HomeMy WebLinkAbout2017 CON Portillo Concrete - Sewer Line Replacement Upsizing CIP 16-05 - Change Order #9 and #10AO". CALIFORNIA
NATI AL CITY
natr
INCORPORATED
Sewer Line Replacement and Upsizing (Phase I)
CIP NO. 16-05
Contractor: Portillo Concrete, Inc.
CHANGE ORDER NO. 9
September 14, 2017
Reason/Purpose for this Change Order:
During construction of the Plaza Blvd. portion of the work, it was found that there are 4 bus stops within the work
limits that do not have concrete bus pads. The City asked PCI to prepare a proposal to install the 4 bus pads.
Also, when PCI was potholing for the sewer lateral east of Harbison, they could not find it. However, during the
exploration, 3 panels of sidewalk were removed. This change order also includes the cost to restore the
sidewalk. Additionally, a saddle wye was required to tie in the lateral at 3005 E. Plaza. This cost is also included.
The City of National City and Contractor agree to the following change to the original Contract
The City and the Contractor agree that the Contractor shall proceed with the work described above and
particularly described in PCO 24 and PCO 25 and change order request dated 9/13/17, see attachment for cost
breakdown.
Original Contract Amount............
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount...
Working da s added: 0 ` orking days subtracted: 0
2,496,925.00
124,241.51
Percent change in Contract to date 6.60%
2,621,166.51
40,549.78
2,661,716.29
Project Manager
Lib 7
Date
0? ./;.,
Date
City Manager, required for Change Orders >$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Accep -d and agr- -d to • -ortillo Concrete, Inc.:
� .. ro,
Name: "tAe-( 1 r h
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the contract
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
i/ly/,7
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
CALIFORNIA
NA\UONAL
-e e
INCORPORATED
Sewer Line Replacement and Upsizing Project (Phase I)
CIP NO. 16-05
DATE: September 14, 2017
WORK PERFORMED BY: Portillo Concrete, Inc.
CHANGE ORDER NO. 9
DESCRIPTION OF WORK: Striping at 24th and National City Blvd.
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
1)
4 Bus Pads
$ 39,062.99
2)
.Sidewalk Panels
$ 592.56
3)
Saddle Wye
$ 894.23
TOTAL:
$ 40,549.78
POI
PCRTILLO
CQNCRETE INC
3527 CITRUS ST, LEMON GROVE, CA. 91945
OFFICE: (619) 466-4639
FAX: (619) 466-4685
Contract Change Order Request
DATE: 9/13/2017
PROJECT NAME: National City Sewer Upsizing Project
Description/Reason for Change:
Adding (4) bus pads for MTS
(4) Bus Pads are 40 x 10
Bus Pad
Unit
Qty.
Unit
Price
Demo
LS
1
$2,243.81
Grade / Set Up
LS
1
$2,341.68
Pour
LS
1
$3,917.27
Slot Patch
LS
1
$1,263.00
Total
$9,765.75
Price
Qty
Total
Bus Pad
$9,765.75
4
$39,062.99
'Bus Pad Total Change Order Amount
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours
Rate Extension
Crew truck
1 T.C. Truck
1 Ten Wheeler
Bobtail
Wacker
1 Saw Truck
1 Bobcat & Attachments
Kawasaki 65Z Loader
$27.33 $0.00
2 $27.33 $54.66
5 $45.00 $225.00
1
$40.00 $0.00
$25.00 $0.00
$50.00 $50.00
5 $50.00 $250.00
#90 pound jackhammer
5 Ton Roller
Equipment Move
Mini Excavator 80
Excavator 135 Link
$84.06 $0.00
$50.00 $0.00
$50.00 $0.00
$400.00 $0.00
$50.00 $0.00
$137.00 $0.00
Date
Job Name
Job #
T/M #
By
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
16-16
SMALLER BUS PAD
Mario Portillo
SCOPE OF WORK:
Bus Pad 40 x 10
Total 400 SF
14 yards of concrete
Demo
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
CL II Base
Trench Plates
Traffic Control
EA
EA
TN
TON
EA
LS
$35.00
$150.00
$32.50
$4.00
$12.00
1 $25.00
$0.00
$0.00
$0.00
$0.00
$0.00
$25.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor
Hours
5 $100.00
$500.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
Foreman - Reg
Cement Mason - Reg
Cement Mason - OT
Laborer - Reg - APP
$80.00 $0.00 Labor Mark-up
$88.50 $0.00 Total Prime Equip. Cost
$45.55 $0.00 Equipt Mark-up
$58.20 $0.00 Total Prime Mat. Cost
$36.25 $0.00 Material Mark-up
1 Laborer - Reg 2 $63.50
Carpenters - Reg
$127.00 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up
1 Laborer - Reg - APP 5 $36.25
1 Operator - Bobcat 5 $88.50
Operator - Excav
Operator - Loader
$181.25 Sub Total
$442.50 Office Overhead
$88.50 $0.00 Total
$88.50 $0.00 Bond
20%
15%
15°A)
5%
3%
1.5%
$750.75
$150.15
$579.66
$86.95
$25.00
$3.75
$500.00
$50.00
$2,146.26
$64.39
$2,210.65
$33.16
PROJECT / ITEM TOTAL
$2,243.81
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours
Rate Extension
2 Crew truck 2
T.C. Truck
1 Ten Wheeler
Bobtail
Wacker
Saw Truck
$27.33 $109.32
$27.33 $0.00
$45.00 $90.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
1 Bobcat & Attachments 2 $50.00 $100.00
Kawasaki 65Z Loader
#90 pound jackhammer
$84.06 $0.00
$50.00 $0.00
1 5 Ton Roller 2 $50.00 $100.00
Equipment Move
Mini Excavator 80
Excavator 135 Link
$400.00 $0.00
$50.00 $0.00
$137.00 $0.00
Date
Job Name
Job #
T/M #
By
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
16-16
SMALLER BUS PAD
Mario Portillo
SCOPE OF WORK:
Bus Pad 40 x 10
Total 400 SF
Grade and Set Up
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
Rebar
Cold Mix
CL II Base
Trench Plates
Traffic Control
EA
EA
TN
TON
EA
LS
$35.00
15 $5.55
$32.50
$4.00
$12.00
$25.00
$0.00
$83.25
$0.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor
Hours
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
1
Superintendent
$80.00 $0.00 Labor Mark-up
Foreman - Reg 2 $88.50
Cement Mason - Reg 2 $45.55
