HomeMy WebLinkAboutAce Electric Inc. - El Toyon and Las Palmas Park Lighting Improvements Project - Change Order Nos. 5 through 9+�*» CAL.iFQRNIA
NIATIOZAL CITY
;1;CORP » rED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
Contractor: ACE Electric, Inc.
CHANGE ORDER NO. 5
September 6, 2017
Reason/Purpose for this Change Order:
There are cameras that are currently installed at the 12th and D roundabout location. The enclosures are
currently in poor condition and will need to be replaced. The engineer has recommended to install new
enclosures above grade to replace the old ones and reinstall all connections the the cameras that are currently in
place.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall install all materials and appurtenances provided in
exhibit A. The contractor shall install the Enable -it enclosure as per the plans provided by the engineer shown on
exhibit B. Additional nineteen (19) days will be added for this change order. The agreed upon price for all cost
associated with this work is a total of $9,1168.48.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal...
Amount of this change order
712,569.00
56,151.60
768,720.60
9,116.48
New contract amount $ 777,837.08
Working days added: 19 Working days subtracted: 0 Percent change in Contract to date 9.16%
Submi d , yr\
Project
ger
D 117'2-017
o
Approved by:
...
....,...
City ngineer
.. :....
962 if-)
Date .::: .
City Manager, required for Change Orders>$24,999 .
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepteca'rid agreed to by ACE Electric, Inc.:
Name::.:.. Date
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
sif711,0:7caoNRLIpc3v_LIED,„
CALIFORNIA +Ir `' ORA
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-08
DATE: September 6, 2017
WORK PERFORMED BY: ACE Electric, Inc.
CHANGE ORDER NO. 5
DESCRIPTION OF WORK: Installation and procurement of Enable -it Enclosures
Unit
Qty
Rate
Ext.
Installation of material and
1) appurtenances
HR
20.55
77.00
1,582.35
Sub -Total Labor:
$ 1,582.35
Mark-up:
$ 237.35
Unit
Qty
Rate
Ext.
1)
35"H x 12"W x 12" D SS N3R
Enclosure
EA
1.00
2,750.00
300.00
2,750.00
300.00
2)
18"H - 18"W - 18"D Concrete
Base
EA
1.00
3)
1/2" x 4" stainless steel wedge
anchor
EA
4.00
3.46
13.84
4)
3/4" x 10ft ground rod with
acorn clamp and no. 6 bond
EA
1.00
24.20
24.20
5)
2" SCH 80 conduit
FT
10.00
1.44
14.40
6)
2" SCH 80 90 elbow
EA
2.00
20.73
41.46
7)
2" PVC coupling
EA
2.00
0.87
1.74
8)
2" PVC bell end
EA
2.00
4.81
9.62
9)
1/4" pull line
FT
20.00
0.058
1.16
10)
Shipping for enclosure
EA
1.00
250.000
250.00
11)
Hand dig Trench
EA
1.00
10.00
10.00
12)
Hand dig concrete base
EA
1.00
20.00
20.00
13)
Reset existing pull box
EA
1.00
10.00
10.00
Sub -Total Material:
Sales Tax
Mark-up
$
3,446.42
$ 301.56
$ 562.20
Unit
Qty
Rate
Ext.
1)
ITI Cabling - installation of
cables and other materials
LS
1.00
2,715.09
-Up (10%)
Labor:
2,715.09
$ 271.51
Mark
Sub -Total
$ 2,986.60
SUB TOTAL:
$ 9,116.48
GRAND TOTAL:
EX11IOETt A- MATZWL kJP comer WELLATI
Ace Electric, Inc.
