Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2017 CON Pavement Coatings - 18th Street Bicycle Enhancements, CIP No. 16-04 - Change Orders #1 and #2
CALIFORNIA so" NATIONAL CITY !:: 'f - INCORPOEATED 18th St. Bicycle Enhancements Project CIP No: 16-04 Contractor: Pavement Coatings Co. Reason/Purpose for this Change Order: Revisions to the striping plans to modify existing crosswalks and pedestrian barricades. CHANGE ORDER NO. 1 September 28, 2017 rThe City of National City and Contractor agree to the following change to the original Contract: The city requested the contractor to provide an additional continental crosswalk at the intersection of 18th and N Ave. and provide additional pedestrian barricades and crosswalk signage per the revised plans attached. All work will be performed at the agreed price listed below. Original Contract Amount $ 228,391.40 Net change by previously authorized Change Orders Subtotal 228,391.40 Amount of this change order 5,823.66 New contract amount $ 234,215.06 Working days added: 5 Wor g days subtracted: 0 Percent change in Contract to date 2.55% .. • Stibi a1tted by: /0-3- Protect M nager Date A roved by: City Protect Manager Date Cit ngineer Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (Contractor's name): j .. fcwQfr%eJo. Name: Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 The Road To Smart Solutions Pavement Coatings Co. An Employee Owned Company OTHERS TALK SAFETY, WE LIVE IT! (EMR 0.47) Proposal and Contract Pavement Coatings Co. DIR# 1000003382 CA License# 303609 Type A, C32 From: Steve Pierce Riverside: 10240 San Sevaine Way, Jurupa Valley, CA 91752 Sacramento: 2290 E Main St, Woodland, CA 95776 Phone: (714) 826-3011 Fax: (714) 826-3129 Email: stevepierce@pavementcoatings.com To: Jessica Chin ICCS P.O. Box 6211 Norco, Ca. 92860 jchin@iccsinc.net Quote No: Phone: Fax: Bid Date: 1705814 (951) 532-6483 ( ) - 4/21/2017 We propose to furnish you with labor and material per your representation of job requirements as follows: National City-18th St., Striping Changes Item No Description Quantity UOM Unit Price Total Price Extra Work 1 Layout & Install Thermoplastic Markings, Pedestrian Barricades And Signs Per Revised Plan Sheet 1 & 5 Of 7 Delta 1 Dated 02/15 1 LS 5,823.660 $5,823.66 General Conditions Terms: Net 30 days. Any indemnity and defense obligation required from PCC shall be proportional and limited to the extent PCC's acts, ommisions, fault, or negligence contribute to any alleged or actual claims or damages. Insurance included in this Bid: Commercial Liability Si MM per occurance / $2MM aggregate; $2MM Products and Completed Operations Aggregate; S'IMM Personal and Advertising Injury S1 MM Commercial Auto; Worker's Compensation coverage per statute. Date: Accepted By: Page 1 of 1 From: Steve Pierce www.pavementrecycling corn F 5 _ o i 4.4 m KE a 3 30 NFTWORKS, RFTFR MAT. O 0OR INCOAPOAA?LED C3ErERAL NOTES APPROVAL Cr 1NESE RMIS BY 11# CITY DOWER O THE CITY Cr NA110NA1 att DOES NOT CNSIITUIE CERi6CATON OF TIE PROJECT AS A MOLE, N TEAMS OF COMR.c .1055, ACCURACY, DESIGN, AD CONSTNICTON STANDS. IT IS I E RESPa19911TY OF THE FRC:NEER-OF-WORK TO EXERCISE CONTROL OVER THE DESIGN OF THE PROJECT. 