Cement Mason - OT
$177.00 Total Prime Equip. Cost
$546.60 Equipt Mark-up
$58.20 $0.00 Total Prime Mat. Cost
Laborer - Reg - APP 2 $36.25
Laborer - Reg 2 $63.50
Carpenters - Reg
Laborer Reg - APP
$72.50 Material Mark-up
$254.00 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up
$36.25 $0.00 Sub Total
Operator- Bobcat 2 $88.50
1 Operator - Roller 2 $88.50
$88.50 $0.00 Bond
$177.00 Office Overhead
$177.00 Total
Operator - Loader
$1,404.10
$280.82
$399.32
$59.90
$83.25
$12.49
$0.00
$0.00
$2,239.88
$67.20
$2,307.07
$34.61
PROJECT / ITEM TOTAL
$2,341.68
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours
Rate Extension
1 Crew truck
1 T.C. Truck
Ten Wheeler
Bobtail
Wacker
3 $27.33 $81.99
4 $27.33 $109.32
Saw Truck
Bobcat & Attachments
Kawasaki 65Z Loader
#90 pound jackhammer
5 Ton Roller
Equipment Move
Mini Excavator 80
Excavator 135 Link
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
$50.00 $0.00
$84.06 $0.00
$50.00 $0.00
$50.00 $0.00
$400.00 $0.00
$50.00 $0.00
$137.00 $0.00
Date
Job Name
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M #
By
SMALLER BUS PAD
Mario Partillo
SCOPE OF WORK:
Bus Pad 40 x 10
Total 400 SF
14 yards of concrete
Pour
1 Lab to Strip Later (TC Truck = Lumber Truck)
Materials
Qty. Unit Price Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
CTB
Concrete
Traffic Control
EA
EA
TN
SF
CY
LS
$35.00
$150.00
$32.50
400 $2.50
14 $12.00
$25.00
$0.00
$0.00
$0.00
$1,000.00
$168.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor
Hours
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
1 Foreman - Reg 3
2 Cement Mason - Reg 5
2 Cement Mason - Reg 3
Laborer - Reg - APP
$80.00 $0.00 Labor Mark-up
$88.50 $265.50 Total Prime Equip. Cost
$45.55 $455.50 Equipt Mark-up
$45.55 $273.30 Total Prime Mat. Cost
$36.25 $0.00 Material Mark-up
Laborer - Reg 3 $63.50
$63.50 $0.00 Sub Contractors Mark-up
$571.50 Total Sub -Contractor Cost
Carpenters - Reg
1 Laborer - Reg
Operator - Bobcat
Operator - Roller
Operator - Loader
$63.50 $254.00 Sub Total
$88.50 $0.00 Office Overhead
$88.50 $0.00 Total
$88.50 $0.00 Bond
$1,819.80
$363.96
$191.31
$28.70
$1,168.00
$175.20
$0.00
$0.00
$3,746.97
$112.41
$3,859.38
$57.89
PROJECT / ITEM TOTAL
$3,917.27
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
Equipment Hours
Rate Extension
1 Crew truck 2
1 T.C. Truck 1
1 Ten Wheeler 2
Bobtail
Wacker
Saw Truck
1 Bobcat & Attachments
Kawasaki 65Z Loader
$27.33 $54.66
$27.33 $27.33
$45.00 $90.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
2 $50.00 $100.00
#90 pound jackhammer
5 Ton Roller
Equipment Move
Mini Excavator 80
Excavator 135 Link
$84.06 $0.00
$50.00 $0.00
$50.00 $0.00
$400.00 $0.00
$50.00 $0.00
$137.00 $0.00
Date
Job Name
Job #
T/M #
By
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
16-16
SMALLER BUS PAD
Mario Portillo
SCOPE OF WORK:
Bus Pad 40 x 10
Total 400 SF
Slot Patch
Traffic Control Removal - 1 hr
Materials
Qty. Unit Price Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
CTB
Concrete
Traffic Control
EA
EA
TN
SF
CY
LS
$35.00
$150.00
4 $32.50
$2.50
$12.00
$25.00
$0.00
$0.00
$130.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor Hours
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost $621.50
Superintendent
1 Foreman - Reg
Cement Mason - Reg
Cement Mason - Reg
Laborer - Reg - APP
$80.00 $0.00 Labor Mark-up 20% $124.30
$88.50 $177.00 Total Prime Equip. Cost $271.99
$45.55 $0.00 Equipt Mark-up 15% $40.80
$45.55 $0.00 Total Prime Mat. Cost $130.00
$36.25 $0.00 Material Mark-up 15% $19.50
3 Laborer - Reg 2 $63.50
Carpenters - Reg
1 Laborer - Reg 1
Operator - Bobcat
Operator - Roller
Operator - Loader
$381.00 Total Sub -Contractor Cost $0.00
$63.50 $0.00 Sub Contractors Mark-up 5% $0.00
$63.50 $63.50 Sub Total $1,208.09
$88.50 $0.00 Office Overhead 3% $36.24
$88.50 $0.00 Total $1,244.33
$88.50 $0.00 Bond 1.5% $18.66
PROJECT / ITEM TOTAL
$1,263.00
# Equipment
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
2.5 Ton Lumber Trk
Saw Truck
Bobcat & Attachments
Kawasaki 65Z Loader
#90 pound jackhammer
Light Plants
Equipment Move
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
$50.00 $0.00
$84.06 $0.00
$50.00 $0.00
$22.00 $0.00
$400.00 $0.00
1 Excavator 80 2 $50.00
Excavator 225Link
$137.00
$100.00
$0.00
Date
Job Name
7/20/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 24
By Mario Portillo
SCOPE OF WORK:
Removal of sidewalk panels, pot hole and locate sewer
lateral at 2939 Plaza Blvd
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
Misc Material
Trench Plates
Bypass Plug
EA
EA
TN
LS
EA
EA
$35.00
$150.00
$32.50
$25.00
$12.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor
Hours
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
Foreman Reg
Cement Mason - Reg
Cement Mason - OT
Laborer Pipelayer
1 Laborer - Reg
Carpenters - Reg
1 Laborer - Reg - APP
Operator - Bobcat
1 Operator - Excav
Operator - Loader
$80.00 $0.00 Labor Mark-up
$88.50 $0.00 Total Prime Equip. Cost
$45.55 $0.00 Equipt Mark-up
$58.20 $0.00 Total Prime Mat. Cost
$63.50 $0.00 Material Mark-up
2 $63.50
$127.00 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up
2 $36.25
$72.50 Sub Total
$88.50 $0.00 Office Overhead
2 $88.50
$177.00 Total
$88.50 $0.00 Bond
20%
15%
15%
5%
$376.50
$75.30
$100.00
$15.00
$0.00
$0.00
$0.00
$0.00
$566.80
$17.00
$583.80
$8.76
PROJECT / ITEM TOTAL
$592.56
BILL TO
JOB NAME / LOCATION •
JOB NUMBER
JOB CODE
PORT1LLO
CONCRETE, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
FIELD EXTRA WORK REPORT I N 0.