P.O. Box 601071, San Diego, CA 92160, Lic # 835109
Ph (619) 521-9740 Fax (619) 521-9742
Extra Work Proposal
Project: El Toyon & Las Palmas, National City
Subject: CR#05 - Enable -It Enclosure (Qty 1)
Date: 07/19/17
Ace Job # 1878
Ace FWO: na
Item
Description
Qty
Material
Mat'I Ext
Labor
Labor Ext
35"H x 12"W x 12"D SS N3R enclosure
1
2,750.00
2,750.00
6.00
6.00
#MCF-ICE-351212-SS
enclosure shipping
1
250.00
250.00
18"H-18"W-18"D concrete base, 3" AFG (3.4cuft)
1
300.00
300.00
5.00
5.00
1/2" x 4" stainless steel wedge anchor
4
3.46
13.84
0.20
0.80
3/4" x 10ft ground rod with acorn clamp & #6 bond
1
24.20
24.20
1.25
1.25
2" SCH 80 conduit, I/ft
10
1.44
14.40
0.06
0.60
2" SCH 80 90 elbow
2
20.73
41.46
0.35
0.70
2" PVC coupling
2
0.87
1.74
0.11
0.22
2" PVC bell end
2
4.81
9.62
0.17
0.34
1/4" pull line, I/ft
20
0.058
1.16
0.007
0.14
hand dig trench
1
10.00
10.00
1.00
1.00
hand dig for concrete base
1
20.00
20.00
2.00
2.00
reset existing pull box, add rock
1
10.00
10.00
2.50
2.50
SUB
ITI Cabling
1 LS
2,715.09
enclosures are stainless steel, no painting is included
enclosure locks are not included
Extension Totals
3,446.42
- 10."b5"
Sales Tax
8.75%
301.56
Materials with Tax
3,747.98
Labor Rate & Burden X Hours
77.00
20.55
1,582.35
Sub Total Materials with Tax & Labor
5,330.33
Mark-up on our work
15.00%
799.55
Subcontractor
2,715.09
Mark-up on Sub
10.00%
271.51
Sub Total
9,116.48
I UjA-
Bond
0.00%
0.00
-- -
9,116.00
Change Order Total
Proposal..
Customer
ATTN: Craig Small
Sr: Estimator/Sr. Project Manager:
Ace Electric, Inc.
6061 Fairmount Ave
San Diego, CA 92120 :
Direct: 619.814-4762 Off: 619.521-9740
Fax: 619.521-9742
Project Info
City of National City
El ToyonlLas Palmas Lighting
Quote#: 02F3434-I-NIB
Date: 7/19/17
ITI Contact
John Dunham
C: 858.776,8924
dunhamniticabling.com
P.O. Box 721025
San Diego, CA 92172
Scope Heading: Electrical
• Drawing 10710 D Construction Note 1 - Provide (1) New Enable -IT 865W PRO IP68 Rated Outdoor Waterproof Gigabit
PoE Extender Kit Which Includes: 360 56V— 60W IEEE 802.3at PoE-+ Injector and 865 Pro Quad LAN Controller Unit
(4 Lan Ports). ** City to install, connect and program Enable -IT equipment.
• Drawing 10710 D Construction Note 3 - From the Existing Enable -IT 865W PRO CPE, Re -pull existing Outdoor Rated
Shielded Cat6 cable from the Existing Pull box housing to the New Outdoor Enclosure provided and installed by others Per
the Conductor Schedule. ** It is assumed there is enough slack for the existing Outdoor Rated Shielded Cat6 cable at the
Existing Pull box to be installed to the New Outdoor Enclosure.
• Drawing 10710 D Construction Note 4 - Provide (1) New Enable -IT 865W PRO CPE Unit with 2 PoE Port Outputs. **
City to install, connect and program Enable -IT equipment and Existing Cameras.
Scope Reference Documents:
• Per Craig Small e-mail Fri, Jul 1.4,.2017 at 8:28 AM.
• DLV' 12th and D_ Cameras
The Following Low Voltage systems have been excluded from this Proposal:
• Enable -IT Installation, programming, commissioning and Patch Cords.
• Electronic Security System (ESS)
• Surveillance (CCTV)
Scope Assumptions:
• Total price is good for 60 days from bid date
• Permits and Bonds are not included.
- • Job will commence and materials ordered upon receipt ofa purchase order
• When required by written contract or agreement, endorsements included with this certificate are issued on a Blanket basis. Any
changes to the status of provided endorsements will be at the expense of the Contractor.
• Hourly rate is based on General Decision Number: San Diego County Determination SDI-2017-1 with pre -determined increase as
of 6-5.-17 until expiration of 6-4-18. Hourly rate based on 1st shift Hours.
ITI Cabling Inc. - P.O. Box 721025 San Diego, CA 92172 - P: 858.240.6670 l : 888.816.0686 CA I ie. ' 840341
•
• Clear and unobstructed cable paths for all cable runs.