1. A PERMIT SHALL BE ...CD fROI NE ENGINRTNG DEPARNENT fOR ALL RPROWIENT MILK MINI/ THE PUBLIC RIGHT -OR -WAY AND ALL GRADING OPERATIONS COI PRIVATE PROPERTY 2 APPROVAL OF THESE PUNS BYTE att OF NATIONAL CITY DC. NOT AUNORIff ANY WORK OR GRADING TO BE PERFORMED UNA A VALD PERM. HAS BEEN ISSUED. 1 R01M1HS78p1G THE MNNA STANDARDS SET FORTH N THE GRADING ORDINANCE ND NOIMTSTADNG .11E APPROVAL OF THESE PLANS, NE CHIT ACTOR S RESPONSIBLE FOR 1E PREVENTION O DAMAGE TO 711E ADJACENT PROPERTY. NO PERSON SHALL EXCAVATE N UM 9) CLOSE TO THE PROPERTY LP(AS TO ENDANGER ANY ADJOMMG PUBLIC STREET, SIEINK AU.AU.OR PAY OMER PUBLIC OR PRIVATE E PROPERTY WMOUT SUPPORTING AND PROTECTING SUCH PROPERTY FROM SETTING GRADING ERO90NL ATAIG SCOUR OR THE DAMAGE INCH 881T RESAT FROM TIE GRADING DESCREEO N THESE PUNS 4. 711E CONTRACTOR SMALL PREY ITE EDSIENCE AND LOCATION O ALL UINUTES BEFORE COYEENONG MAN, NOTICE O PROPOSED WORK W. BE CI. TO THE FOLLOW*. AGENCIES UNDERGROUND SERVICE ALERT 1-800-227-2603 OR 8-1-1 ANSI (619) 57h2810 CITY O NATIONAL OTT PUBLIC WORKS DEPARTMENT (619) 336-4580 COX COMNICATNS (619) 266-5438 GROWN CASTE (626) 320-0996 SAS' DEGO GAS AM ELECTRIC (858) 636-5716 SAEEPNA. AU mown' (619) 409-6756 s. IT SHALL BE DE RESPNSE9NY OF THE CNTRACTN TO LOCATE ALL SUBSTRUCTURES WEINER WON N NOT ANO PROTECT THEM OW DAMAGE. DE UPONSE O REP. OR REPU.ENT OF SAD ...CARES SNAIL BE BONE BY DALE CONTR... 6. 711E ENGINEER-O-NON STALL BE NODFTED MIEN CONSTRUCTION WYIENOS AND ANY CHANGE OR R OPALS MALE DIRNG THE PROGRESS O CONSTRUCTION SHALL E APPROVED BY E.O.W. A REPORT .FIRMING MS SIGNED BY DE REGISTERED SCRS ENGINEER, STALL BE SUBM'.ED TO AC CITY'S ENONEERNG DEPARWIT AT THE COME. O THE ORADPIG 7. THE CONTRACTOR SHALL BE RESPONSMEE fOR PROTECTING ANY MENU EITATN AND/OR BENCHMARKS. ANY MNUYENTATDN AND/OR ENOMARI(5 RAM ARE DISTURBED OR DESTROYED BY CONSTRUCTION SHALL BE RNI PIALPD AT THE CRAC.EDPENSE SUCH PORTS SHALL BE REPLACED MAPPROPRIATE MONO E TATHN BY A LICE 70* NS D LAND SURVEYOR OR A REM.. CORE ENGINEER AUTHORIZED TO PRACTICE LAND SUMAC. A CONKER ECOM OR RECORD O SURVEY, AS APROITATE SHALL E FEED BY ME UCONSED LAND SIRAEYOR OR REDS.. OK ENOEDR AS REWIRED BY THE LAM 9RVEYNS ACT. 8. CONTRACTOR AGREES THAT HE STALL ASSURE SOLE NO COMREA ESPONSBU1Y FOR THE JOB SITE CNCINNS WRING DE COURSE O CONSTRUCTION Cr THIS PROECT, M.P. SAFETY O AL. PERSONS AM PROPERTY: THAT MS ROIEMENT 94ALL APPLY CONTWRIOUSY NO NOT E WAD TO NORMAL TIMING HOORS AHD THAT THE CONTRACTOR SNAG OEFDD, POEM, AM HOD THE OMER AM THE ENGINEER HARNESS FROM ANY AND ALL WELTY, REAL OR ALLEGED, IN CONECIIN NTH THE PERRRMNDE O WORK N MIS PROJECT. EXCEPT FOR HABIUTY ARISING ERN ME SOLE NEW.. OF NE DIRER OR TIE ENINNEEA. 