2642
FOREMANCr
`' `
PO NUMBER / CCO NUMBER
WORKDATE
172
DESCRIPTION OF WORK
LABOR •
EMPL. #
CRAFT
NAME
0
1
2
og
a-
3
1a� �
Q�e� Nice_
4
5
6
7
8
9
10
RENTAL TRUCKING
COMPANY
TYPE OF TRUCK
TOTAL HRS.
1
2
3
4
5
COMPANY EQUIPMENT
RENTED EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
IN
i\ of \/1- C..t\ 1,:7-
g-
VENDOR
DESCRIPTION
HRS
MOVE
IN
MATERIALS / FEES
VENDOR
ZVVVDESCRIPTI°N
QUANTITY
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10/04)
AUTHORIZED - IGNATU
. c)c,
WHITE - Office YW - Invoice PINK - Customer Field Copy
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
2.5 Ton Lumber Trk
Saw Truck
Bobcat & Attachments
Kawasaki 65Z Loader
#90 pound jackhammer
Light Plants
Equipment Move
Excavator 80
1 Excavator 135 Link 1
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
$50.00 $50.00
$84.06 $0.00
$50.00 $0.00
$22.00 $0.00
$400.00 $0.00
$50.00 $0.00
$137.00 $137.00
Date
Job Name
8/2/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 25
By Mario Portillo
SCOPE OF WORK:
Install saddle at house address 3005
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
Misc. Saddle wye
Trench Plates
Bypass Plug
EA
EA
TN
EA
EA
EA
$35.00
$150.00
$32.50
1 $268.00
$12.00
$0.00
$0.00
$0.00
$268.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
Labor
Hours
HR
SF
SF
HR
LS
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
1 Foreman - Reg 1
Cement Mason - Reg
Cement Mason - OT
Laborer - Pipelayer
1 Laborer - Reg 1
Carpenters - Reg
Laborer - Reg - APP 1
Operator - Bobcat
1 Operator - Excav 1
Operator - Loader
$80.00 $0.00 Labor Mark-up
$88.50 $88.50 Total Prime Equip. Cost
$45.55 $0.00 Equipt Mark-up
$58.20 $0.00 Total Prime Mat. Cost
$63.50 $0.00 Material Mark-up
$63.50 $63.50 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up
$36.25 $36.25 Sub Total
$88.50 $0.00 Office Overhead
$88.50 $88.50 Total
$88.50 $0.00 Bond
$276.75
$55.35
$187.00
$28.05
$268.00
$40.20
$0.00
$0.00
$855.35
$25.66
$881.01
$13.22
PROJECT / ITEM TOTAL
$894.23
BILL TO
JOB NAME / LOCATION
qv,a,,� ( jot
se u C-(
Ugs.,ze...
JOB NUMBER
JOB CODE
PORT1L LO
CONCRE I t, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
FIELD EXTRA WORK REPORT IN 0 2644
FORE N
PO NUMBER / CCO NUMBER
WORKDATE
DESCRIPTION OF WORK
5c.,,,W c,,k- k.-6, )6c. . oLAc4re_s_s 3065'
LABOR
EMPL. #
CRAFT
NAME
0
1
2
3
4
5
cecz1•^e�
1
1
1
6
7
8
9
10
RENTAL TRUCKING
COMPANY
TYPE OF TRUCK
TOTAL HRS.
1
2
3
4
5
COMPANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
IN
1Y\ INiDe l 13G
(bob
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MATERIALS
/ FEES
VENDOR
DESCRIPTION
QUANTITY
`VG
_<<
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
THORIZ _ J- IGNAIWRE
1008 (10/04)
WHITE - Office YELLOW - Invoice PINK - Cu;tomor Field Copy
+}-, CALIFORNIA
N l_ I VJ 1NAL C J( r
INCORPORATED
Sewer Line Replacement and Upsizing (Phase I)
CIP NO. 16-05
Contractor; Portillo Concrete, Inc.
CHANGE ORDER NO. 10
October 4, 2017
Reason/Purpose for this Change Order:
During construction of the Plaza Blvd. portion of the work, it was found that there were several unmarked utilities
that required hand digging in order to install the sewer laterals. In addition, during potholing, 3 panels of sidewalk
were removed. This change order also includes the cost to restore the sidewalk. Additionally changes were
needed to the cross gutter at Harbison. This cost is also included.
The City of National City and Contractor agree to the following change to the original Contract:
The City and the Contractor agree that the Contractor shall proceed with the work described above and
particularly described in PCO 29, 30, 31, 32, 33, 34, 35 and 36. See attachments for cost breakdown.
Original Contract Amount... $
Net change by previously authorized Change Orders
Subtotal
Amount of this change order
New contract amount ... $
Working days added: 0 Working days subtracted: 0 Percent change in Contract to date 7.14%
Project Manager : Date
2,496,925.00
164,791.29
2,661,716.29
13,503.61
2,675,219_
[.pliN/l.7.
Approved by:
//a4-,
City ncg veer Date City Manager, required for Change Orders>$24,999 Date
By signing this Change Order the Contractor confirms that he/she is completely familiar with its terms and conditions and has fairly negotiated
its price, terms and conditions. If this Change Order is approved, Contractor will provide all of the equipment, materials and labor necessary to
provide a complete work as described above at that the price stated herein. Additionally, Contractor confirms that the price is fair and complete
and represents all costs associated with the work, including but not limited to all equipment, materials, labor, supervision, overhead, fees,
bonds, insurance, profit, etc. and that there will be no further compensation. All of the terms and conditions of the original contract documents
are incorporated herein.