• All conduits, Telecommunication Boxes to be provided by others and to have pull rope in place
• :: All (Nema 4X, 3R etc) to be provided and installed by others and to have pull rope in place
• Network equipment provided, installed and configured by others
• Final X-Connects by others
Work outside of the above mentioned drawings may be billed in addition to the given price
Slow -downs and or accelerated of the installation out of ITI's direct control may be billed via a change order
Scope Exclusions:
• Fiber Optic or Copper Backbone
• Outdoor Rated Shielded Cat6 cable from City Hall Building to the Existing Pull box
• BIM (Building Information Modelling) Services using Autodesk Revit or the like to include 3D Modeling
Total Project Total: $2,715.09
ITI Cabling Inc. P.O. Box 721025 San Diego, CA 92172 -- P: 858.240.6670 - F: 888.816.0686 -- CA Lie. 4 849343
Ace Electric, Inc.
6061 Fairmount Ave.
San Diego, CA 92120
Phone:619.814.4761
Request for Change Order
7/19/2017
TO: Vinnie Aquelo
Project Manager
PPC
4499 Ruffin Road, Suite 250
San Diego, CA 92123
Office 858.634.8180
JOB: 1878
Project: El Toyon and Las Palmas Park Lighting Improvement
Change Order Number: 05
OTHER INFORMATION:
WORK DESCRIPTION: Enable -It PRO POE & Enclosure
The total amount of this Change Order is: $9,116
Attached are the following supporting reports:
• Extra Work Proposal (Material Quantities, Prices and Labor Units with Extended Totals, Sub quote)
Clarifications:
• See attached sketch. Enclosure to be place next to existing pull box and adjacent to sidewalk. Shrub
to be discarded unless city removes. Irrigation will not be rerouted. Concrete pad will be flush with
sidewalk. Protection bollards are not included.
• Permits are not included. Traffic control is not included.
• The enclosure has a lead time of approximately 6 weeks plus shipping.
• Scope for the contractor, and city, is per drawing 10710 D provided, and ITI Cabling proposal dated
7/19/17. All cabling is existing. All work with regards to the existing cameras is by others.
Sincerely,
Eric Kliebenstein
T: \ProJects\NC\0232J<Imball Park\Cadd\DLV\DLV_12th and D_Cam
Plotted By. Ashley Ado
C1
a
N
SURVEYOR:
cn
0
a
0
CD
W
O_
CONSTRUCTION
INSPECTOR:
DATE COMPLETED:
TELEPHONE
0
m
co
(626) 320-0996
UTILITY DEPARTMENTS
ELECTRIC, MIKE WONG
COX COMMUNCATIONS, RAHIMA CLEVERS
AT&T SUBSTRUCTURES, FRED KRUSE
SWEETWATER AUTHORITY, FRANCISCO MONTIJO
CROWNCASTLE NETWORKS, PETER MATKOWSKI
0
o:
a
2-
m
xffiB'T B• a -Cc
•
CITY HALL
GENERAL CONSTRUCTION NOTES
1. CONTRACTOR MUST PERFORM SITE VISIT WITH CIT
2. CONTRACTOR SHALL PROVIDE EQUIPMENT SUBMIT'.
ORDERING.
3. NETWORK CONFIGURATION SHALL BE COORDIN.
CONFIGURATION.
4. TESTING AND VERIFICATION OF NETWORK COMMUNI
THE CITY.
5. CONTRACTOR SHALL CLEAN ALL EXISTING CON[
DEBRIS AND ENSURE THAT EXISTING CONDUCTORS
6. PULL BOX LOCATIONS SHOWN ARE APPROX
RESPONSIBILITY TO LOCATE PULL BOXES BASED
AND FIELD VERIFICATION OF EXISTING CONDITIONS.
CONSTRUCTION NOTES
�1 FURNISH NEW ENABLE -IT 865W PRO GIGABIT POE ETHEI
INCLUDING: 360 56V-60W IEEE 802.3at PoE+ INJECTOR
SHALL INSTALL AND REPLACE THE EXISTING ENABLE -IT
CO UNIT AND CONNECT TO THE EXISTING NETWORK SWI
OUTDOOR RATED SHIELDED CAT 6 CABLE PER MANUFAC
�2 FURNISH AND INSTALL METAL CABINET AND FIXTURE CO
VANDAL PROOF OUTDOOR ENCLOSURE (OR APPROVED E
CALTRANS STANDARD PLAN ES-2D. FOUNDATION DEPTH
DRS EXISTING ENABLE -IT 865W PRO QUAD LAN CPE UNIT.