9. CONTRACTOR NI WA PRORATION EXCAVATIONS AD LOCATE EASING UNDERGROUND TAQIIES SFFILIENTY AHEAD O CONSTRUCTOR TO PERI. RUMORS TO PUNS N REMSNS ARE NECESSARY BECAUSE O ACTUAL LOCATION GE MING F.PES. 10. LOCATION AND ELEVARN O ARROW -VENTS TOE YET BY WORK 10 E DOE STALL E O ERN. BY FED YEASRO[NT PRIOR TO CONSTRUCTION OF NEVI .K. EFOE EXCAVATING FOR TIE CNMACT, VERIFY LOCATION O OLOGROUM UTILITIES. ME EXISTENCE AND LOUDEN N O ANT UDERWOOD URUTY PPES OR STRUCTURES WOW N THE P,N15 1EKE WANED Br A SEIRM OF THE AVAAABLE RECORDS TO TIE BEST Cr OUR PORED. TEE ARE M OTER DOSING UTAUIES EXCEPT AS SHORN N TILE RATS 12 NEITHER THE ONEEL NOR 11E ElN,FEEIR-CE-WON NU. EKORCE SAFETY MEASURE OF 22115 S. THE CONTRACTORMIN TRACTOR E DESIGN, CONSTRUCT AM MAINTAIN ALL SAFETY DEVICES, INCLUDING MOWING AM SHALL E SOLELY RSPN9EE FOR CO RAN. TO ALL LOCAL, STATE AND FEDERAL SAFETY ARO HEALTH STADNDS LAWS AND REGULATORS. 11 ASPECT. NOTES M WOW SHALL E COMMENCED N THE SIR PRIOR TO A PRE -CONSTRUCTION MEETING WITH THE RHG DEPARTMENT. CALL THE CITY CONSTRUCT ON NON A AT (619) 336-4380 TO SCHEDULE00.81 4A MEETING. 14. ALL OPERATIONS CONDUCTED CH ME PREMISES, INCLUDING THE WANING 11P, REPAIR ANN.- DEPARTURE, OR RUNINC O TRUE( EMINOMIG EMINENT, CONSTRUCTION E(AFMENT, NO NIY OVER ASSOCIATED EaiTMT WALE LOPED TO THE PERIOD BETTOR 7. AM. AND 500 P.M. EACH DAY, YONDAY THROWN ANAT. PRIOR APPROVAL Cr THE CITY ENGINEER WILL E REWIRED fOR WON BEFORE POD AM. NO AFTER 5:00 P.Y. 15 STRUCTURAL SECTORS OF DE STREET PENT MULL BE PER PUN. BUT NOT LE. THAN DE NOMN REDIfl ME011) 91115 PER MAMMAL CRY STANDARD ORATING M. 16. DIE ASPHALT COC ETE PAMaE17 SHALL E INSTALLED M A MNNN O 110 IFTS TIE FMAL LIFT SHALL E AT LEAST 1-1/2 Nat DNB ND SHALL E PAVED AF1ER CNPLETKN OF ALL STRUCTURES 17. RANGE CIDER OINK( DRERS SHALL E EOUE'S1ED N ORIIIMG UNNG THE OTY O NRTKNAL CITY STANDARD FOAL AND ATTACHED NTH PLANS 9KMING N RED DE REM9N5 FOR APPROVAL. UTILITY NOTES I. ME EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES OR STRICTURES WORN N TREY PUNS WAS DEIERNNED FROM A YARN O AVAILANI NUB1C RECORDS. THE CONTRACTOR'S ATINTIDN S E(C1ED TO THE POSSE. ED51DKt OF UNDERGROUND P*O11(S NOT MORN OR N A LOCATION D1OEIT FROM THAT SHOWN N ME PLATS M CONTRACTOR STALL DERHNE THE LOCAL. AND DEPTH O ALL UTILITIES, NCLUONG SERVILE CONIECIXNS THAT MAY AGENT OR E AFFECTED BY NNS .RATIONS AND SHALL TAKE AMaATE WJLSU ES 10 PROTECT THE UNDERGROUND UNDIES SHORN N NE RAMS AO NOSE FAUNS ENCOUNTERED 1R8G CNSIRUCIKN BUT NOT MORN N TIE PUNS 2 PURSUANT TO STATE LAW, .TRACTOR SHALL CONTACT L.NUEFOROUND SERVICE PERT (USA) AT 1-BE0-227-2600 OR 19-I-1 NOT LE. MAN TWO (2) NOENG DAIS PRNOR TO CONDUCTING ANY EXCAVATOR` WORK N THIS PROECT. MS RECURRENT WALL BAD TO EXCAVATION NOUN CONDUCTED WDM PUBLIC RIGHT-OF-WAY AND TO EXCAVARN WORK CONDUCTED N PRIVATE PROPERTY. THE CONTRACTOR SHALL MARK OUT THE APPRO RIME UNITS Of ME PROPOSEp EXCAVAl10N PRIOR TO CALLING USA N ORDER TO ASSIST THE EXISTNO UTILITY OWNERS N NOFRSTANDNG THE WITS OF ME REQUIRED PREMARK SERVICES EASING OWES N COFUCT WM ME PROPOSED WORE WALL E REMOVED, RELOCATED, OR ADAUSTED BY TER R9ECTKVE OWNERS UNLESS MENN E STECPED. TIE CNNACTOR 5 REFERRED TO SECTION 5 Cr ME STANDARD STOMA.. ME COMAE,. SHALL