Hour 2) G. Grijalva Hour 3) L. Cuevas Rodriguez Hour MATERIALS 1) N/a 1) Tool Truck 2) Air Compressor Unit Qty 6.00 6.00 3.00 Wage 32.83 33.51 42.19 Sub -Total Labor: Labor Burden (12%): Labor Markup (20%): TOTAL LABOR: Qty Total 196.98 201.06 126.57 Rate Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: $ 524.61 $ 62.95 S 104.92 Total Hour 6.00 25.30 15.48 Sub -Total Equipment: Equipment Markup (150/0): Hour 6.00 Total 244.68 5 36.70 $ 692.48 TOTAL EQUIPMENT: $ 281.38 SUBTOTAL: $ 973.86 Prime Contractor Markup (50/0): $ 48.69 BOND AND INSURANCE (1%): $ 9.74 GRAND TOTAL: $1,032.29 CALIFORNIA -0- N TIONAL Cfl'V amv - INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 44 August 30, 2017 Reason/Purpose for this Change Order: During installation of type 1-A pole foundation on the Southeast corner of Palm Ave and Plaza Blvd an unforeseen old foundation was discovered. Under direction of the Engineer the Contractor proceeded under time and materials to break through the unforeseen foundation to get the required depth for the type 1-A pole foundation. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with breaking down the old foundation to get the required depth for the type 1-A pole foundation. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 136,351.60 Subtotal 2,030,849.70 Amount of this change order 865.92 New contract amount $ 2,031,715.62 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.24% Submitted by: Pr. ct Man .1 er Approved by: ngineer p/r4> Date City Manager, required for Change Orders>$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: e: VS-*// Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1248 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 // CALIFORNIA NATIONAL Cal Ianv NCORPORATED _• PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification # 16-01 CHANGE ORDER NO. 44 DATE: April 11, 2017 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Break through old unforeseen foundation to install new 1-A foundation ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT L. Cuevas Rodri.uez G. Grijalva Wage 42.19 33.51 Sub -Total Labor: Labor Burden (120/0): Labor Markup (200/0): MATERIALS Unit Qty 1) N/a Total 126.57 234.57 361.14 $ 43.34 $ 72.23 TOTAL LABOR: Rate Sub -Total Materials: Sales Tax (80/0): Materials Markup (15%): QUIPMENT Unit Qty 1) Tool Truck Hour 7.00 Total $ 476.71 TOTAL MATERIALS: Rate 25.30 Total 177.10 2) Air Compressor Hour 7.00 15.48 108.36 3) Jack Hammer Hour 7.00 1.48 10.36 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 295.82 $ 44.37 $ 340.19 SUBTOTAL: $ 816.90 Prime Contractor Markup (5%): $ 40.85 BOND AND INSURANCE (1%): $ 8.17 GRAND TOTAL: $ 865.92 +*- CALIFORNIA «(. NATIONAL clr fe v iscORPORATBD PLAZA BLVD WIDENING "N" AVENUE TO 1-805 CHANGE ORDER NO. 45 Specification No. 16-01 August 30, 2017 Contractor: Dick Miller, Inc. Reason/Purpose for this Change Order: Two 6T pull boxes were installed for future fiber HSIP 4 communications project. Under direction of the Engineer the Contractor proceeded under time and materials to install two 6T pull boxes. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with installing two 6T pull boxes for future fiber project. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 137,217.52 Subtotal 2,031,715.62 Amount of this change order 1,692.93 New contract amount $ 2,033,408.55 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.33% Submitted by: /5//4 Pr ct Man r Date Approved by: City ngineer 9117/-2 Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: ;I/ 7 Name: i te Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 1 1 / / �-< CALIFORNIA NOIONAL Cfl'yy re r:f —.. jNCORPORATEP PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification # 16-01 DATE: March 28, 2017 CHANGE ORDER NO. 45 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Perry Electric - Dig and set pull box for fiber ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT C. Balderas E. Schuler IIMILRIALS Hour Hour Qty 1.50 1.50 Wage Sub -Total Labor: Total 56.63 105.87 $ 162.50 Labor Burden (120/0): $ 19.50 Labor Markup (20%): S 32.50 TOTAL LABOR: 214.50 Unit Qty Rate Total 1 6T Box for Communications LS 2.00 525.00 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: 1,050.00 S 1,050.00 $ 84.00 170.10 EQUIPMENT 1) Tool Truck 2 Air Compressor Unit Hour Hour Qty 1.50 1.50 Rate 28.17 17.33 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: 68.26 SUBTOTAL: Prime Contractor Markup (5%): BOND AND INSURANCE (10/0): $ 1,304.10 $ 78.50 $ 1,597.10 $ 79.86 $ 15.97 GRAND TOTAL: $1,692.93 ♦**DIIPLIramx.*** CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CEUL,A VISTA, CA 91911 2:619 427-2370 F:619 427-5416 SOLO TO: T 6 M ELEC/DBA PERRY Po Box 710130 SANTEE, CA 92071 SHIP T0: INV0I0E N0. ' ' 1 INVOICE DATE 1069-713171 07/27/16 PLEASE SHOW INVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 T:858 451-7090 F'858 451-70q4 T 6 M ELEC/DBA PERRY CALL 24835 34 DEL. 619-394-2172 11521 W00DSIDE AVE SA.AITEE, CA 92071 2 2 T T •••US-MAEL*.* ACCOUNT NO. XY-92763 JOB 4600 - C.ALTHANS .IOB'NAMEANDADDRES$ CUSTOMER ORDER NO. 600-171 SALESPERSON SHIPPN4G INFORMATION SHIP VIA SHIP GATE 1446 30 PREPAID OUR TRUCK 1 06/29/16 ..nuwrmv. • pa.,7..9_� .: p..•.s, y- 5 ^i s:,, ,....- ' =aiNn'Tr• '���'•c4 1. y� Ti': . ::" .6`... .1:31t �: � -VJ ' 'I Y'}{y., •,:3 ,I O[f•OQ•3E•D .A,iw , l � : �5.�, ....rLi-" . •y. . .1 M1<,!,,. .�.R 1,-..'' 1 6 ..r., . �W6 • '.'} . SNF'PEO . PRICE..L• YI qS +�,-t.a,,,.,,�� i "1 �?fkcnl .y, )•.'u .J :_ IS ..1.. ....- •.:. h ` a.,. .- .r. ;ti?+.,..e. . i'7 ,.t:. .. cw,„4:Jiil�:5::'.. #9--AglATw.94- iaae?<z•. l^ %.ti:... .. �`� P",s.. ..• • 4 . 5T BOX 4 125.00 Y 500.00 X 4 . 5T LID 3RAF7SC SIQ 2. .4 235.00 2 - 940.00 X 13 . 6T BOX • 13 162.50 E 2,112.50 X 6T EXTENSION 7 87.50 E 612.50 X . 6T LID "CALTRANS CG'4T.LNICAIION" 12 275.00 E 3,300.00 X 1 . 6T LTD "CALTRANS TRAFFIC SICI. L' 1 275.00 E 275. 00 2', ''.°- ec' . . gn CC . _ 1 `c�...,Q • • X TI'II.t AND RSA OT I499 OR N+..rt ^b )¢acaa]mLL POSIES .AI pone @ CODE: TO ADO= TOO D3mmTLI COYSPXZ90 TDDR OAS, TRi9 COOL u USED MOOR MERCNNi05E 7740.00 "=NEWT. OLATS TOR SHORT CR DAMAGED HI.AaA.O1SE SROULD RE MEG TO ^"^" •TNypns, a -DICK ORDERED. WILL Sven As ROOK A9 RE ETLza v:.0 c - CANCELLEO NOT 111 IINNL UNABLE TO PDAOAOE Zra'tT. SACS TM B.000 A 619.20 aa TYSTDATO CANCEL. Caam N.ROA\VI E RETowoa NITNODT Oa» cONsri+r WLU. LOT BE ALt2rr102. A =SToamm or C ARDILL. RE MADE ON RITEUNT, GOODS UNLESS DEFECTIVE snwviN.. cNAw;- .00 OR TNRD'IDROA ON OUR PART. A .AV:OE CLARIS Or 1.51 PEA Mra.