CAT 6 CABLE FROM EXISTING PULLBOX TO PROPOSED C
® FURNISH ENABLE -IT 865W PRO QUAD LAN CPE UNIT WI'
CITY SHALL INSTALL AND REPLACE THE EXISTING 865W
EXISTING AVIGILON HD BULLET 3-9mm 5.0-H3-B01-IR
RATED SHIELDED CAT 6 CABLE PER MANUFACTURER'S 5
5. FURNISH AND INSTALL OUTDOOR RATED SHIELDED CAT E
D=GAqFir
DIAL I� TWO WORKING
BEFORE DAYS BEFORE
YOU DIG YOU DIG
TOLL FREE "'� 1-600-227-2600
A PUBLIC SERVICE BY
UNDERGROUND SERVICE ALERT
DETAIL 1
SCALE: 1 "=10'
D St
5865. AVENIDA ENCINAS SUITE 142B, CARLSBAD, CA 92008
PHONE: 760-602-4290 WVIW.STCTRAFFIC.COM
Nal aryl
nrommigatrox
PLANS FOR THE IMPROVEMENTS OF:
12TH S I HtET AND D AVENUE CAMERAS
ELECTRICAL PLANS
CITY OF NATIONAL CITY
KUNA MULHUSAMY. RCE 70024
AMPS!' DIRECTOR OF FNGINEERWG
AND PUBLIC WORKS
DATE
PROJECT ND. 095811005
SPECIFICATION NO.
sHEEr 1 OF 1 SHEETS
10710 D
PROJECT PROFESSIONALS CORPORATION
TRANSMITTAL COVER
To: National City Engineering Department
Project Name: El Toyon/Las Palmas Lighting Improvements, CIP No.
17-01
ITEMS DELIVERED:
Change Order No. 5
Delivered b
Received by:
Date: 1 1
I!i
Pro.ect Professionals Cor•oration
i CALIFORNIA *-�+
NATIONAL �f '
INCORPORATED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
Contractor: ACE Electric, Inc.
CHANGE ORDER NO. 6
September 29, 2017
Reason/Purpose for this Change Order:
This change order includes several items not included in the original contract: 1) adjustments were to be made
for the fiber optic/electrical conduits in the field 2) nstallation of new copper water line to provide water extending
to the shade structure on site 3) extension of the original length due to unforeseen site conditions 4) additional
concrete needed to be poured for the strip under neath the rolling gate 5) additional conduits needed to be added
for the facility and electrical trenching needed to be done 6) electrical outlets and access needed by facility to be
connected to the shade structure 7) adjustment to the installation of a gas line on site 8) placement of a new
concrete transformer pad on site
[The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with the following items: 1) relocation of
three (3) conduit sweeps 2) installation of a new copper water line with spicket connected from the trailer to the
shade structure 4) construct 50 LF of concrete footing for the gate track (rolling gate) 5) excavate electrical
trench from building to generator 6) installation of additional electrical conduit to extend access to shade
structure 7) modifications needed for the gas line 8) installation of a new concrete pad for transformer. The
agreed upon price for all costs associated with this work is $ 8,661.80.
Original Contract Amount $ 712,569.00
Net change by previously authorized Change Orders 65,268.08
Subtotal 777,837.08
Amount of this change order 8,661.80
New contract amount $ 786,498.88
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 10.38%
Approved by:
2
Cit ngineer..
hd-r/ice
Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Acceptgreed to by EIec, Inc.:
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
-)-{ CALIFORNIA, +
1C3CYtt
ZNCORPORATEp
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
CHANGE ORDER NO. 6
DATE: September 29, 2017
WORK PERFORMED BY: ACE Electric/MJC Construction
DESCRIPTION OF WORK: Various additional scopes of work for the FS 33 Facility
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Rate
Total
Relocation of three (3) pipe
1) conduit sweeps
EA
3.00
$862.00
$2,586.00
2)
Install new copper water line
with spicket
LS
1.00
$408.00
$408.00
3)
Installation of new gas line from
generator to building
LS
1.00
$860.00
$860.00
4)
Install concrete footing for the
track of the rolling gate
LF
50.00
$28.00
$1,400.00
5)
Excavate electrical trench from
building to generator
LS
1.00
$285.00
$285.00
6)
Install electrical conduit for
shade structure on site
LS
1.00
$325.00
$325.00
7)
Modification of existing
generator gas line
LS
1.00
$460.00
$460.00
8)
Installation of new concrete pad
for transformer
LS
1.00
$1,208.00
MARK-UP (15%):
$1,208.00
$1,129.80
Sub -Total Labor: 8 661.80
GRAND TOTAL:
CONSTRUCTION
LIC# 754128
3015 Sylvia Street
Bonita, CA 91902
PH: 619-472-5619
Proposal / Contract
Project#
Proposal Date: 9/20/2017
Proposal #: 021063
Bill To:
City of National City
1243 National City Blvd
National City, Ca.