Acce! -d and agr--;. ►,Portillo Concrete, Inc.:
Name:....... Chax.e( �� 1�
��
Date
trati �
Note to Contractor: If you do not agree with this Change Order you may be directed to proceed with this work under the terms of the co t
and you may proceed under protest. You must comply with the contract requirements of submitting a written protest to protect your claim.
Originals: City Clerk, Contractor cc: Engineering project file, Project Manager
n
1243 National City Boulevard, National City, CA 91950
Telephone (619) 336-4380
+ CALIFORNIA
ATI O NAL ells
INCORPORATED
Sewer Line Replacement and Upsizing Project (Phase I) CHANGE ORDER NO. 10
CIP NO. 16-05
DATE: October 4, 2017
WORK PERFORMED BY: Portillo Concrete, Inc.
DESCRIPTION OF WORK: Work around utilies and x-gutter
ACCOUNTING FOR TIME, MATERIALS, AND EQUIPMENT
2)
Sidewalk, grade, and compact
TM 29
$ 756.12
3)
Cut SW, Demo Sw, and pothole lateral
TM 30
$ 1,990.38
4)
Over -excavate substandard material
TM 31
$ 2,213.40
5)
Hand dig utilities not on plans
TM 32
$ 1,324.17
6)
Remove two sidewalk panels
TM 33
$ 1,871.25
$ 2,648.33
7)
Dig tunnel under utilities
TM 34
8)
Hand dig under utilities
TM 35
$ 1,986.25
9)
Replace native soil withrecycled base
TM 36
$ 713.71
$ 13,503.61
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
1 Wacker
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
1 $25.00 $25.00
Saw Truck $50.00 $0.00
Bobcat & Attachments 1 $50.00 $50.00
Kawasaki 65Z Loader $84.06 $0.00
#90 pound jackhammer $50.00 $0.00
5 Ton Roller $50.00 $0.00
Equipment Move $400.00 $0.00
1 Mini Excavator 80 1 $50.00 $50.00
Excavator 135 Link $137.00 $0.00
Date 8/25/2017
Job Name SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 29
By Mario Portillo
SCOPE OF WORK:
Repour, Grade and Compact
3-5'6"X5'6"
Sidewalk Panels & Tunnel under utitlities
Materials
Qty. Unit Price Extension
TRENCH SHIELDS EA $35.00 $0.00
2-24 X 8 EA $150.00 $0.00
Cold Mix TN $32.50 $0.00
Misc. Saddle wye EA $268.00 $0.00
Trench Plates EA $12.00 $0.00
Superior CY 1.11 $85.00 $94.35
Subcontractors
Rats Trucking (1 Equip move) HR
PRSI / Lindys SF
Pacific Oil Spreading SF
Trebor HR
Bypass Pump System LS
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Hours Rate Extension Total Prime Labor Cost $392.50
Superintendent $80.00 $0.00 Labor Mark-up 20% $78.50
1 Foreman - Reg 2 $88.50 $177.00 Total Prime Equip. Cost $125.00
Cement Mason - Reg $45.55 $0.00 Equipt Mark-up 15% $18.75
Cement Mason - OT $58.20 $0.00 Total Prime Mat. Cost $94.35
Laborer - Reg - APP $36.25 $0.00 Material Mark-up 15% $14.15
2 Laborer - Reg 1 $63.50 $127.00 Total Sub -Contractor Cost $0.00
Carpenters - Reg $63.50 $0.00 Sub Contractors Mark-up 5% $0.00
Laborer - Reg - APP $36.25 $0.00 Sub Total $723.25
1 Operator - Bobcat 1 $88.50 $88.50 Office Overhead 3% $21.70
Operator - Excav $88.50 $0.00 Total $744.95
Operator - Loader $88.50 $0.00 Bond 1.5% $11.17
PROJECT / ITEM TOTAL $756.12
BILL TO
JOB NAME / LOCATION
JOB (NUMBER. 10—
JOB CODE
PORT1LLO
CONCRETE, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
•
FIELD EXTRA WORK REPORT
RATEMAN
N2 2647
2-SZX3
PO NUMBER /UMBER
WORKDATE
DESCRIPTION OF WORK
()00 — (.5 t61( uc.AK
3- SG,")c5r6l1 cy145
it fl r(
LABOR •
EMPL. #
2 1 --
3
CRAFT
O0
NAME
qtcc‘;.e)c-
k.ekbe5C-
0
D
3
5
6
7
8
9
1
RENTAL TRUCKING
COMPANY
TYPE OF TRUCK
OTAL HRS.
1
2
3
4
5
1008 (10/04)
CO ANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MOVE
N
MATERIALS / FEES
VENDOR
DESCRIPTION
QUANTITY
err,tO(` Co c'e _.
3 5O Q3 V1 Cc 'c e
Y_‘1;»0;71
00 telr.3- rec/AirWHITE - ice YELLOW - Invoice PINK -omer Field Cop
# Equipment
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
Saw Truck
1 Bobcat & Attachments
Kawasaki 65Z Loader
#90 pound jackhammer
5 Ton Roller
Equipment Move
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
2 $50.00 $100.00
1 Mini Excavator 80 3.5
Excavator 135 Link
$84.06 $0.00
$50.00 $0.00
$50.00 $0.00
$400.00 $0.00
$50.00 $175.00
$137.00 $0.00
Date
Job Name
8/28/2017 - 8/29/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 30
By Mario Portillo
SCOPE OF WORK:
Cut 25' Sidewalk, Demo, 17' x 5' SW & Pothole for Existing
4" puc lateral, Backfilll.