-:R, ROT NOT TO EXCEED TER RICHEST NET PAYMENT IS DUE BY THE 15TH OF AMOUNT H •a.,,... ALDONEO CET CONZVACT EL TUTS STA3, Nn.4 ME NODE ON Aiu XANT DUE AI.TDNTIE. THE NANTH FOLLOWING PURCHASE TOTAL DUE 8359.20 TE1S SALE TS EJECT TO ONCE TERNS LOCATED AT SALT.5.00A-TERMS.CON, Na1CR ,3 HAI CRANES FROM TILT: TO Tam WITHOUT PRIOR NOTICE. CALIFORNIA —e- e NATIONAL cfl cinv INCORPORoRpoR ATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 46 August 31, 2017 Reason/Purpose for this Change Order. During demolition for the cross gutter on the North side of Plaza Blvd at the Chinese Bistro and unforeseen conduit was hit and damaged. Under direction of the Engineer the Contractor proceeded under time and materials to install new conduit and pull new wire for the Chinese Bistro sign. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with installing new conduit and wire for the Chinese Bistro sign. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders Subtotal Amount of this change order 138,910.45 2,033,408.55 915.92 New contract amount . $ 2,034,324.47 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.38% Submitted by: ect Ma er Da 7 Approved by: City#Engineer ?lr/> Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Dick Miller, Inc.: /5(1 Dte Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 \ `�- CALIFORNIA NATIONAL CI 1 tY anvINCORPORATE) PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 DATE: July 29, 2016 CHANGE ORDER NO. 46 WORK PERFORMED BY: Perry Electric DESCRIPTION OF WORK: Install conduit and re -pull wire for Chinese Bistro Sign LABOR 1) Tim Peterson 2) 3) 4) ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Carlos Balderas Arturo Cardenas Angel Sandoval Hour Hour Hour Hour 3.00 3.00 3.00 Wage 43.05 37.99 30.99 26.89 Sub -Total Labor: Labor Burden (12%): Labor Markup (20%): 400.00 Total 129.15 113.97 92.97 80.67 $ 416.76 $ 50.01 $ 83.35 TOTAL LABOR: Rate 0.13 Sub -Total Materials: Materials Markup (15%): TOTAL MATERIALS: 52.00 $ 52.00 550.12 $ 7.80 EQUIPMENT 1) Tool Truck 2) Tool Truck 3) Air compressor Unit Qty Hour Hour Hour 3.00 3.00 3.00 Rate Total 28.17 84.51 28.17 84.51 17.33 51.99 Sub -Total Equipment: Equipment Markup (15%): TOTAL EQUIPMENT: $ 221.01 $ 33.15 SUBTOTAL: Prime Contractor Markup (5%): BOND AND INSURANCE (1%): $ 254.16 $ 864.08 $ 43.20 $ 8.64 GRAND TOTAL: $ 915.92 SOLD TO CALIFORNIA ELECTRIC SUPPLY - CHULA VISTA 1011 BAY BLVD. CXULA VISTA, CA 91911 T:619 427-2370 F:619 427-5416 T L M ELEC/DEA PERRY PO BOX 710130 SANTEE, CA 92071 ***DUPLICATE*** ***US -MAIL*** SHIP TO LIVDICE FD. I INVOICE DATE 1069-699809 10/15/15 PLEASE SHOW INVOICE NO. AND REMIT TO: P.O. BOX 509079 SAN DIEGO, CA 92150 1:858_451-7090 F:858 451-7094 T i M ELEC/DBA PERRY CED SAN DIEGO SAN DIEGO, CA 92123 ACCOUNTNO KY-92756 JOB #572 CARMEL VALLEY SALESPERSON 1448 LS OUPNTITY OPDEPED JOB NAME AND ADDRESS SHIPPING INFORMATION PREPAID SHIP VIA REM PICKUP I CUSTOMERORDERNO 572-96 SHIP DATE 09/18/15 ODONTITV PRODUCT CODE DESCRIPTION SHPPED PiNCE DISC EXTENSION CC 2000 WIRE THHN12STRRED WIRE 2000 120.90 M .