Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A Good Sign and Graphics CO - Wayfinding Signage Project CIP No. 16-13 - Change Order Nos. 3-6 - 2017
WAYFINDING SIGNAGE PROJECT CIP NO. 16- 13 A Good Sign, Inc. CAL{FIRMANik____,TIONAL OTT CHANGE ORDER NO. 3 September 18, 2017 Reason/Purpose for this Change Order: After additional assesment of the current wayfinding signage project, the planner suggested that a few supplemental signs should be added. These signs will be added as a part of the wayfinding program currently under construction. The City of National City and Contractor agree to the following change to the original Contract The City and the Contractor agree that the Contractor shall proceed with the installation of the five (5) directional signage in National City as shown in exhibit A. Additional (14) days will need to be added in order to complete the fabrication and installation of these signs. The agreed upon price for all cost associated with the additional working days is $10,474.62. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount... 270, 359.00 16,441.03 286,800.03 1 0,4 7.012 Working days added: 14 Working days subtracted: 0 Percent change in Contract to date 9.96% Subm- d b Project Ma :.0 Approved by: cf. IS. eel 7 Date 297,274.65 ngineer Date C" Mana er, required fo r Change Orders >S24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. AD of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed t A9ood Sjgn, Inc.: ,,P.A/ Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 0—, CALIFORNIA , NUONIAL Cfl' cry WAYFINDING SIGNAGE PROJECT CIP NO. 16-03 1 INCORPORATED • DATE: September 18, 2017 WORK PERFORMED BY: A Good Sign, Inc. CHANGE ORDER NO. 3 DESCRIPTION OF WORK: Additional installation of (5) five directional signage ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Sign Installers Unit HRS Qty 28.00 Wage 84.35 Total 2,361.80 $ 2,361.80 Sub -Total Labor: Labor Markup (15%): TOTAL LABOR: $ 354.27 MATERIALS Unit Qty Rate Total 1) Additional Signs with Brackets EA 5.00 1,303.00 6,515.00 Sub -Total Materials: Materials Markup (15%): $ 6,515.00 $ 977.25 TOTAL MATERIALS: 7,492.25 Bonding (3%) $ 266.30 GRAND TOTAL: $10,474.62 eir Aerial 1116111 Sign Location Mounting Pole Sign Type: Directional Installation Type: Street Light Mounted Orientation: Facing North (Southbound Movement) Intersection: National City Blvd. between 6th & 7th St. Sign Content Destinations Direction City Hall Straight Kimball Park Straight Historic _Downtown Left SW College Straight Sign Content Exhibit 2 KTU+A. Planning.+ Landscape Architecture 3916 Normal Street, San Diego CA 92103 tel 619.294.4477 : + www ktua.corn August 31, 2017 5:43 PM ktu Aerial Sign Location Mounting Pole Sign Type: Installation Type: Orientation: Intersection: Directional Street Light Mounted Facing West (Eastbound Movement) Roosevelt Ave. & 8th St. Sign Content Destinations Direction City Hall Right Historic Downtown Straight Kimball Park Right SW College Right Sign Content Exhibit KTU+A Planning + Landscape Architecture 3916 Normal. Street, San Diego CA 92103 te1619.294.4477 + www.ktua.com • AuF.gui.;; ktu PLEASE SEE NEXT PAGE FOR LOCATION IMAGES i Sign Location Sign Type: Installation Type: Orientation: Intersection: Directional Street Light Mounted Facing North (Southbound Movement) National City Blvd. & 12th St. Sign Content Destinations Direction City Hall Left Kimball Park Straight Library Straight Mile of Cars Straight Sign Content Exhibit KTU+A Planning + Landscape Architecture 3916 Normal. Street, San Diego CA 92103 tel 619.294.4477 + www.ktua.com August 31, 2017 5:43 PM ktu Wayfinding Signage Project City of National City Sign Relocation for Supplemental Sign at Civic Center Dr. and National City Blvd. SATELLITE VIEW STREET VIEW 12th Street Lofts 0 Install Sign at Existing Light Pole Maaco Collision Repair & Auto Painting 0 Nations©ity Police Department Install Sign at Existing Light Pole Enters rif Bent A Car NOTES: Please follow the Sign Content provided on page 4 of 6 0 National City Engineering Department Aerial i Sign Location Mounting Pole Sign Type: Installation Type: Orientation: Intersection: Directional Street Light Mounted Facing South (Northbound Movement) National City Blvd. & Civic Center Dr. Sign Content Destinations Direction City Hall Right Kimball Park Right. SW College Straight Transit Center Straight Sign Content Exhibit KTU+A. Planning.