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
Misc. Saddle wye
Trench Plates
Bypass Plug
EA
EA
TN
EA
EA
EA
$35.00
$150.00
$32.50
$268.00
1 $35.00
$0.00
$0.00
$0.00
$0.00
$35.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor Hours
Rate
3.5 $100.00
$350.00
$0.00
$0.00
$0.00
$0.00
Extension Total Prime Labor Cost
Superintendent
1 Foreman - Reg 3.5
Cement Mason - Reg
Cement Mason - OT
1 Laborer - Reg - APP 3.5
1 Laborer - Reg 3.5
Carpenters - Reg
Laborer - Reg - APP
1 Operator - Bobcat 3.5
Operator - Excav
Operator - Loader
$80.00
$88.50
$45.55
$58.20
$36.25
$63.50
$63.50
$36.25
$88.50
$88.50
$88.50
$0.00 Labor Mark-up
$309.75 Total Prime Equip. Cost
$0.00 Equipt Mark-up
$0.00 Total Prime Mat. Cost
$126.88 Material Mark-up
$222.25 Total Sub -Contractor Cost
$0.00 Sub Contractors Mark-up
$0.00 Sub Total
$309.75 Office Overhead
$0.00 Total
$0.00 Bond
20%
15%
15%
$968.63
$193.73
$275.00
$41.25
$35.00
$5.25
$350.00
$35.00
$1,903.85
$57.12
$1,960.97
$29.41
PROJECT / ITEM TOTAL
$1,990.38
IUT
JOB NAME / LOCATION
Q\Azc,
JOB NUMBER
Vo
JOB CODE
PORT L.L O
CONCRETE, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
FIELD EXTRA WORK REPORT
N2 2648
FOREMAN
C\
PO NUMBER / CCO NUMBER
WORKDATE
DESCRIPTION OF WORK
;,cAt3-L,c,\ ()o- Ccr el“&v:
6,
LABOR
EMPL. #
1
2
3
CRAFT
oe
NAME
coc-
0(k.-..ccAoc-
k.c,bec-
R
0 D
3;5
3�
3s
4
5
6
7
8
9
10
Wo
cvaA
36'
RENTAL TRUCKING
COMPANY
TYPE OF TRUCK
TOTAL HRS.
S�PG� LC)
2
3
4
5
COMPANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
as
:5
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MOVE
IN
MATERIALS / FEES
VENDOR
Oelv‘o
DESCRIPTION
QUANTITY
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10/04)
AUTHORI T ATU E
WHITE - Office YELLOW - Invoice PINK - Customer Field Copy
# Equipment
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
Saw Truck
1 Bobcat & Attachments
Kawasaki 65Z Loader
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00
4 $50.00
#90 pound jackhammer
5 Ton Roller
Equipment Move
Mini Excavator 80
Excavator 135 Link
Materials
$84.06
$50.00
$50.00
$400.00
$50.00
$137.00
$0.00
$200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Date
Job Name
8/28/2017 - 8/29/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 31
By Mario Portillo
SCOPE OF WORK:
Overexcavate 6" of Substandard Mterial in 10'x16' area.
Place a 10'x16' piece of tensar trianx, build up subgrade@ 6"x
10'x16' and Compact, lay down and tie-up @ 10'x16' #4 Rebar
Mat @ 16" on Center - 8/29- Over Ex. 6" of Substandard Mater
in a 13'x16' area, place a 13'x16' peace of tensar triax, build
back up subgrade @ 6"x10'x16' and compact, lay down and tie
up @ 13'x16' #4 Rebar Mat @ 16" Center and Drill and install c
Qty. Unit Price Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
CL II Base
Tensar
Rebar
EA
EA
TN
TON
EA
EA
$35.00 $0.00
$150.00 $0.00
$32.50 $0.00
11 $4.00 $44.00
1 $310.00 $310.00
30 $5.55 $166.50
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor Hours
Rate
3.5 $100.00
$350.00
$0.00
$0.00
$0.00
$0.00
Extension Total Prime Labor Cost
Superintendent
Foreman - Reg
Cement Mason - Reg
Cement Mason - OT
Laborer - Reg -APP 2
Laborer - Reg 2
2 Laborer - Reg 1
1 Laborer - Reg - APP 2
1 Operator - Bobcat 4
Operator - Excav
Operator - Loader
$80.00
$88.50
$45.55
$58.20
$36.25
$63.50
$63.50
$36.25
$88.50
$88.50
$88.50
$0.00 Labor Mark-up
$0.00 Total Prime Equip. Cost
$0.00 Equipt Mark-up
$0.00 Total Prime Mat. Cost
$72.50 Material Mark-up
$127.00 Total Sub -Contractor Cost
20%
15%
15%
$127.00 Sub Contractors Mark-up 5%
$72.50 Sub Total
$354.00 Office Overhead 3%
1.5%
$0.00 Total
$0.00 Bond
$753.00
$150.60
$200.00
$30.00
$520.50
$78.08
$350.00
$35.00
$2,117.18
$63.52
$2,180.69
$32.71
PROJECT / ITEM TOTAL
$2,213.40
JOB NUMBER
POR'T1LLO
CONCRETE, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
FIELD EXTRA WORK REPORT
N 0 2624
FOREMAN
S Aoo1rr' C.* AJ
PO NUMBER / CCO NUMBER
WORKDATE ,
$-Z8 E 8-2g_1+
'nue. DAYS OF Ti ti Gv Ortx
8-2 8-r "} - OtielLexCAVATr (a a iO T-' of 5u65rAa'OAfAE - Aip-0 A (bX 16 AAA I PVAc.c A, lbx tto P►G'GE OF tENSAe
DESCRIPTION OF WORK
Tialth% RU1LP BACK- u9 Eufd(oa-Ao a ,' X ic" X I(,'
l AND coriPa&'t'} uAr map -)map -)AND TtE-v P e iO' $ tt./ #4 I lAf- MoT
e (L," 0,J Gc, r f. + 8-2-`C -1-1= 04e.Re-xcAvare- b„ of Su2,9rANDACD MATled1AL IN A 13' X 16' Ad --A i PL,ICC. E A 13'X 110
rit; [.e OF E'EN SA - Tf24AX, (SU1tdo QAcit. u P SuaGa-RO tr e (.,, X io X U ' ADO Lot-4 PAC-1 I . (,AI' pot. r.) Art*) O 'C 15 — Of 6 13'X
I6' . 9 e MR- OAT'e it,- o,J C & ren FirJ o 'Dew, AND IN SCP u, Dou L S
LABOR
EMPL. #
CRAFT
NAME R
2
3
4
6
7
8
9
10
L
LAlc -
E• 01A
J A? ie-• ti
LAQ - p• SAN T1UW
LAB_
V. Qut�a
l
r
UPR• W l�AR6eA�E 5
RENTAL TRUCKING
COMPANY TYPE OF TRUCK
RATS
2
10 u.i1,15cL T-
TOTAL HRS.
3
5
COMPANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
IN
5770
BaecA-t'
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MOVE
IN
MATERIALS / FEES
VENDOR
DESCRIPTION
QUANTITY.