WW1 THE LOCATION O ALL EXISTING FACILIIES (BELOW GROUND AND MOVE GROUND) WTHN TIE MOOT SW SUFFOJERTY AHEM OF CONSTRICTOR 10 PENT TIE REVISION O THE CONSR,UC. RAPS IF IT IS FORD THAT ACTUAL LOCATIONS LIEN CONFLICT MIN M PROPOSED WORK APIs NODE SHALL E A- THE CNIRAC.5 ORME 1 NE CONTRACTOR SHALL RARITAN 1E YKEWE O ALL EXISTING WATER AND SPIER UTUTES DEED COISTRUC1KN. 1E CONTRACTOR SHALL E BE.ON9EE FOR AN" DAMAGE TO EXISTING WATER AM SEWER MANS WRING CONSTRUCTION, AND SHALL RAVE AVM' PIPE. HATER ALS AM EOIPMERT NSW TO NNEIXATELY REPAIR MY DAMAGE TO EXISTING MANS. JT 0AL BOORS W DIG TOLL FREE ' i-06227-2601 A PARK -+ MERV uomwoG+D SEANCE MX. JULY 2015 Kimley»> Horn .1 W Stem, SNN9 600. Sal Nom, Cal.. 92101 PAaw: 619.23A.9411 I NNN.APHRT-Narn.csn STOP R1-1' ,BIKE LANE, R81(CA) R1-5A OHO 18TH STREET HSIP CONSTRUCTION DOCUMENTS CITY OF NATIONAL CITY --- '.� i301111111111111111111111111111111•111 11711.1111111i01•l11w.11l•- /` if1luid=A•■ MIME HEM !i 1111P1� SPEED LIMIT 35 82-T(35) SCHOOL SPEED LIMIT 25 CMIL D!>EN ARE PiESEM MIA(CA) R8IB(CA) SR4-1)10) �itillllllll _PANT AREA GREEN WIN CHROMATICITY COORDINATES PER MINA INTERIM APPROVAL IA-14 MOM FOR GREEN BEE LANE. INSTALL 2' WRITE LIMIT LINE BIKE BOX DETAIL STOP HERE ItsTi RED LOCATION MAP PASSENGER LOADING ZONE 5 WAIF PARING OMIY w�aE PARKING TUESDAY 1>W'0 2Pu c ,rr R'0-5 R25C(CA) MOD R26(7)(CA) a-1 INSTALL Rto-6 SON l " tr %MTE EDG LINE (11111) _-_--INSTALL DEFAR 39A ~14 INSTALL •WAIT HERE WHITE PAVEMENT NARKING INSTALL 12' WHITE LIMIT UNE INSTALL 'BIKE LANE SYMBOL MTH PERSON' THERMOPLASTIC PAVEMENT MARKING PER CALTRANS REVISED STANDARD PLAN RSP A2.. SYMBOL SHALL BE CENTERED BETWEEN TIE LEFT EDGE OF ME BEE BOX AND THE CURB NO PEO CROSSING • USE CROSSWALK` SHEET LIST TABLE 1R�IWIR� 01 02 03- 05 06-07 NEST TIRE COVER SHEET KEY MAP SIGNING AND STRIPING PLANS SLURRY SEAL PLANS MERMOPLASDC . CONTINENTAL CROSSWALK (SEE PLANS FOR COLORS) CONTINENTAL CFIOSSWALK DETAL NOT TO SCA__ ME LANE FM PERSON SYMBOL PAVEMENT NARKING PER CAL1RAN5 STANDARD • PLAN A240 144110114 BIKE LANE WITH ARROW PAVEMENT MARKING DETAIL NOT TO SCALE PEDESTRIAN BARRICADE WITH R49 SIGN DETAIL; CALTRANS STANDARD PLANS ES-70 NOT TO SCALE ANE LANE NROW PER CALTRANS STANDARD PLAN A24A SIGNING AND STRIPING NOTES 1. ALL R0ERENCES TO ENE 'CITY SNAIL EIPU4D.Y REFER TO DE 'OTT OF NATIONAL CITY. 2. NISTAILA. OF ALL SINS, STRIPNC, PAVEMEM YIAKMGS, AND PAVEMENT MISERS SHALL BE NE RE9ONSBIUTY OF ME CONTRACTOR AND STALL CONFORM 10 THE ROST RECENT EDITOR O. THE FOLLOWING STANDARD RUNS ND AMMATT. A CNFORNA MANUAL N UNWORN TRAFFIC CONTROL DEVICES (CA-MUICD). B. STATE OF CA UFOMA DEPARTMENT OF TRNISPORTAl10N (CN.A.) STANDARD PUNS O. STATE O C.O.. DEPARNENT OF TRANSPORTAINN (CALTRANS) STANDARD SRECIFICATONS 0. STANDARD SPEaF1CATIONS FOR NARK WORKS CNS1N11CnN ('OREE1600K'), NaWND ALL CUR. SIRIPSTR 1PPRE11ENR J. All SIGHS, STRAIN, PUVOEIT M/RDNGS, AND PAVEMENT MARKERS ARE SUBdCT 10 THE APPROVAL O THE CITY ENGNEFR PRIOR TO WALLA. AND/OR REMOVAL 4. .TRACTOR SHALL SAINT PRODUCT YNDALS AD SPECIFICATIONS FOR TERYOPUSTC MAIM. AT DE PR -CONSTRUCTION WING FOR APPROVAL BY 111E CITY ENGIN. 