Item
Description
Qty
Rate
Total
17-041-10
CHANGE ORDER #2
1. Relocate 3 pipe conduit sweeps @ $862.00 each ...($2,586.00)
2. Installation of new copper water line with spicket from trailer to
shade structure...($408.00)
3. Installation of new gas line from generator to building...($860.00)
4. Construct 50 LF of concrete footing for gate track @ $28.00 per
LF...($1,400.00)
5. Excavate electrical trench from builing to generator...($285.00)
6. Installation of electrical conduit for shade structure...($325.00)
7. Modification to existing geneator gas line...($460.00)
6,324.00
6,324.00
Approved By:
Total
$6,324.00
CONSTRUCTION
LIC# 754128
3015 Sylvia Street
Bonita, CA 91902
PH: 619-472-5619
Proposal / Contract
Project#
Proposal Date: 9/26/2017
Proposal #: 021065
Bill To:
City of National City
1243 National City Blvd
National City, Ca.
Item
Description
Qty
Rate
Total
17-041-12
CHANGE ORDER #3
1. Construction of concrete transformer pad...($1,208.00)
1,208.00
1,208.00
Approved By:
Total
$1,208.00
+}-CALIFORNIA
NATIONAL m
ntv
INCORPORATED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
Contractor: ACE Electric, Inc.
CHANGE ORDER NO. 7
October 5, 2017
Reason/Purpose for this Change Order:
Due to substandard condition of portions of pavement at El Toyon Recreation Center parking lot, it was
determined that new paving will be required to improve the site. An area of 120 feet by 20' will need to be re -
paved on site.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall remove and replace the paving for El Toyon
Recreational Center for an area of 120 ft by 20 ft.. The agreed upon price for all costs associated with this work
is $19,544.16.
Original Contract Amount
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount
Workingdays armed: 0 Working days subtracted: 0
712,569.00
73, 929.88
786,498.88
19,544.16
Percent change in Contract to date 13.12%
806, 043.04
Submitie b
Project
Ma.rag r
p Io
Date
ZDIl
Approved by
. .. ...... ...... ... .
Cit ngineer
.. .... ..:....i.e...e/./...?
:: Date
City Manager, required for ChangeOrders>$24,999
Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accepte an. agreed to b
A " E Elec
/
Nam- D
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
NATIONAL airy
e e
- INCORPORATED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
DATE: October 5, 2017
CHANGE ORDER NO. 7
WORK PERFORMED BY: ACE Electric/MJC Construction
DESCRIPTION OF WORK: Re -paving for the parking area at El Toyon Recreational Center
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Rate
Total
Additional paving of 120' x20'
1) area on site
SQFT
2,400.00
$7.60
$18,240.00
MARK-UP (7.1%):
$1,304.16
Sub -Total Labor: $19,544.16
GRAND TOTAL:
4,". CALIFORNIA
A ' 'I 'NAL CITY
100,
INCORPORATED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
Contractor: ACE Electric, Inc.
CHANGE ORDER NO. 8
October 5, 2017
Reason/Purpose for this Change Order:
Upon further inspection of the El Toyon Recreational Center parking lot, the engineer observed that additional
pavement repair is required. It was determined by the engineer that paving for an area of 120 feet by 10 feet will
be required.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall remove and replace the paving for El Toyon
Recreational Center for an area of 120 ft by 10 ft. The agreed upon price for all costs associated with this work
is $9,772.08.
Original Contract Amount
Net change by previously authorized Change Orders
712,569.00
93,474.04
Subtotal......... 806,043.04
Amount of this change order 9,772.08
New contract amount.........