LA-tI m G4 P
�VQ
TC/J SA,tZ
So STtc,rc S
1t-(C4.4 uy I D /464 (246 ArrS
Gt,ASS It l-'L4(C.1 8AtF
!l rota
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10/04)
WHITE - Office YELLOW - Invoice PINK - Customer Field Copy
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
Saw Truck
1 Bobcat & Attachments
Kawasaki 65Z Loader
#90 pound jackhammer
5 Ton Roller
Equipment Move
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
$50.00 $100.00
$84.06 $0.00
$50.00 $0.00
$50.00 $0.00
$400.00 $0.00
1 Mini Excavator 80 2 $50.00
Excavator 135 Link
$100.00
$137.00 $0.00
Date
Job Name
8/29/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 32
By Mario Portillo
SCOPE OF WORK:
Hand dig under utilities not shown on plans
Houses 3032, 3024 6' under each
FO, TS, and Electrical 4 Pack in way
1 hour at each Location
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
Misc. Saddle wye
Trench Plates
Bypass Plug
EA
EA
TN
EA
EA
EA
$35.00
$150.00
$32.50
$268.00
$12.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor
Hours
$100.00
$200.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
Foreman - Reg 2
Cement Mason - Reg
Cement Mason - OT
$80.00 $0.00 Labor Mark-up 20%
$88.50
$45.55 $0.00 Equipt Mark-up 15%
$72.50 Material Mark-up 15%
$254.00 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up 5%
$177.00 Office Overhead 3%
$88.50 $0.00 Bond 1.5%
$177.00 Total Prime Equip. Cost
$58.20 $0.00 Total Prime Mat. Cost
1 Laborer - Reg - APP 2 $36.25
2 Laborer - Reg 2 $63.50
Carpenters - Reg
Laborer Reg - APP
$36.25 $0.00 Sub Total
1 Operator - Bobcat 2 $88.50
Operator - Excav
Operator - Loader
$88.50 $0.00 Total
$680.50
$136.10
$200.00
$30.00
$0.00
$0.00
$200.00
$20.00
$1,266.60
$38.00
$1,304.60
$19.57
PROJECT / ITEM TOTAL
$1,324.17
BILL TO
F..11
FIELD EXTRA WORK REPORT
N 0 2649
FOR
c4 2.2xso"'
JOB NAME J�
LOCATION
PO N`UMBER / CCO NUMBER
WORKDATE
5.e)-9-- �'7
kro_ii- 6 ����
�� .,,1 I
CONCRETE, INC.
JOB UMBER
JOB CODE
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
D IPTION F WORK
(,'u <Ne'`e-c _ e p1cA , 6 c {\c)' e\ fl' \c-G..4 M cc1i- ► v\ - (,,J0
, ,
‘,$ vr- \CSC'-; i0(1
LABOR
COMPANY EQUIPMENT
RENTED EQUIPMENT
EMPL. #
CRAFT
NAME
R
0
D
EQUIP. #
DESCRIPTION
HRS
mr
VENDOR
DESCRIPTION
HRS
M JE
1
4S? 6
c
14
)-
YGA r" iA % X
I
oZ
2
ID? 6'
0Q,esc.,c,c-
41
;)-
-bo\Dce.,i-
..g
a-,
3 ,t;'
ii
\Cn c
0
s;
4 /ON\
140
\AC)VC44(1-#6
D4
6
7
8
9
10
RENTAL TRUCKING
MATERIALS / FEES
COMPANY
TYPE OF TRUCK
TOTAL HRS.
VENDOR
DESCRIPTION
QUANTITY
2
0
Vcvi (gp5U�
3
ty!r 1tJ
_
-L1 ii V Jl?
'et
4
dt) IV f- lY 4 rt 0 es
5
\
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
rizE GNA
E
9-' Ile6/1\IC cZc7) [
WHITE - Office YELLOW - Invoice PINK - Cu Comer Field Copy
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
Saw Truck $50.00 $0.00
1 Bobcat & Attachments 3 $50.00 $150.00
Kawasaki 65Z Loader $84.06 $0.00
#90 pound jackhammer $50.00 $0.00
5 Ton Roller $50.00 $0.00
Equipment Move $400.00 $0.00
1 Mini Excavator 80 3 $50.00 $150.00
Excavator 135 Link $137.00 $0.00
Date
Job Name
8/30/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 33
By Mario Portillo
SCOPE OF WORK:
Remove two 5'6"X5;6" Sidewalk Panels, Tunnel under utitlities
Utilities not makred on plans extra time needed for digging.
FO TS four pack in way
Houses 3004, 2939
1 HR Each
Materials
Qty. Unit Price Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
Misc. Saddle wye
Trench Plates
Bypass Plug
EA
EA
TN
EA
EA
EA
$35.00
$150.00
$32.50
$268.00
$12.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR
SF
SF
HR
LS
Labor
Hours
2 $100.00
$200.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
1 Foreman - Reg 3
Cement Mason - Reg
Cement Mason - OT
1 Laborer - Reg - APP 3 $36.25
2 Laborer - Reg 3 $63.50
Carpenters - Reg
Laborer - Reg - APP
1 Operator - Bobcat 3 $88.50
Operator - Excav
Operator - Loader
$80.00 $0.00 Labor Mark-up
$88.50 $265.50 Total Prime Equip. Cost
$45.55 $0.00 Equipt Mark-up
$58.20 $0.00 Total Prime Mat. Cost
$108.75 Material Mark-up
$381.00 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up
$36.25 $0.00 Sub Total
$265.50 Office Overhead
$88.50 $0.00 Total
$88.50 $0.00 Bond
$1,020.75
$204.15
$300.00
$45.00
$0.00
$0.00
$200.00
$20.00
$1,789.90
$53.70
$1,843.60
$27.65
PROJECT / ITEM TOTAL
$1,871.25
BILL TO
JOB NAME // `LOCATION
V - -�
JOV�BE�
R PD.\ ucL
JOB CODE
PORThLO
CONCRETE, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
FIELD EXTRA WORK REPORT
r 3 0 0 7
FOREM
PO NUMBER / CCO NUMBER
WORKDATE
DESCRIPTION OF WORK
\ 00e, w 0 5 10( 5 " ec4\66
"u a O(R► c0 \Noosa. -300q aciack
U N '‘c.),S pci of\ a., °L.7c V c 4TC.,, c et.aecit
cVt_6 (N\ . *‘,.