5. CONTRACT. SHALL NOTIFY THE CITY ENGINEER OR NIS REPRESENTATIVE A MANDY OF 1 WEER IN ADVANCE TO SCHEDULE A FEED 'WALK THROWN' TO HARK -ALLAY NL 9. 00(08(tm FOR REMOVAL, REPLAa101T, AND/OR RELOCATION, AND TO 'MARK-QUY THE LOCATIONS FOR PLACEMENT OF NEW AND/OR RELOCATED 9NS 6. CONTRACT. WALL CLEARLY 1ARK-our THE LOCA110N5 1 ALL NEI STRIPING AND PAVEMENT MARIO. PRIOR TO NSTALIATION. ME CONTRACTOR STALL NOTIFY TIE OTT ENGINEER OR HIS REPRESENTATIVE A WWI O 1 REEK N ADVANCE TO SCHEDULE AN NSPECTIN O N'. 'MARK -OUTS". 7. CONTRACTOR WALL ROAM ALL CRINGING SAPP. AND PAVEMENT MMNGS BY WAR .851NG'. ALTERNATIVE MEMOUS MST BE PE -APPROVED BY TE CITY ENGIN.. ANY DEN. SHALL BE PROPTLY RDpVED BY ME CONTRACTOR. 8 CONTRACTOR SHALL ANON N.L. CRINGING RAND PAYMENT MARKERS PORN 10 STRANG. PAVOER TUTS DAMAGED NE TO DE REMOVAL CC MARKERS SHALL BE MEDATELY REPAIRED TO NE SATISTACMN OF TIE CIA ENGINEER. 9. SURFACES M401 ARE TO RECEIVE NEW SIPPING, PAVEMENT MARKINGS, UM PAWNINT MARKERS STALL BE CLEANED O ALL DAT ND LOOSE MATERIALS PRIOR TO NSA... O. AIL MIT IAIES/STOP BARS, CROSSNN0 LTES, AM INES 10 INCHES OR GREATER N ROTH SHALL • E 1ERMP1AS11C, (LESS OMERM9' SPECIFIED. 1. ALL TRAFFIC STRIPES 8 NOES OR LESS N MDN STALL E MAILED MN TWO COATS OF PAINT DE EAST COAT O PANT SHALL E DRY BET. APPLICATION O THE SECOND COAT PER ME LAWST STANDARD SPECIFICATION 2. FOR ALL ROADWAY CENTER). ROARING DOUBLE YELLOW TRAFFIC SNIPING, THE CONTRACTOR 94. CONOANNTLY PANT A 3-RILTI MOPE BACK STRIPE ETA. THE TWO hIYCH WIO YFLLOI SNIPES 1 AL LAKT IFIES/STOP BARS SHALL E LOCATED AT ME AOLONGATN OF TIE CENTER DELTA C' THE CURB RETURN OR BDINC PE PEDESTRIAN ACCESS RAP, UNLESS ONETIME 9PEME0. IF STRIPED CROSSWALK 1RTS. THE LINT L8E/S1TP BM SHALL E LOCATED A FEET N AMMO OF 11E CROSSWALK. 4. A. STAPNG SHALL EGN AM TRMNAIE AT QUARTER GELTA OF THE CURB, OR BAB O THE llL LNE/STOP BAR UNLESS ONERMSE SPECIFIED.5 ILL ►NI ENT MARKINGS SHALL E THERMOPLASTIC, UNLESS CREME SPECIFIED. . "SEW PAVOETIT MARKINGS SHALL E NSTA122 8 FEET N ADVANCE O THE OMIT UNE/510P BAR CN9STEN. NTH THE LATEST EDITION OP THE CA-MHUD. 17. CNTRACNOR SHALL *STALL BLUE RETROFTECTIVE RASED PAVEMENT MARKERS TO ESDNAIE THE LOCATION O ALL FIRE HYPTANTS, COMMIT WITH THE LATEST EDITOR CC THE CA-MTCD. a ALMOND SIRIPNG AD PAVEMENT MARKER DETAILS CHID OMEN90N5/ORACNG FOR PAVEMENT PARINGS SHALL CONFORM TO THE LATEST EDITIONS OF 111E CALA. SIAMARD PUNS AND CA a AP01PL10*1ICAION Of 'RAMC STRIPES. PAVEMENT MARKINGS, AND RAAOENT MARKERS SNAIL CONORY TO THE LATEST EDITION OF TIE CALTRANS STANDARD SPECECA.S 20.. 8 9MS 1*1D AM WRAC. INSTALLED BY TIE RAC. SHALL CONFORM TO THE STANDARDS PROVIDED N 11( 8E LATEST EDT* O 1E CA-MTCD. NaMNNG SIGN SIZE, SHAPE, COLOR. SYMBOLS RTROREFLECIIYTY, VERTICAL AM U.A1 MO N1NG OFFSETS, ETC AIL SIN FACE REREIWIIPC11vEGRAmn CORINE15 SHALL G). EC HIGH N1E , GRAM WIN A CLEAR PROTECTIVE OVERLAY Ell/ (LE. M( 21. ALL PEDESTRIANWALL CROSSNGFLUOR SAS, PR. IN C LOVI7NCED WARNING SIGNS AND SUPPLEMENTAL PUOUES STALL SE FLUORESCENT QEFN M CON. 22.. SIGN POSTS WALL BE Y-SQUARE, PERFORATED GALVANIZED STEEL NTH BREAK -AWAY BASE, PER CITY O NATIONAL CITY STANDARD ORATING M. 112-S-B, UNLESS 01.11SE SPECIFIED. 