Working days a• ded: 0 Working days subtracted: 0
Subm
Projecer
Approved by::
l0 1a 2017_
ate
Percent change in Contract to date 14.49%
815,815.12
City ngineer
....... n 7
Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporate;erein.
ate
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950 Telephone (619) 336-4380
0— CALIFORNIA
NATIoNAL
nay
INCORPORATED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS CHANGE ORDER NO. 8
CIP NO. 17-01
DATE: October 5, 2017
WORK PERFORMED BY: ACE Electric/MJC Construction -
DESCRIPTION OF WORK: Additional paving at El Toyon Recreation Center
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Unit
Qty
Rate
Total
1
Additional paving of 120' x10'
area on site
SQFT
1,200.00
$7.60
$9,120.00
MARK-UP (7.1%):
Sub -Total Labor:
$652.08
$9,772.08
GRAND TOTAL:
+�-• CALIFORNIA *�+
N.Kr,:rralloepti
INCORPORATED
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
Contractor: ACE Electric, Inc.
CHANGE ORDER NO. 9
October 5, 2017
Reason/Purpose for this Change Order:
There are currently no safety/security lights installed on the exterior of the structure for the Fire Station 33 facility.
The City has requested to install new lights to have visible lighting during evening operations and for the safety of
the occupants on site.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall furnish and install (4) LED wall pack lights on the
exterior of the structure. The contractor agree to install all hardware and appurtenances including branch circuit
breaker, conduit, wire, terminations. This change order also includes the testing of the lights. The agreed upon
price for all costs associated with this work is $3,632.00.
Original Contract Amount... $
Net change by previously authorized Change Orders ...............
Subtotal
Amount of this change order
712,569.00
103, 246.12
815,815.12
3,632.00
New contract amount $
Working days added: 0
Working days subtracted: 0
Percent change in Contract to date 1 5.00%
819,447.12
Sub
'tt d
�
- . .. .�...._�...._�.
Proje
M
a er
t0c 'lot?
D to
Approved y:
.......
Cit
2
. . . . .
ng ineer
1
1..4..,,E
Date
?
....
.:.:City
Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Name:
reed • b - CE'ric, Inc.:
I/f /22
ate
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
ATIU NAL Cinry
e e
-c-
INCO1
RPORATEI
EL TOYON/LAS PALMAS LIGHTING IMPROVEMENTS
CIP NO. 17-01
CHANGE ORDER NO. 8
DATE: October 5, 2017
WORK PERFORMED BY: ACE Electric/MJC Construction
DESCRIPTION OF WORK: Additional paving at Fire Station 33 temporary facility
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
Installation of (4) LED light
packs at Fire Station 33 Facility
Unit
Qty
Rate
Total
LS
1.00
$3,632.00
$3,632.00
Sub -Total Labor:
$3,632.00
GRAND TOTAL:
Ace Electric, Inc.
6061 Fairmount Ave.
San Diego, CA 92120
Phone:619.814.4761
Request for Change Order #08
09/18/2017
TO: Vinnie Aquelo
Project Manager
PPC
4499 Ruffin Road, Suite 250
San Diego, CA 92123
Office 858.634.8180
JOB: 1878
Project: El Toyon and Las Palmas Park Lighting Improvement
Change Order Number: 08
OTHER INFORMATION:
WORK DESCRIPTION: Add (4) Exterior Lights at Fire Station 33
The total amount of this Change Order is: $3,632.00 for the furnishing and installing (4) LED Wall
Pack Lights per attached Light Fixture Submittal. Includes branch circuit breaker, conduit , wire,
terminations and testing. Internal PC lighting controls only.
Attached are the following supporting reports:
• Extensions (Material Quantities, Prices and Labor Units with Extended Totals)
• Summary Totals (recap sheet)
• Detail Report
• Light Fixture Submittal
Sincerely,
Eric Kliebenstein
PROJECT PROFESSIONALS CORPORATION
TRANSMITTAL COVER
To: National City Engineering Department
Project Name: El Toyon/Las Palmas Lighting Improvements, CIP No.
17-01
ITEMS DELIVERED:
Change Order No. 6, 7, & 8, q
Delivered by: Arvsti Project Professionals Corporation
Received by:
Date:
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
ACE ELECTRIC, INC.
Change Orders #5 through #9
Park Lighting Improvements Project
CIP No. 17-01
Judy Hernandez (Engineering/Public Works) Forwarded
Copy of Change Orders to Ace Electric, Inc.