-N, 2000 WIRE THHN12STRBLACK WIRE 2000 120.90 M 66 PVC TA3/4 TERM ADAPTER 66 24.00 C 66 PVC BELL END3/4 66 123.64 C 12 PVC BELL END1 PLASTIC 12 128.47 C 14 3M ITCSN040048 14 17.25 E WILL CALLED AT CED SD 7125-554653 241.80 X 241.80 X 15.84 X 81.60 X 15.42 X 241.50 X yC�C` x 3 V-1\(-0.6 ..No\coL‘ TITLE AND RISK OF L009 OR DAMAGE TO MERCHANDISE PASSES AT POINT OF SHIPMENT. CLAIMS FOP SHORT OR DAMAGED MERCHANDISE SHOULD BE MADE TO CARRIER. MERCHANDISE RETURNED WITHOUT 07R CONSENT WILL NOT BE ACCEPTED. A RESTOCKING CHANGE WILL BE MADE OB RETURNED GOODS UNLESS DEFECTIVE OR THRU ERROR OW OUR PANT. A SERVICE CHARGE OF 1.5. PER MONTH. BUT NOT TO EXCEED THE HIGHEST AMOUNT LAWFULLY ALLOWED BY CON1VACT IN THIS STATE. WILL BE MADE ON ALL PAST DOE ACCOUNTS. THIS SALE IS SUBJECT TO OUR TEEMS LOCATED AT 9ALES.00R-TERMS.C1T, MACH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. CODE: TO ADVISE YOU PROMPTLY CONCERNING YOUR ORDER, TN15 CODE. I5 USED ON OOP INVOICES. B - BACK ORDERED. WILL SNIP AS SOON AS RECEIVED UNLESS INSTRUCTED TO CANCEL. C - CANCELLED. NOT IN STOCK. INABLE TO PURCHASE LOCALLY. MEP.CMANOSE SAES TM 8.000 SHIPPING LMAP.GE 837.96 67.04 .00 NET PAYMENT IS DUE BY THE 15TH OF THE MONTH FOLLOWING PURCHASE TOTAL DUE 905.00 � NI4 �-» C LIF AL ao I INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 47 August 31, 2017 Reason/Purpose for this Change Order: During punchlist walk an existing wall at 1615 E. Plaza Blvd was discovered to be broken and potential of falling onto sidewalk. Under direction of the Engineer the Contractor proceeded under time and materials to repair the damaged wall. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with repairing the damaged wall at 1615 E. Plaza Blvd. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders 139,826.37 Subtotal 2,034,324.47 Amount of this change order 1,474.98 New contract amount $ 2,035,799.45 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.46% Submitted by: Man - ger Date Approved by: City ngineer 747/ ..) Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by k Miller, Inc.: e: /(52Do Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA NATIONAL Cifl INCORPORATED PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification #16-01 DATE: August 4, 2017 CHANGE ORDER NO. 47 WORK PERFORMED BY: DMI DESCRIPTION OF WORK: Repaired wall at 1615 E. Plaza Blvd ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT 1) Cement Mason Hour 4.00 58.68 234.72 2) Tender - Brick Hour 4.00 52.37 209.48 3) Cement Mason Hour 4.00 58.68 234.72 4) Foreman Hour 4.00 80.20 320.80 11 Misc. Materials Unit LS Sub -Total Labor: Labor Markup (20%): $ 199.94 TOTAL LABOR: Qty 1.00 Rate 24.79 Total 24.79 Sub -Total Materials: Sales Tax (8%): Materials Markup (15%): TOTAL MATERIALS: $ 1.92 $ 4.01 $ 30.72 EQUIPMENT Unit Qty Rate Total 1) Crew & utility truck with tools (Ai Hour 4.00 50.00 Sub -Total Equipment: Equipment Markup (15%): 200.00 200.00 $ 30.00 TOTAL EQUIPMENT: SUBTOTAL: BOND AND INSURANCE (1%): 230.00 GRAND TOTAL: $ 1,460.38 14.60 $1,474.98 $ 999.72 $ 24.79 More saving. More doing." 