23.. SKIN POSTS SUIT E PTA.) 2 FEET ®M 714E FACE OP CRIB, UNLESS OTHERWISE SCORED. 24. AL RAISED MEDAN INSET SHALL E PANTED 1U 25. CONTRACTOR IS RESPONSIBLE FOR REPAG ALL WD NAM. 110M THE PROJECT LINTS 28 CONTRACTOR SHALL NOTIFY THE CITY NONEER OR HIS REPRESENTATIVE A MINIM OF 1 MEEK P80R TO O. ENIN OF ALL SONIC AND STRPING NON TO SCHEDULE A FINAL INSPECTION. 27. MEN NST8IED N THE PAN OF NAVEL, R99(CA) SHALL E POSTED M LESS MAN 80 N0E5 FROM TIE BOTTOM OF THE SIN TO FRANC SPACE 91,4191ED NAM. 28 M(N COSSNNK ND UNIT UNE SIRPNG NEEDS TO E INSTALLED OVER CONCRETE, CONTRACTOR SHALL USE 314 TAPE. 29. ALL EMSING THERMOPLASTIC SAPNG OR REMORA.. PAVEMENT MARKINGS N CNFUCI MN TER STRIPING PER PUNS STALL E REMOVED 'BY WATERBAS'INC PROP TO SLURRY SEAL. STANDARD SPECIFICATIONS + STANDARD DRAWINGS I. SARI REGO AaA RENAL SINDAM NANNGS (SDRSD) (2012 EDITOR) WIN APPENDIX A, (17A0 CONTRA PLANS). 2 STANDARD SPEOFICAITN6 FOR MEMO WORKS CNS1RUC1N ('GREO, BOB'). 2012 EDITION. I0CL101NG WEOONAL S INNER, MENU RENTS. 1 CALTRNIS YAWN. O TRAFFIC CONTROLS FOR CNSTRUCTKN AND MMITNANO WORK ZONES, CHAPTER 5. 4. CITY O NATIONAL 01Y STAMARO DRAI NGS, (CURRENT EDITION). 5 WATER ACENCTS STANDARDS (OURRENT E31041) WRN.SDWAS.COM. DECLARATION OF RESPONSIBLE CHARGE THE CITY ENGINEER ADOPTS THESE PLANS AND THE ACCOMPANYING SPECIFICATIONS AND DETAILS ON BEHALF OF THE CITY OF NATIONAL CITY, CITY COUNCIL CITY ENGINEER DAZE KIM DEQME TINT w PE OMEER CA - FOR NIS PUOIECT, NAT INN[ DM= RESPONWILE C MRRC CM, TIE DEW:* OF 1145 PROJECT AS DER. N SW. 6103 OP PE S SRESS AID PORSSONAL MO PAGE ME on. 6 CUSRM RIM NSSRgF1CS UDASTMD TAT THE OEOI OF DESE MELT MM. MD SFECDGTpRS Fr M Oh Cr 1M . OP 6 CONWED TO A IEVEW QILT MD DOES THIN MIK r a DORMER K W M OFw RESKOMIL16 NR TIE POECT 0EW1. ^- CALIEONRN4 -• NATIONAL C/Ty MAT( PUNS FOR THE NPRJtFYIXf OF. 111711 11061 HOP COVER !MEET CRY OF NATIONAL CRY NIRN YUTHUSNF•, RCE ]0011 A555TAM pRECTOR D< ENGNEERINO AND WBLO PLONKS NKNECT ND. 0958111'6 SPECRKAPN MC, SKET 01 lK 07 SQS 11034-0 CONSTRUCTION RECORDS 5 z o 5 5 5 UTILITY DEPARTMENTS p� N TRAFFIC SIGNALS k LIGHTING, LINDA BUSTARD SUBSTRUCTURES, FRED EATER AUTHORITY, FRANCISCO MONTIJO V1 5 k 5 5 cai i ENGINEERING DEPARTMENT 5 RE`/ I - RE,SED S@S ON ]BTH ST AND N IL _IT J AL BEFptE You DEG Two ATAKNG GAYS BEFORE YOU PG TOLL FREE -- I-800-227-2600 A PUBLIC - RWE BY UNDEPGRWYD SERVICE ALERT MATCHLINE - SEE ABOVE RIGHT 115' SMR TAP 5.5 SHIFT O 35 MPH 18TH STREET LEGEND NEW SIGN LOCATION (SINGLE POST) EXISTING SIGN LOCATION (SINGLE POST) SINS STREET NAME SIGN (XX•) EXISTING LANE WDTH XX' NEW LANE WIDTH OR LENGTH OF NEW STRIPING O STRIPING DETAIL PER LATEST CALTRANS STANDARD PUNS i TYPE IV ARROW PER CALTRANS STANDARD PLAN A24A "STOP' PAVEMENT MARKING PER CALTRANS STANDARD PLAN A24D -SLOW PAVEMENT MARKING PER CALTRANS STANDARD PLAN A24D !Pl "SCHOOL' PAVEMENT