LABOR
EMPL. # CRAFT
1
2
3.
w
NAME
Qe,C"CA-eg
R 0 D
3
3
3
4
5
6
7
8
9
10
tab
ck.N\thvcf,__
3
RENTAL TRUCKING
COMPANY TYPE OF TRUCK
TOTAL HRS.
1 CCAV'Cvc h\ •5C e' c" \O
2
3 .
4
5
COMPANY EQUIPMENT
EOUIP. #
DESCRIPTION
HRS
MOVE
IN
�yanivtor
6obcrsS-
3
3
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MOVE
IN
MATERIALS / FEES
VENDOR
DESCRIPTION
C� pp
OUANTITY
>t\I v:Ciec
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10/04)
Nc,
• WHITE - Office YELLOW - Invoice PINK • Customer Field Copy
# Equipment
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
Hours
Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
Saw Truck
1 Bobcat & Attachments
Kawasaki 65Z Loader
#90 pound jackhammer
5 Ton Roller
Equipment Move
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
$50.00 $0.00
$50.00 $200.00
$84.06 $0.00
$50.00 $0.00
$50.00 $0.00
$400.00 $0.00
1 Mini Excavator 80 4 $50.00
Excavator 135 Link $137.00
$200.00
$0.00
Date
Job Name
8/31/2017
SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 34
By Mario Portillo
SCOPE OF WORK:
Dig Tun under Utilities by Hand
Houses 3008, 3016 2930, 2914, under each
FO, TS, 4 Pack
1 hour at each Location
Materials
Qty. Unit Price
Extension
TRENCH SHIELDS
2-24 X 8
Cold Mix
Misc. Saddle wye
Trench Plates
Bypass Plug
EA
EA
TN
EA
EA
EA
$35.00
$150.00
$32.50
$268.00
$12.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move)
PRSI / Lindys
Pacific Oil Spreading
Trebor
Bypass Pump System
HR 4 $100.00
SF
SF
HR
LS
Labor
Hours
$400.00
$0.00
$0.00
$0.00
$0.00
Rate Extension Total Prime Labor Cost
Superintendent
1 Foreman - Reg 4
Cement Mason - Reg
Cement Mason - OT
1 Laborer - Reg - APP 4
2 Laborer - Reg 4
Carpenters - Reg
Laborer - Reg - APP
1 Operator - Bobcat 4
Operator - Excav
Operator - Loader
$80.00 $0.00 Labor Mark-up
$88.50 $354.00 Total Prime Equip. Cost
$45.55 $0.00 Equipt Mark-up
$58.20 $0.00 Total Prime Mat. Cost
$36.25 $145.00 Material Mark-up
$63.50 $508.00 Total Sub -Contractor Cost
$63.50 $0.00 Sub Contractors Mark-up
$36.25 $0.00 Sub Total
$88.50 $354.00 Office Overhead
$88.50 $0.00 Total
$88.50 $0.00 Bond
$1,361.00
$272.20
$400.00
$60.00
$0.00
$0.00
$400.00
$40.00
$2,533.20
$76.00
$2,609.20
$39.14
PROJECT / ITEM TOTAL
$2,648.33
BILL TO
JOB NAME / LOCATION
‘)CZ Q\CA,,,01 \
JOB CODE
JOB NVMBER
PORTILLO
CONCRETE, INC.
3527 Citrus Street • Lemon Grove CA 91945
Office: (619) 466.4639 • Fax: (61 9) 466-4685
FIELD EXTRA WORK REPORT
— 3 0 0 6
FOREM
`
PO NUMBER / CCO NUMBER
WORKDATE
g—'31..
DESCRIPTION OF WORK
r Ee'EjL"
LA.1;4, . by ‘\ckAcilL
LABOR
EMPL. #
CRAFT
NAME
0
D
2
Qe �
3 t�+
4
5
`emu
1/
y
6
7
8
9
10
RENTAL TRUCKING
COMPANY
1 CGS AWCt2
TYPE OF TRUCK
TOTAL HRS.
r \O
1/
3
.4
5
COMPANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
IN
1At\ Mex. tv i\-t,
Lj
`1
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MOVE
IN
MATERIALS / FEES
VENDOR
DESCRIPTION
OUANTITY
P`e-4
wry d o,Y cniy
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10✓04)
- WHITE - Office YELLOW - Invoice PINK - Customer Field Copy
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
Equipment Hours Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
Saw Truck $50.00 $0.00
Bobcat & Attachments 3 $50.00 $150.00
Kawasaki 65Z Loader $84.06 $0.00
#90 pound jackhammer $50.00 $0.00
5 Ton Roller $50.00 $0.00
Equipment Move $400.00 $0.00
1 Mini Excavator 80 3 $50.00 $150.00
Excavator 135 Link $137.00 $0.00
Date 9/1/2017
Job Name SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 35
By Mario Portillo
SCOPE OF WORK:
Hand Dig undr Utilities
FO TS four pack
Houses 2914, 2906, 2834
1 HR Each
Materials
Qty. Unit Price Extension
TRENCH SHIELDS EA
2-24 X 8 EA
Cold Mix TN
Misc. Saddle wye EA
Trench Plates EA
Bypass Plug EA
$35.00
$150.00
$32.50
$268.00
$12.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subcontractors
Rats Trucking (1 Equip move) HR 3 $100.00 $300.00
PRSI / Lindys SF $0.00
Pacific Oil Spreading SF $0.00
Trebor HR $0.00
Bypass Pump System LS $0.00
Labor Hours Rate Extension Total Prime Labor Cost $1,020.75
Superintendent $80.00 $0.00 Labor Mark-up 20% $204.15
1 Foreman - Reg 3 $88.50 $265.50 Total Prime Equip. Cost $300.00
Cement Mason - Reg $45.55 $0.00 Equipt Mark-up 15% $45.00
Cement Mason - OT $58.20 $0.00 Total Prime Mat. Cost $0.00
1 Laborer - Reg - APP 3 $36.25 $108.75 Material Mark-up 15% $0.00
2 Laborer - Reg 3 $63.50 $381.00 Total Sub -Contractor Cost $300.00
Carpenters - Reg $63.50 $0.00 Sub Contractors Mark-up 5% $30.00
Laborer - Reg - APP $36.25 $0.00 Sub Total $1,899.90
1 Operator - Bobcat 3 $88.50 $265.50 Office Overhead 3% $57.00
Operator - Excav $88.50 $0.00 Total $1,956.90
Operator - Loader $88.50 $0.00 Bond 1.5% $29.35
PROJECT / ITEM TOTAL $1,986.25
ILL TO
JOB NAME / LOCATION
£ems �p S' `a) 6IucL
JOB NUMB R ` JOB CODE
b k(o
PORThLO
CONCRETE, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
FIELD EXTRA WORK REPORT
n 3 0 0 5
FOREMA`.^`
1 ex:, Lin
PO NUMBER / CCO NUMBER
WO DATE
DESCRIPTION OF WORK
o ;Ts , 4-/ tocac,
LABOR
EMPL. #
CRAFT
NAME
0
1
cQ8
3
2
3
4
5
6
7
8
9
oQK
1c� fad
1a� l �QQcehi�
3
3
10
RENTAL TRUCKING
COMPANY
TYPE OF TRUCK
TOTAL HRS.