1475 E VALLEY PARKWAY ESCONDIDO, CA 92027,(760)233-i285 1053, 00001 34239 08/04/17 06:08 AM CASHIER RAMONA 748727000025 GREY STUCCO <A> 13.90 90LB GRAY 200 EXT STUCCO COLOR COAT 0000-925-564 8X8X8 BLOCK <A> 8'X8'X8 CONCRETE HW HALF BLOCK 3.87 0000-938-076 8X8X16BLOCK <A> 8"X8"X16" CONCRETE.HW BLOCK 3$1.29 3.87 0000-619-280 6X8X16 BLOCK <A> 6"X8"X16" CONCRETE HW BLOCK 3®1.05 3.15 SUBTOTAL 24.79 SALES TAX 1.92 TOTAL $26.71 XXXXXXXXXXXX6811 HOME DEPOT 26.71 AUTH CODE 004225/7012644 TA PRO XTRA MEMBER STATEMENT PRO XTRA I1#!U-lIIUl-4411 SUMMARY THIS RECEIPT PO/JOB NAME: PLAZA PRO XTRA'SPEND THIS VISIT: $24.79 2017 PRO XTRA SPEND 08/03: $15,558.78 As of 08/04/2017 your Paint Rewards level is Pro Xtra Paint Rewards; Spend 1825.55 more in qualifying paint purchases to earn Bronze, (10.0% off) on select paint items. This purchase qualifies for FUEL DISCOUNTS and 60 DAYS TO PAY on The Homo Depot Commercial Credit Card. Ask an Associate to learn more or go to homedepot.com/flnanceoptions. I 11 111II1IIDIIllhL 11111 1111 111 11 1053 01 34239 08/04/2017 7291 RETURN POLICY DEFINITIONS A POLI1 CY ID 3DAYS POLICCYoEXPIIREES ON 54/2 TIIE HOME DEPOT RESERVES THE RIGHT TO LIMIT./ DENY RETURNS. PLEASE SEE THE RETURN POLICY SIGN IN STORES FOR DETAILS. 40— CALIFORNIA NATIONAL C MCORPao ORATV) PLAZA BLVD WIDENING "N" AVENUE TO 1-805 Specification No. 16-01 Contractor: Dick Miller, Inc. CHANGE ORDER NO. 48 August 31, 2017 Reason/Purpose for this Change Order: New pedestrian handrails were installed throughout the project but did not meet current ADA standards without an edge barrier per section 405.9. Under direction of the Engineer the Contractor proceeded under time and materials to add a kickplate to the new railing. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with adding kickplates to the new pedestrian handrails installed throughout project. The agreed upon price for all costs associated with this work is as stated on this Change Order. See Attachments for cost breakdown. Original Contract Amount $ 1,894,498.10 Net change by previously authorized Change Orders Subtotal 141,301.35 2,035,799.45 Amount of this change order 2,486.87 New contract amount $ 2,038,286.32 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.59% Submitted by: Proj 1 Manag Date Approved by: .,--2 Ci . City Manager, required for Change Orders >s24,9ss Date ngineer Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to by Digk,Miller,, Inc.: Name; 1//./17 Date Note to Contractor. If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4386 CALIFORNIA NATIONAL CITY avy zscoRpoRATED PLAZA BLVD WIDENING "N" AVENUE TO I-805 Specification # 16-01 DATE: August 4, 2017 CHANGE ORDER NO. 48 WORK PERFORMED BY: DMI DESCRIPTION OF WORK: Add 67 LF of kick plates to new railings ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT SUBCONTRACTOR Unit Qty Rate Total 1) Scott Fence COR LS 1.00 2,345.00 2,345.00 67 LF of kick plate at $35/LF $ 2,345.00 Sub -total Subcontractor: Prime Contractor Markup (5%): TOTAL SUBCONTRACTOR: $ 117.25 SUBTOTAL: BOND AND INSURANCE (1%): GRAND TOTAL: $ 2,462.25 $ 2,462.25 $ 24.62 $2,486.87