MARKING PER CALTRANS ilk STANDARD PLAN A24D 'XNG' PAVEMENT MARKING PER CALTRANS STANDARD PLAN A24D BIKE LANE WITH PERSON SYMBOL PAVEMENT MARKING PER CALTRANS STANDARD PLAN A24C O TRAFFIC SIGNAL SIGNING AND MARKING NOTES O1 EXISTING SIGN TO REMAIN ❑2 MATCH EXISTING STRIPING ❑3 REAMOVTEREBLASTINEXISTINGG STRIPING OR PAVEMENT MARKING BY W 4❑ FURNISH AND INSTALL THERMOPLASTIC PAVEMENT MARKING PER CALTRANS STANDARD PLAN. SEE LEGEND ON THIS SHEET. ❑5 FURNISH AND INSTALL THERMOPLASTIC BIKE LANE WITH ARROW PAVEMENT MARKNG PER DETAIL ON SHEET 1. © FURNISH AND INSTALL NEW 9. ON BREAK -AWAY POST PER CITYS STANDARD DRAWING NO. 112-5-B M INSTALL BIKE BOX PER DETAIL ON SHEET 1. B❑ FURNISH AND INSTALL TYPED DETECTION LOOP FOR NEW BICYCLE BOX. EXACT LOCATION OF DETECTION SHALL BE COORDNATED WITH THE CITYS TRAFFIC ENGINEER. FURNISH AND INSTALL ALL NECESSARY DETECTION CARDS AND UPDATE EQUIPMENT, AS NECESSARY, FOR THE PROPER BICYCLE DETECTION AT SIGNALIZED INTERSECTIONS. EPANT CURB RED. TO INSTALL 601EFT TURN BAY TAPER PER CALTRANS HIGHWAY DESIGN MANUµ TABLE 405.2A. CONTRACTOR TO ADJUST PLACEMENT OF TAPER BASED ON FIELD CONDITIONS. 12 NSTALL 12' WHITE THERMOPLASTIC UMIT LINE/CROSSWALK LINE PER CALTRANS STANDARD PLAN A24E 14 CONTRACTOR TO COORDINATE WITH CITY ON REMOVAL AND "•-""-"-'7 VEHI DETECT! LOOPS 15 FURNISH AND INSTALL E T PEDESTRIAN .BARRICADE PER'CALTRANS ES -7Q STANDARD PLANS ES-7Q WITH R49 SIGN ON BOTH SIDES,PER DETAIL ON'. SHEET 1. INSTALL WHITE CONTINENTAL CROSSWALK PER DETAIL ON SHEET 1 STRIPING DETAILS 0 INSTALL YELLOW CENTERLINE PATTERN (DETAIL 1) PER CALTRANS STANDARD PLAN A20A. 2© INSTALL TWO -DIRECTIONAL NO PASSING PATTERN (DETAIL 22) PER CALTRANS STANDARD PLAN A2DA. ® INSTALL WHITE CHANNEUZNG UNE (DETAIL 38) PER CALTRANS STANDARD PLAN A200. ® INSTALL WHITE CHANNEL121NG UNE (DETAIL 38A) PER CALTRANS STANDARD PLAN A20D. 39 INSTALL BIKE LANE LINE (DETAIL 39) PER CALTRANS STANDARD PLAN A200. 0 INSTALL BIKE INTERSECTION LINE (DETAIL 39A) PER CALTRANS STANDARD PLAN A200. GRAPHIC SCALE N FEET Kimley*Horn 401 B SbRRI. Suite 500. San Diego. CaMlNnb 92101 Plane RIR 234.0411 I nw..LM47-NNn.con, + CAL1PllM{A + NATIOriUMOrr .A.ea.aAL,w , PLANS =OR THE IMPROVEMENT OF 1BTH EITREET HEW BIG G AND BTRPNCI PLAN 18TH STREET HSIP CITY OF NATIONAL CITY KUIIA MLTM myRECT RCE T002 A5515TERI GREcroP IL ENCPEENNG AHD PUBLC WDRSS 4W04LT NO. 0958111+6 SIEET 05 Cf 07 SITS 11038-0 18th St. Bicycle Enhancements Project CIP No: 16-04 Contractor: Pavement Coatings Co. CHANGE ORDER NO. 2 September 28, 2017 Reason/Purpose for this Change Order: Adjustment of the contract unit price per Greenbook for the deletion of more than 25% of a bid item. The City of National City and Contractor agree to the following change to the original Contract: Due to a conflict with the city's existing traffic signal equipment, the city has deleted 4 of the 6 bike loops required per the project plans. Per Section 3-2.2 of the Greenbook, the contractor is allowed an adjustment of the contract unit price when there is decrease of more than 