+ Landscape Architecture 3916 Normal Street, San Diego CA 92103 tel 619.294.4477 + www.ktua.com August 31, 2017 5:43 PM ktu PLEASE SEE NEXT PAGE FOR LOCATION IMAGES aimin Sign Location Sign Type: Installation Type: Orientation: Intersection: Directional Street Light Mounted Facing West (Eastbound Movement) National City Blvd. & Civic Center Dr. Sign Content Destinations Direction City Hall Left Library Right Mile of Cars _ Right SW College Left Sign Content Exhibit KTU+A Planning.+ Landscape Architecture 3916 Normal Street, San Diego CA 92103 tel 619.294.4477 + wwwktua.com August 31, 2017 5:43 PM ktu Wayfinding Signage Project City of National City Sign Relocation for Supplemental Sign at Civic Center Dr. and National City Blvd. SATELLITE VIEW Install Sign at Existing Light Pole 0 Los Chipotles Mexican Food SOUND SOLUTIONS 0 STREET VIEW Install Sign at Existing Light Pole NOTES: Please follow the Sign Content provided on page 6 of 6 WAYFINDING SIGNAGE PROJECT CIP NO. 16- 13 A Good Sign, Inc. Reason/Purpose for this Change Order: During the shop visit with the architect and designer, it was determined that the method for the lettering on the neighborhood gateway signs shall be modified from plant on letters to push through letters. CHANGE ORDER NO. 4 September 18, 2017 The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall proceed with the modification for fabricating the neighborhood gateway signs. The contractor shall install the letterings of the signs using a push through method instead of a plant on method as directed by the designer and the architect. The agreed upon price for all cost associated is $1,062.00. Original Contract Amount $ 270,359.00 Net change by previously authorized Change Orders..... .. Subtotal... 26,915.65 297,274.65 Amount of this change order 1,062.00 New contract amount...... $ 298,336.65 Working days added: 0 Working days subtracted: 0 Percent change In Contract to date 10.35% Subm ed y: Project er Approved by: 4. IS. 20'7 Date Ci 'tn9ineer / Date City Mana 'er, required for change orders >S24999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to A ood Sign, Inc.: — .. ..).1;7!'9/7 Name: Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract - and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 CALIFORNIA-ti`. CIr,r' Nffi\TI0Nt_---------- INCORPORATED WAYFINDING SIGNAGE PROJECT CIP NO. 16-03 CHANGE ORDER NO. 4 DATE: September 18, 2017 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Modification of lettering method for Neighborhood Gateway Signs ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Face change for Neighborhood Gateway lettering LS 900.00 Sub -Total Materials: Materials Markup (15%): 900.00 900.00 $ 135.00 TOTAL MATERIALS: Bonding (3%) 27.00 GRAND TOTAL: $1,062.00 WAYFINDING SIGNAGE PROJECT CIP NO. 16- 13 A Good Sign, Inc. cdziNepapoRAVED CHANGE ORDER NO. 5 September 18, 2017 Reason/Purpose for this Change Order: Due to some issues in digging for the foundations of three signs, the contractor had to modify the engineering specified in the specification. The Contractor has requested for new calculations to accommodate for the new install. Three directional pole mounted signs located in the Marina district area required a change in their installation method. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall install the three (3) directional signs located in Marina district with the foundation modifications as approved by the engineer/architect. ExhibitA shows the location of the three (3) signs where the foundations needed to be changed. The agreed upon price for all cost associated is $2,920.03. Original Contract Amount $ 270,359.00 Net change by previously authorized Change Orders 27,977.65 Subtotal.. Amount of this change order New contract amount $ 301,256.68 298,336.65 2,920.03 Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 11.43% Sub ed Proje t jer G1. ti3. Zol Date Approved by: City n ineer ..., Date Ci? Mana - er, required for change orders >$24.999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepfed and agreed to od Sin, Inc.: . • Name: Date Note to Contractor. If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 /7 Telephone (619) 336-4380 CALIFORNIA NK.U.0NAL Cflry 5,1 &,h), CORPORATEv •--J WAYFINDING SIGNAGE PROJECT CHANGE ORDER NO. 5 CIP NO. 16-03 DATE: September 18, 2017 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Modification of the foundation/footings for 3 Marina district signs ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT Unit Qty Rate Total 1) Engineering change due to unforseen conditions on site - additional digging Directional Sign 55B, 56A, 56B additional footing materials HR 16.00 84.35 1,349.60 Sub -Total Labor: $ 1,349.60 Labor Markup (15%): $ 202.44 TOTAL MATERIALS: $ 1,552.04 1 1,125.00 Sub -Total Materials: Materials Markup (15%): Total 1,125.00 $ 1,125.00 $ 168.75 TOTAL MATERIALS: Bonding (3%) 74.24 GRAND TOTAL: $2,920.03 WAYFVNDING SIGNAGE PROJECT CIP NO. 16- l3 A Good Sign, Inc. CHANGE ORDER NO. 6 September 18, 2017 �Reason/Purpose for this Change Order. A neighborhood gateway sign located at the South Westem sector of the Bay Marina Dr. and Manna Way intersection needed to be shifted as requested by the Pier 32 owner. This shift is to avoid blocking the Pier 32 sign currently placed in the same area. Due to this shift of location, the Contractor required an additional day of work for installing the sign. The City of National City and Contractor agree to the following change to the original Contract: The City and the Contractor agree that the Contractor shall install the neighborhood gateway sign as per the agreed change of location. The agreed upon price for all cost associated is $1,592.53. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order New contract amount. Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 12.02% Submittby: r Preect Man Approved by: Cit n ineer 270, 359.00 30,903.68 301,262.68 1,5 9.8 3 $ 302,855.21 1 Date ,City Ma n a,: er, required for Change Orden >S24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. Accepted and agreed to bwA Good Sigh,' Inc.: Name: :.. Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 - CALIFORNIA NATI.O.NAL__, (miry NCORPORATE WAYFINDING SIGNAGE PROJECT CHANGE ORDER NO. 6 CIP NO. 16-03 DATE: September 18, 2017 WORK PERFORMED BY: A Good Sign, Inc. DESCRIPTION OF WORK: Shift in the location of Neighborhood Gateway Sign ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT LABOR Unit Qty Rate Total 1) Additional hours worked for shifting the sign adjacent to the original location HR 16.00 84.35 1,349.60 Sub -Total Labor: Labor Markup (15%): TOTAL MATERIALS: S 1,349.60 $ 202.44 $ 1,552.04 Bonding (3%) 40.49 GRAND TOTAL: $1,592.53 XfL 'T A - 14NAGX UXAI"BN Cloi•ANAC Proposed wayfinding signage will block the Pier 32 signage. Pier 32 owner has requested to shift wayfinding signage to the left. Existing sign may need to be shifted. Please move the sign to make room for installation. The two flags show the new placement of holes as per requirement of PIER 32 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk A GOOD SIGN, INC. Change Orders #3 through #6 Wayfinding Signage Project CIP No. 16-03 Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Orders to A Good Sign, Inc.