1 vc \tv
jciu\D
/43
3
4
5
COMPANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS vE
YC\(- rh;v/v.. X
›,r JS,I.cwn
RENTED EQUIPMENT
VENDOR
DESCRIPTION
HRS
MOVE
IN
vi,ii-g4;1 51417
MATERIALS / FEES
VENDOR
DESCRIPTION
OUANTITY
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10/04)
We/Arc,
WHITE - Office YELLOW - Invoice PINK • Customer Field Copy
PORTILLO CONCRETE, INC.
3527CITRUS ST
LEMON GROVE, CA. 91945
OFFICE (619) 466-4639
FAX (619) 466-4685
# Equipment Hours Rate Extension
Crew truck
T.C. Truck
Ten Wheeler
Bobtail
Wacker
$27.33 $0.00
$27.33 $0.00
$45.00 $0.00
$40.00 $0.00
$25.00 $0.00
Saw Truck $50.00 $0.00
Bobcat & Attachments 3 $50.00 $150.00
Kawasaki 65Z Loader $84.06 $0.00
#90 pound jackhammer $50.00 $0.00
5 Ton Roller $50.00 $0.00
Equipment Move $400.00 $0.00
Mini Excavator 80 $50.00 $0.00
Excavator 135 Link $137.00 $0.00
Date 8/23/2017
Job Name SEWER LINE REPLACEMENT AND
UPSIZING PROJECT (PHASE 1)
Job # 16-16
T/M # 36
By Mario Portillo
SCOPE OF WORK:
Over -Excavate saturated native soil and replace with CL II
recycled base
Compact @ 6 inch with approx. 6 tons
Materials
Qty. Unit Price Extension
TRENCH SHIELDS EA $35.00 $0.00
2-24 X 8 EA $150.00 $0.00
Cold Mix TN $32.50 $0.00
CL II Base TON 6 $4.00 $24.00
Trench Plates EA $12.00 $0.00
Bypass Plug EA $0.00
Subcontractors
Rats Trucking (1 Equip move) HR
PRSI / Lindys SF
Pacific Oil Spreading SF
Trebor HR
Bypass Pump System LS
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
Labor Hours Rate Extension Total Prime Labor Cost $402.15
Superintendent $80.00 $0.00 Labor Mark-up 20% $80.43
Foreman - Reg $88.50 $0.00 Total Prime Equip. Cost $150.00
Cement Mason - Reg 3 $45.55 $136.65 Equipt Mark-up 15% $22.50
Cement Mason - OT $58.20 $0.00 Total Prime Mat. Cost $24.00
Laborer - Reg - APP $36.25 $0.00 Material Mark-up 15% $3.60
Laborer - Reg $63.50 $0.00 Total Sub -Contractor Cost $0.00
Carpenters - Reg $63.50 $0.00 Sub Contractors Mark-up 5% $0.00
Laborer Reg - APP $36.25 $0.00 Sub Total $682.68
1 Operator - Bobcat 3 $88.50 $265.50 Office Overhead 3% $20.48
Operator - Excav $88.50 $0.00 Total $703.16
Operator - Loader $88.50 $0.00 Bond 1.5% $10.55
PROJECT / ITEM TOTAL $713.71
BILL TO
Csirk4 OF NATtoNAt' ct1
RA -LA It vo.
14-AR6lsd r Ave -
JOB NAME / LOCATION
JOB NUMBER
1b-tb
JOB CODE
DESCRIPTION OF WORK
V R - x JA
eels' A.r-iO GoMPACT
PORflLLO
CONCRE I I, INC.
3527 Citrus Street • Lemon Grove, CA 91945
Office: (619) 466-4639 • Fax: (619) 466-4685
(o" uJtTtk APKp
FIELD EXTRA WORK REPORT
N 2623
FOREMAN
SAooTtt
PO NUMBER / CCO NUMBER
t'o- tb
WORKDATE
Cc.
�i1„ -Cates
�1f�
LABOR
EMPL. #
CRAFT
NAME
R
0
D
2
r Ntc S.
�;. OtP
3
CPR.
p . Skr,)-c ub
3
4
5
6
7
8
9
.
10
RENTAL TRUCKING
COMPANY
TYPE OF TRUCK
TOTAL HRS.
1
2
•
4
5
COMPANY EQUIPMENT
EQUIP. #
DESCRIPTION
HRS
MOVE
IN
Goa c.pc-r
3
VENDOR
RENTED EQUIPMENT
DESCRIPTION
MATERIALS / FEES
VENDOR
DESCRIPTION
QUANTITY
Velet-P-e4 kewl
I HEREBY ACKNOWLEDGE THE SATISFACTORY COMPLETION OF THE ABOVE
EXTRA WORK OR SERVICES.
1008 (10/04)
AUTHORIZED SI
x
v,$o,RA.7,-1 tip..
/245.5
WHITE - Office YELLOW - Invoice PINK - Cu;tome.
SPY
'••�RATEU �"
mom_ ixx1111111m
CITY OF NATIONAL CITY
Office of the City Clerk
1243 National City Blvd., National City, California 91950-4397
619-336-4228
Michael R. Dalla, CMC - City Clerk
PORTILLO CONCRETE, INC.
Change Orders #9 and #10
Sewer Line Replacement and Upsizing Project
CIP No. 16-05
Judy Hernandez (Engineering/Public Works) Forwarded
Copy of Change Orders to Portillo Concrete, Inc.