25% of a bid item. This change provides compensation for the reduction of the bike loops at the lump sum price listed below. Original Contract Amount Net change by previously authorized Change Orders Subtotal Amount of this change order 228,391.40 5,823.66 234,215.06 1,708.00 New contract amount $ 235,923.06 Working days added: 0 Su•, itted by: Working days subtracted: 0 Percent change in Contract to date 3.30% roj ct Manag Date . Ciy Project Manager Approved by: .2.. /o/s// Cit ngineer Date City Manager, required for Change Orders >$24,999 Date By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated its price, terms and conditions. If this Change Order is approved, Contractor wit provide all of the equipment, materials and labor necessary to provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees, bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents are incorporated herein. (2 originals: 1 for City Clerk, 1 for Contractor) Accepted and agreed to by (Contractor's name): pave,.,.„ Name: Sa0.0.'t% Co 8- t'7 Date Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim. Originals: City Clerk, Contractor cc: Engineering project file, Project Manager 1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380 Sean Gill From: Tom Mucenski <tom@pavementcoatings.com> Sent: Tuesday, June 27, 2017 9:58 AM To: Sean Gill Cc: Jessica Chin; 'Carla Hutchinson'; Bryan Boudreaux, STS-C; David Goan Subject: RE: 18th Street Loops Sean, We have been informed by Traffic Loops Crackfilling that they are requesting a unit price adjustment for Bid Item No. 4 (Type D Detection Loops) as the quantity has been reduced from 6 Ea. to now only 2 Ea. The revised unit price requested is $ 2,310.00 Ea. Please review and advise. Thank you. Tom Mucenski Pavement Coatings Co. 10240 San Sevaine Way Jurupa Valley, CA. 91752 Office (714) 826-3011 Cell (714) 713-7974 Fax (714) 826-3129 S.T.E.P. TO ZERO 3 ►. sa�iwa c in sio From: Sean Gill [mailto:sgill@iccsinc.net] Sent: Tuesday, June 20, 2017 7:19 PM To: Tom Mucenski <tom@pavementcoatings.com> Cc: Jessica Chin <jchin@iccsinc.net>;'Carla Hutchinson' <chutchinson@nationalcityca.gov>; Bryan Boudreaux, STS-C <Bryan@pavementcoatings.com>; David Goan <dgoan@iccsinc.net> Subject: RE: 18th Street Loops Tom, I received confirmation today from the city that the price is too high. Please direct your subcontractor to proceed with installing loops at 18th and Highland only. There was another plan sent to you for striping revisions. Are you going to submit a cost estimate for those? Thank You, Sean Gill Innovative Construction Consulting Services, LLC PO Box 6211 Norco, CA 92860 Phone: 951-532-6483 E-mail: sgill(a�iccsinc.net 1 CITY OF NATIONAL CITY Office of the City Clerk 1243 National City Blvd., National City, California 91950-4397 619-336-4228 Michael R. Dalla, CMC - City Clerk PAVEMENT COATINGS, CO. Change Orders #1 and #2 18th Street Bicycle Enhancements Project CIP No. 16-04 Judy Hernandez (Engineering/Public Works) Forwarded Copy of Change Orders to Pavement Coatings, Inc.